Positron Source Target Update Tom Piggott Jeff Gronberg Lisle Hagler Dain Holdener Marty Roeben This work was performed under the auspices of the U.S.

Slides:



Advertisements
Similar presentations
I.R. Bailey, J.B. Dainton, L.J. Jenner, L.I. Malysheva (University of Liverpool / Cockcroft Institute)
Advertisements

Target Wheel Prototype Progress LC-ABD / LCUK – Apr Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
A Study of Mechanical and Magnetic Issues for a Prototype Positron Source Target The positron source for the International Linear Collider (ILC) comprises.
ILC positron source simulation update Wanming Liu, Wei Gai ANL 03/20/2011.
Ian Bailey University of Liverpool / Cockcroft Institute Target Design and Photon Collimator Overview EUROTeV: WP4 (polarised positron source) PTCD task.
Ian Bailey Lancaster University / Cockcroft Institute Baseline Target Prototype Status TILC09, Japan.
Ian Bailey University of Liverpool / Cockcroft Institute UK EUROTeV Photon Conversion Target Project EUROTeV: WP4 (polarised positron source) PTCD task.
Ian Bailey Cockcroft Institute/ Lancaster University October 30 th, 2009 Baseline Positron Source Target Experiment Update.
TARGET HALL OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Jan '09Positron Target Status1 Positron Target Prototype - Status Leo Jenner.
ILC Target Wheel Rotordynamics Lisle Hagler 5/23/2007 UCRL-PRES This work was performed under the auspices of the U.S. Department of Energy by University.
Prototype Status. 2 Status Update Safety Cage arriving soon Safety Cage arriving soon Torque transducer up and running Torque transducer up and running.
Tues Mar 24LC-ABD / LCUK, Bristol1 Positron Target Prototype - Status Leo Jenner.
Stewart Shen October 27, LCLS-XTOD Gas Attenuator LCLS FAC Meeting October 27, 2005 Stewart Shen, Keith Kishiyama and Marty Roeben.
Mon Oct 27LC-ABD, Dundee1 Positron Target Prototype - Status Leo Jenner.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
Tues Mar 24LC-ABD / LCUK, Bristol1 Positron Target Prototype - Status Leo Jenner.
Thu Oct 30ILC Positron Workshop, DL1 Positron Target Prototype – Current Status Leo Jenner Jim Clarke, Ian Bailey Ken Davies, Andy Gallagher, Lei Zang.
Status of Undulator-based Positron Source Baseline Design Leo Jenner, but based largely on a talk given by Jim Clarke to Positron DESY-Zeuthen,
Target Wheel Prototype Progress Zeuthen meeting – Apr 7-9 Leo Jenner & Ian Bailey Cockcroft Daresbury Laboratory.
Simulations of the Rotating Positron Target in the Presence of OMD Field* S. Antipov+, W. Liu, W. Gai Argonne National Lab +also Illinois Institute of.
Performance Studies on the Undulator Based ILC Positron Source Wei Gai ANL For ILC positron collaboration BAW II January 20, 2011,
Ian Bailey University of Liverpool / Cockcroft Institute Positron Source Target Development Update Collaborators STFC Daresbury Laboratory, STFC Rutherford.
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
Ian Bailey University of Liverpool / Cockcroft Institute ILC Baseline Target Collaborators STFC Daresbury Laboratory, STFC Rutherforord Appleton Laboratory,
Key luminosity issues of the positron source Wei Gai.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
Status of target and photon collimator work for polarized e+ LCWS 2014, Belgrade, Serbia 7 th October 2014 Sabine Riemann, Friedrich Staufenbiel, DESY.
Development of a Positron Production Target for the ILC Positron Source Capture Optics Positron beam pipe/ NC rf cavity Target wheel Vacuum feedthrough.
Ian Bailey University of Liverpool / Cockcroft Institute UK Target Update EUROTeV: WP4 (polarised positron source) PTCD task I. Bailey, J. Dainton, L.
Target Mechanical R/D Magnetic Immersion Effects (Daresbury Experiment) Pass-Through/Seals (Vacuum, Water union)- leaks, survivability Thermal Loading.
Radiation Cooling of the ILC positron target ALCW 2015, KEK, Tsukuba, Japan 24 th April 2015 Felix Dietrich (DESY), Sabine Riemann (DESY), Peter Sievers.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
Welcome and Introduction to the Workshop Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC Positron Source Collaboration Meeting 29 – 31.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
Ian Bailey Cockcroft Institute/ Lancaster University IWLC October 21 st, 2010 Overview of Undulator-Based Sources for LC.
May Global Design Effort Americas Slide 1 May 2007 ILC Positron Systems Update J. C. Sheppard and V. Bharadwaj SLAC May 7, 2007.
F.Staufenbiel / EuCARD 2 / Heat load and stress studies of the ILC collimator G. Moortgat-Pick 1;2 S. Riemann 2, F. Staufenbiel 2, A. Ushakov.
October 9th, 2007 Daresbury – Positron Kick-Off Meeting Slide 1 Remote Handling Vinod K. Bharadwaj SLAC October 9th, 2007.
Positron Source Update Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory ILC 08, University of Illinois at Chicago, 17 th November 2008.
Undulator Based ILC positron source for TeV energy Wanming Liu Wei Gai ANL April 20, 2011.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Ian Bailey Cockcroft Institute/ Lancaster University September 30 th, 2009 Baseline Positron Source Target Experiment Update LCWA09.
ILC Undulator Based Position Source Target System Wei Gai, HEP, ANL TB meeting 8/5/2014.
Oct. 6, ILC Positron Source Group Meeting Short report by S. Riemann September 2006, RAL.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
Liquid targets for positron production - ??? Jerry Nolen Physics Division, Argonne National Laboratory POSIPOL Workshop Argonne National Laboratory September.
Progress with Zeuthen Meeting Actions Jim Clarke ASTeC, STFC Daresbury Laboratory.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
Polarised Positron Source Target and Collimator
University of Liverpool / Cockcroft Institute
A Positron Target Concept for the ILC
Pair-Production Target
Positron Update ILC R&D Meeting/ March 12, 07 VB & JCS
Target and Horn status report
Spectrometer Solenoid Fabrication Status and Schedule
May 2007 ILC Positron Systems Update
CLIC Undulator Option for Polarised Positrons
Future Work Plan and Action Items
ILC RDR baseline schematic (2007 IHEP meeting)
1/10 prototype support tube
♠ ♠ ♠ ♠ ♠ ♠ ♠ ♠ Objectives القرص الدوار والدولاب مجلس أبوظبي للتعليم
May 2007 ILC Positron Systems Update
Heat Simulations with COMSOL
Summary for the Sources working group
Lithium lens and window tests
J. C. Sheppard SLAC September 29, 2006
Presentation transcript:

Positron Source Target Update Tom Piggott Jeff Gronberg Lisle Hagler Dain Holdener Marty Roeben This work was performed under the auspices of the U.S. Department of Energy by University of California, Lawrence Livermore National Laboratory under Contract W Eng-48. UCRL-PRES

Session Schedule Introduction (Piggott) - 5 mins Livermore update (Piggott) - 10 mins UK update (Bailey) - 10 mins Graphite/ liquid Pb development (Logatchov, presented by Bailey) - 5 mins Heat deposition, activation of target and capture system (Ushakov) - 30 mins Eddy current simulations (Rochford) - 10 mins Discussion - 20 mins Next Session OMD overview (Gronberg) - 20 mins OMD calculations, beam window heating (Gai) - 20 mins Lithium lens, solenoid focusing alternatives (Mikhailichenko) - 30 mins UCRL-PRES

Action Items from September Meeting Target prototype drawings (LLNL/RAL/DL) –In progress at LLNL and DL OMD forces –Presentations from RAL and ANL R&D timeline –Pending funding? Remote handling impact (RAL/DL) –Presentation in Target Hall session Alternative target materials (RAL/Liverpool) –In progress Beam window viability (ANL) –Presentation in OMD session UCRL-PRES

Current Target Design 1 m diameter, 5 spoke wheel Shaft support on both sides UCRL-PRES

Shaft Support on Both Sides Eliminates need for belt drive on motor Allows use of standard water union Requires two intrusions into vacuum space Reduces deflection of target wheel UCRL-PRES

Rotordynamic/Vibration Calculations Work was done for a four spoke, 2 m diameter wheel Rotordynamic analysis Structural/ vibrational mode analysis Vibrational mode study suggested possible issue near operating point, so shift to a five spoke wheel was implemented UCRL-PRES

Flywheel Critical Speeds (Two-End Support Design) 4/rev 1/rev Primary Critical Speed = 500 RPM 1 st Secondary Critical Speed = 120 RPM 2 nd Secondary Critical Speed = 170 RPM Primary Critical Speed Secondary Criticals Cylindrical Whirl Mode Forward Tilt Whirl Mode Backward Tilt Whirl Mode Support Translational Stiffness = 100,000 lbf/inSupport Rotational Stiffness = 10,000 in-lb/rad 900 RPM Operating Speed UCRL-PRES

Wheel Deformations (Two End Support) Static displacement of cantilevered design is 7.62 cm vs cm for support on both ends UCRL-PRES

Current/Future Work Redo thermal/structural calculations for 1 m wheel using energy depositions from simulations at SLAC/ANL Redo rotordynamic/ vibration calculations for 1 m wheel Working with metallurgist to address any issues from creep, fatigue, microstructure changes Incorporating results from eddy current simulations into structural and vibration calculations Continue working on prototype and experiment development UCRL-PRES