Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 ELECTRON CLOUDS AND VACUUM EFFECTS IN THE SPS Experimental Program for 2004 J.M. Jimenez Thanks.

Slides:



Advertisements
Similar presentations
Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
Advertisements

Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
R. Cimino COULOMB’05, Senigallia, Sept 15, Surface related properties as an essential ingredient to e-cloud simulations. The problem of input parameters:
Vacuum, Surfaces & Coatings Group Technology Department 04/12/2014 R. Salemme – COLDEX results during SPS Scrubbing Run I Electron Cloud Meeting #18,
SPS scrubbing run in 2014 H. Bartosik, G. Iadarola, G. Rumolo LHC Performance Workshop (Chamonix 2014), 22/9/2014 Many thanks to: G. Arduini, T. Argyropoulos,
Vacuum and Cryogenics observations for different bunch spacing J.M. Jimenez On behalf of CRG and VSC Groups with the contributions of G. Arduini, V. Baglin,
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
1 Electron Cloud in LHC V. Baglin CERN AT-VAC, Geneva 1. Mecanism and Recipies 2. LHC Vacuum Chambers 3. Diagnostics 4. Conclusions Vincent Baglin Electron.
Giovanni Rumolo, G. Iadarola and O. Dominguez in LHC Beam Operation workshop - Evian 2011, 13 December 2011 For all LHC data shown (or referred to) in.
Electron Cloud Simulations Using ORBIT Code - Cold Proton Bunch model April 11, 2007 ECLOUD07 Yoichi Sato, Nishina Center, RIKEN 1 Y. Sato ECLOUD07.
Electron Cloud Studies for Tevatron and Main Injector Xiaolong Zhang AD/Tevatron, Fermilab.
Simulations on the EC detector in MU98 A. Romano, G. Iadarola, G. Rumolo LIU-PS Meeting 28 April 2015 Many thanks to: M. Taborelli, C. Yin Vallgren.
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
Electron-Cloud Activities for LHC Frank Zimmermann ICE Meeting,
Beam induced heating assessment on LHC beam screens Arcs + DSs + ITs L. Tavian LBOC, 27 September 2011.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
Preliminary Simulation on Electron Cloud Build-up in SppC Liu Yu Dong.
Electron cloud SPS in 2012 G. Iadarola, H.Bartosik, F. Caspers, S. Federmann, M.Holz, H. Neupert, G. Rumolo, M. Taborelli LIU Beam studies review.
U. IrisoECLOUD’04 – 21 April ECLOUD’04 April , Napa, CA Use of Maps for exploration of Electron Cloud parameter space Ubaldo Iriso and.
C. Fischer – LHC Instrumentation Review – 19-20/11/2001 Gas Monitors for Transverse Distribution Studies in the LHC LHC Instrumentation Review Workshop.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Improved electron cloud build-up simulations with PyECLOUD G. Iadarola (1),(2), G. Rumolo (1) (1) CERN, Geneva, Switzerland, (2) Università di Napoli “Federico.
LHC Scrubbing Runs J.M. Jimenez On behalf of the Electron Cloud Study Team, a Collaboration between AT and AB Departments.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
CERN, LIU-SPS ZS Review, 20/02/ Brief review on electron cloud simulations for the SPS electrostatic septum (ZS) G. Rumolo and G. Iadarola in LIU-SPS.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Progress on electron cloud studies for HL-LHC A. Axford, G. Iadarola, A. Romano, G. Rumolo Acknowledgments: R. de Maria, R. Tomás HL-LHC WP2 Task Leader.
Simulation of multipacting thresholds G. Iadarola and A. Romano on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, 8 September, 2015.
Vacuum Devices for accelerator studies Bernard HENRIST CERN TE dept. – Technology Department VSC group – Vacuum Surfaces and Coatings OLAV III Oak Ridge.
Electron cloud in the LHC: lessons learnt from 2015 experience with 25 ns beams G. Iadarola, H. Bartosik, K. Li, L. Mether, A.Romano, G. Rumolo, M. Schenk.
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
FCC-hh: First simulations of electron cloud build-up L. Mether, G. Iadarola, G. Rumolo FCC Design meeting.
SPS coating studies 28 February, 2016TE-VSC1 Present situation of the development of e-cloud mitigation methods -MD 2011 results -Carbon coating of dipoles.
Pressure data from SPS MDw35 H.Neupert, M.Taborelli For SPSU, 23/09/2010.
LIU-SPS e-cloud contribution to TDR Electron cloud meeting, 17/02/20141 o First draft by end of February Between 5 to 10 max pages per chapter, refer.
E-cloud Remedies and PS2 vacuum design J.M. Jimenez AT Department – Vacuum Group CARE-HHH-APD BEAM’07 Thursday 04 October Session 2: PS2 E-cloud.
Comparison of stainless steel and enamel clearing electrodes E. Mahner, F. Caspers, T. Kroyer Acknowledgements to G. Arduini, H. Damerau, S. Hancock, B.
Simulation of the new PS EC detector: implementation and results A. Romano, G. Iadarola, G. Rumolo LIU-PS Student Day 20 April 2015.
Main Activities and News from LHC e-Cloud Simulations Frank Zimmermann ICE Meeting 8 June 2011.
Estimates of residual gas pressure in the LHC Adriana Rossi AT-VAC Workshop on Experimental Conditions and Beam Induced Detector Backgrounds April.
200 MHz option for HL-LHC: e-cloud considerations (heat load aspects) G. Iadarola and G. Rumolo HLLHC WP2 meeting 03/05/2016 Many thanks to: K. Li, J.
Electron Cloud Studies at DAFNE Theo Demma INFN-LNF Frascati.
Electron cloud measurements in Cesr-TA during the July-August run for the SPSU Study Team, report by S. Calatroni and G. Rumolo thanks to J.
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Benchmarking simulations and observations at the LHC Octavio Domínguez Acknowledgments: G. Arduini, G. Bregliozzi, E. Métral, G. Rumolo, D. Schulte and.
Vacuum Cleaning / Scrubbing measurements in the LHC J.M. Jimenez on behalf of G. Arduini, V. Baglin, G. Bregliozzi, P. Chiggiato, G. Lanza, OP.
Status of the electron cloud test-bench in LSS5 G. Arduini SL/OP Crash programme in collaboration with LHC/VAC,SL/AP,SL/BI,SL/MR,SL/MS,SL/OP,…
Electron Cloud Effects
S. Roesler (on behalf of DGS-RP)
Heat load estimates for the Long Straight Sections of the HL-LHC
Study of the Heat Load in the LHC
PyECLOUD and Build Up Simulations at CERN
Electron cloud & vacuum pressure observations: 2011 proton run
C.Octavio Domínguez, Frank Zimmermann
Electron cloud and collective effects in the FCC-ee Interaction Region
Requirements from the Vacuum Systems HE-LHC
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Study of the Heat Load in the LHC
Frank Zimmermann, Electron Cloud, LHC MAC 10. June 2005
Scrubbing progress - 10/12/2012
Summary first Scrubbing test 31/10/2010
CINVESTAV – Campus Mérida Electron Cloud Effects in the LHC
Scrubbing progress - 08/12/2012
Collective effects in the SPS and LHC (longitudinal plane)
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 ELECTRON CLOUDS AND VACUUM EFFECTS IN THE SPS Experimental Program for 2004 J.M. Jimenez Thanks to my colleagues of the Vacuum Group for their contributions and their help in the preparation of this presentation And more generally to the AB/ABP, AB/OP, AB/RF, AB/BDI, AT/MEL, AT/ECR and TS/MME Groups for their help. See also in Session C: A. Rossi, “SEY and EC build-up with NEG Materials” V. Baglin, “Results of LHC type cryogenic vacuum systems subjected to ECE”

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Introduction – SPS Running with LHC-type beams Experimental set-ups and Main Results –Experimental set-ups: Cold and Variable Aperture Strip Detectors –Main results at 25 ns bunch spacing –Preliminary results at 75 ns bunch spacing Experimental program for 2004 –Questions which shall be answered –New detectors Conclusions Main topics

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Introduction SPS Running with LHC-type beams

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Different behavior between DF and FF Beam conditioning and bunch dependence observed but results not easily understandable Experimental Set-ups Pressure readings give indications…

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 80 K K Collecting plate (strips) Cold head Collecting strips Beam “pipe” (< 30 K) Thermal shielding (80 K) Experimental Set-ups Cold Strip Detector (30 K) Length of cold section = 600 mm

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Motor Moving plate RF contacts As seen by the beam… Experimental Set-ups Variable Aperture Strip Detector From 35 to 80 mm in height

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Electron cloud build up and thresholds –There is a threshold in the bunch intensity below which no activity is observed: p/b in a dipole field (DF) / p/b in field free region (FF) –At p/b in field free regions Build-up starts after 20 bunches in the first batch, immediately in batch 2 to 4 “Surviving” electrons are observed between batches Dependence on filling pattern (above threshold) –Linear dependence of the collected electron current and heat load with bunch intensity and with number of batches (filling factor) –> 550 ns spacing required between batches to decouple the effect of two successive batches on the build up Dependence on bunch length (during ramping from 26 to 450 GeV) –Initial increase of the collected electron current when the bunch length decreases at the beginning of the ramp, followed by a decrease at the end of the ramp, when the bunch length is the shortest (preliminary) Main Results at 25 ns Bunch Spacing Build-up, Thresholds, Filling Pattern and Bunch Length

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 e - cloud signal LHC beam signal 550 ns spacing Surviving e - Main Results at 25 ns Bunch Spacing Build-up measured using a shielded pick-up

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Main Results at 25 ns Bunch Spacing Build-up measured using a strip detector In field free conditionsIn dipole field conditions 26 mm

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 LHC Beam Screen Main Results at 25 ns Bunch Spacing Spatial Distributions in DF

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Heat load efficiency = HLE e - HLE (DF)= 1.7 × e - HLE (FF) E e ->180 eV located in the centre  faster beam conditioning observed 180 eV Dipole field 80 eV Field free Dipole field Main Results at 25 ns Bunch Spacing Energy and Spatial Distributions in DF/FF

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 COLDEX LHC LSS without NEG Main Results at 25 ns Bunch Spacing Effect of vacuum chamber height in DF/FF BS V BS r

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Ramp to 55 GeV Ramp to 450 GeV Main Results at 25 ns Bunch Spacing Detrimental effect of the ramp in Energy

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Main Results at 25 ns Bunch Spacing Detrimental effect of the ramp in Energy Pressure Variations

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 At RT in both DF and FF –Thresholds increased with beam time In DF: 3.0 ×10 10 p/b  8.0×10 10 p/b In FF: 5.0 ×10 10 p/b  > 1.3×10 11 p/b –Position of the 2 lateral strips independent from beam conditioning (expected) –Beam conditioning in FF faster than in DF –Vacuum cleaning/scrubbing observed:  P decrease by ~100 in DF and FF at RT Secondary Electron Yield (  ) measurements at RT in FF –  decreased down to 1.5 in FF –“Venting” to air reset the  to its initial value (as in the Lab) –“Memory” effect on a conditioned surface (faster conditioning as in Lab) –  drift without LHC-type beams  less than 4 h to recover the initial value Main Results at 25 ns Bunch Spacing Beam conditioning / Vacuum Scrubbing at 30 K and RT

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Main Results at 25 ns Bunch Spacing Pressure decrease resulting from both vacuum scrubbing and Beam conditioning

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 0 h 140 h Main Results at 25 ns Bunch Spacing Evolution of the Spatial Distribution during the Beam Conditioning 30 K/DF

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 The reduction of electron current versus cumulated beam time is significantly slower at 30K than at room temperature, but initial values are close. RT (VASD detector)30 K (CSD detector) (Values normalized to a circular tube of ID 35 mm) Main Results at 25 ns Bunch Spacing Beam conditioning: Evolution of Collected Electron Current in a Field Free

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 The reduction of electron current versus cumulated beam time seems also lower at 30K than at room temperature, but there is much less difference. Again, initial values are quite close. RT (VASD detector)30 K (CSD detector) Main Results at 25 ns Bunch Spacing Beam conditioning: Evolution of Collected Electron Current in a Dipole Field

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 In the SPS, the electron cloud-induced pressure rises are observed in the dipole field regions, arcs of the SPS  e - build up also seen with 50 ns bunch spacing in 2001 (using pressure gauges)  No signal in Field Free at RT (LSS) but there were already well conditioned Comparison between 25 and 75 ns bunch spacing in dipole field regions: –Smaller pressure rises  factor 4 –Smaller electron flux to the walls  factor 20 measured in a 30 K  Multipacting is still present with 75ns bunch spacing but at a much lower level.  Strip separation is different between the 25 and 75 ns bunch spacing (?) Preliminary results at 75 ns bunch spacing Comparison with the 25 ns Bunch Spacing

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Experimental program for 2004 Questions which shall be answered  According to the known values of the available cryogenic cooling capacity, what will be the maximum luminosity (bunch intensity/filling factor) which can be achieved at 75 ns and 25 ns bunch spacing  Are e - induced heat loads the only 1 st order limitations ? What about emittance growth and e-p instabilities ?  Confirmation of the beam conditioning efficiency measured on the cold surfaces in field free and dipole field  What about edge effects (limited length) ?  Vacuum performances in different electron multipacting conditions  What about the collimators halo ?  What about the transfer lines ? (build up after 20 bunches only)  Electron cloud build up and Heat load in a quadrupole field  …How reliable are the extrapolations from the SPS to the LHC ?

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Experimental program for 2004 Experimental Area SPS BA5 Strip2002 Baffle CSD MBA Pick-ups RFD QSD RGA MBB Pick-ups VASD

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Experimental program for 2004 New Detectors Cold Baffles to protect the Cold Strip (1) CSDCold Screen HP518 (LSS5)

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Experimental program for 2004 New Detectors Cold Baffles to protect the Cold Strip (1) Beam screen with collecting holes Heater RFD Cold Screen Heater Cold Strip Detector Cold Head Cold Screen inside the Baffle Cold Screens with Heaters RF Shields

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Strips covering half diameters with a 2 mm spatial resolution Chamber ID 95 mm Experimental program for 2004 New Detectors Strip Detector in a Quadrupole

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Experimental program for 2004 New Detectors Strip Detector in a Quadrupole Beam Screen with the collecting holes Beam Screen with the collecting stripes lithographed Kapton foil 1 mm resolution Spacers for the lithographed Kapton foil

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 SPS should be able to inject the LHC after 5 days of beam conditioning with 3 or 4 batches at 1.1x10 11 p/bunch No signal in the field-free regions (long straight sections), the electron cloud activity decreased below < A/m In the arcs (dipole field), electron cloud still “visible” with 4 batches injected  Pressure rises decreased by a factor > 100  Similarly to RF and HV devices, beam conditioning efficiency limited to the parameters used during the scrubbing  will not be effective if running conditions become more favourable Ultimate SEY value  = 1.5 reached after 4 days in the FF regions in the SPS:  Shows the multipacting threshold under these conditions  Is in good agreement with analytical calculations Upward drift of the SEY (  ) observed if the SPS is not operated with LHC- type beams is not an issue  Measurements confirmed that SEY recovered its initial value after 4 hours of operation with LHC-type beams. Conclusions (1) SPS as the LHC Injector

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Conclusions (2) LHC and the Electron Cloud Vacuum scrubbing (P decrease with beam time) is observed at RT in both DF and FF Beam conditioning is observed at RT and at 30 K in both DF and FF –Initial electron activity comparable at room and cryogenic temperatures –Electron activity decreases faster at RT than at cryogenic temperatures in FF regions, the difference is marginal in DF –75 ns bunch spacing results in a significantly lower activity (<1/10), but it is still present –Beam conditioning is limited by available cooling power / EC induced Instabilities Detrimental effect of the ramp in energy  bunch length shortening and beam orbit displacement

Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Conclusions (3) LHC and the Electron Cloud To cope with the available cooling power:  Change the filling factor instead of reducing the bunch intensity since reducing the latter means displacing the strips in the chamber and changing the energy spectrum of the electrons  There still are questions: –Is the threshold the same as for SPS? –Influence of the reduced bunch length in LHC versus SPS? Preliminary estimation of the required beam conditioning time in LHC, pending to a better understanding of the behaviour of the cryogenic vacuum system.