Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.

Slides:



Advertisements
Similar presentations
1 TAC Report to the ERCOT Board March 21, TAC Summary 3 unanimous PRRs 3 unanimous PRRs TAC discussion regarding Board Retreat Action Items TAC.
Advertisements

Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 21, 2009.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
1 TAC Report to the ERCOT Board October 18, 2005.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 17, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors June 16, 2009.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
Protocol Revision Subcommittee Sandy Morris December 1, 2011.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 9, 2009.
1 TAC Report to the ERCOT Board February 21, 2006.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 12, 2006.
Impact Analysis and Feasibility Study Review – NPRR164, NPRR169 and SCR752 Troy Anderson ERCOT Program Management Office January 15, 2009.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 2, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2004.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 6, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors March 21, 2007.
ERCOT CSC – Vote “Yes” to 3b Jan A. Bagnall Sr. Director Transmission, Reliability & Compliance October 2008.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 16, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors September 16, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee September 4, 2003.
1 TAC Report to the ERCOT Board November 14, 2006.
Protocol Revision Subcommittee Tom Burke April 5, 2012.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 3, 2009.
Protocol Revision Subcommittee Tom Burke January 3, 2013.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 20, 2009.
December 3, 2013 Technical Advisory Committee (TAC) Update to RMS Kathy Scott December 18, 2013TAC Update to RMS 1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors November 17, 2008.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 5, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 05, 2008.
Protocol Revision Subcommittee
TAC Report to the ERCOT Board
TAC Report to the ERCOT Board
Technical Advisory Committee
Presentation transcript:

Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008

TAC Summary 2 PRRs for Approval 2 PRRs for Approval 5 NPRRs for Approval 5 NPRRs for Approval Approval of methodology document associated with PRR772, Description of MCPE Cap and Shadow Price Cap Methodology Approval of methodology document associated with PRR772, Description of MCPE Cap and Shadow Price Cap Methodology ERCOT Methodology for Determining Ancillary Service Requirements ERCOT Methodology for Determining Ancillary Service Requirements Discussion of “study horsepower” Discussion of “study horsepower” Appeal of 2009 selection of CSCs, zones, CREs, and boundary generators. Appeal of 2009 selection of CSCs, zones, CREs, and boundary generators.

PRR765– Time of Use Revisions Purpose (Direct Energy for Profiling WG) Revision to comply with PUC Subst. R (l), Advanced Metering, by removing requirement for PUC pre-approval before implementing a new time-of-use schedule. Benefit Conforms with PUC Rules Market Impact N/A System Change NoN/A AssumptionsN/A TAC Vote TAC recommended approval unanimously; all Market Segments were present Effective Date November 1, 2008

PRR765– Time of Use Revisions Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact

PRR769 – EECP Media Appeal Change Purpose (Operations Working Group) Removes the required energy conservation media appeal from EECP Step 2 and allows ERCOT to issue a media appeal for energy conservation at management’s discretion without CEO authorization. Benefit Allows ERCOT to use operational judgment in issuing energy conservation media appeal. Market Impact N/A System Change NoN/A AssumptionsN/A TAC Vote TAC unanimously recommended approval; all Market Segments were present Effective Date November 1, 2008

PRR769 – EECP Media Appeal Change Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact

NPRR102– Implementation of PUC Subst. R (f), Publication of Resource and Load Information Purpose (ERCOT for TPTF) Incorporates disclosure requirements from PUC Rules. Benefit Compliance with PUC Rules. Market Impact N/A System Change Yes Impacts EMS, MMS, COMS, EIS and MIS AssumptionsN/A TAC Vote TAC recommended approval unanimously; all Market Segments were present Effective Date Upon Texas Nodal implementation; no incremental impact to nodal schedule

NPRR102– Implementation of PUC Subst. R (f), Publication of Resource and Load Information Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact $1.5M-$2.0M 0.25 FTE impact to EIS Impacts to EMS, MMS, COMS, EIS and MIS 49 reports delivered at Go-Live, 24 post- Go-Live

NPRR113– Load Resource Type Indicator for Ancillary Service (AS) Trades and Self-Arranged AS Purpose(ERCOT) Adds indicator to self-arranged Ancillary Service (AS) and AS trades to show if Responsive Reserve services are being provided. Benefit Increases transparency of which RRS type is being provided. Market Impact N/A System Change Yes Impacts MMS, EMS, and EIS AssumptionsN/A TAC Vote TAC unanimously recommended approval; all Market Segments were present Effective Date Upon Texas Nodal implementation; no incremental impact to nodal schedule

NPRR113– Load Resource Type Indicator for Ancillary Service (AS) Trades and Self-Arranged AS Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact $500k-$1M Impacts to MMS, EMS, and EIS

NPRR124– Resource Node Updated Definitions Purpose(ERCOT) Clarifies definition of Resource Node and specifies the different Resource Node types that meet nodal requirements. Benefit Accommodates full range of intended capability in nodal market. Market Impact N/A System Change Yes Impacts MMS AssumptionsN/A TAC Vote TAC unanimously recommended approval; all Market Segments were present Effective Date Upon Texas Nodal implementation; no incremental impact to nodal schedule

NPRR124– Resource Node Updated Definitions Item Reviewed Description NoImpact Credit Monitoring/ Liability Budget Staffing Computer Systems Business Functions Grid Operations Impact Impacts to MMS $100k-$150k

NPRR129– Section 15, Synchronization of Zonal Protocols Purpose(ERCOT) Synchronizes Section 15, Customer Registration, in nodal protocols. Benefit Completes nodal protocols. Market Impact N/A System Change NoN/A AssumptionsN/A TAC Vote TAC recommended approval unanimously; all Market Segments were present Effective Date Upon Texas Nodal implementation; no incremental impact to nodal budget or schedule

NPRR144– Five RUC Deployments Needed Before Requiring Verifiable Costs Purpose (Verifiable Costs Working Group) Increases the time QSEs have to prepare verifiable cost submissions for units unlikely to be struck in RUC. Benefit Reduces ERCOT costs. Market Impact N/A System Change NoN/A AssumptionsN/A TAC Vote TAC recommended approval unanimously; all Market Segments were present Effective Date Upon Texas Nodal implementation; no incremental impact to nodal budget or schedule

MCPE Cap and Shadow Price Methodology PRR772, Description of MCPE Cap and Shadow Price Cap Methodology, approved by the BOD in September. PRR772, Description of MCPE Cap and Shadow Price Cap Methodology, approved by the BOD in September. Section 7.1 requires: Section 7.1 requires: Process for making adjustments to the methodology must be reflected in a separate market bulletin; Process for making adjustments to the methodology must be reflected in a separate market bulletin; Process must be approved by the BOD. Process must be approved by the BOD. TAC unanimously voted to endorse the document: “Process for Adjusting Market Clearing Prices of Energy and Shadow Prices in the ERCOT Zonal Market.” TAC unanimously voted to endorse the document: “Process for Adjusting Market Clearing Prices of Energy and Shadow Prices in the ERCOT Zonal Market.”

Ancillary Services Methodology ERCOT Staff presented its proposed Methodology for Determining Ancillary Service Requirements. ERCOT Staff presented its proposed Methodology for Determining Ancillary Service Requirements. Contains significantly different approach to procuring Regulation Reserve Service and Non-spin Reserve Service. Contains significantly different approach to procuring Regulation Reserve Service and Non-spin Reserve Service. Many TAC members concerned about insufficient study of the costs and incremental reliability benefits of the proposed changes. Many TAC members concerned about insufficient study of the costs and incremental reliability benefits of the proposed changes. TAC endorsed the proposed changes (22 in favor, 6 opposed (5 consumer and 1 REP) and one abstention (IPM)), with instructions: TAC endorsed the proposed changes (22 in favor, 6 opposed (5 consumer and 1 REP) and one abstention (IPM)), with instructions: ROS to examine opportunities to better optimize the incremental AS; ROS to examine opportunities to better optimize the incremental AS; WMS to explore alternative allocations of the costs of the incremental AS. WMS to explore alternative allocations of the costs of the incremental AS.

Discussion of Study Horsepower Stakeholders have expressed concern that certain decisions are made with insufficient background analysis. Stakeholders have expressed concern that certain decisions are made with insufficient background analysis. ERCOT Staff resource constraints. ERCOT Staff resource constraints. Stakeholder resources are also insufficient. Stakeholder resources are also insufficient. Recent Examples: Recent Examples: Study of LaaR capability for AS capacity: long delayed due to scarce stakeholder resources to update the dynamic model. Study of LaaR capability for AS capacity: long delayed due to scarce stakeholder resources to update the dynamic model. Ancillary Services Methodology: Changes based on GE Study without extensive analysis for application to ERCOT- specific facts. Ancillary Services Methodology: Changes based on GE Study without extensive analysis for application to ERCOT- specific facts. OGRR 208: Issue before the Board next month, in which the need for a study has also been raised. OGRR 208: Issue before the Board next month, in which the need for a study has also been raised.

Appeal of TAC action on 2009 Zones, CSCs, CREs, and Boundary Generators

Zones & CSCs: 30,000 ft. View Specification of Zones and CSCs determines: Specification of Zones and CSCs determines: Which congestion management tools ERCOT will use in particular instances of congestion—balancing energy vs. OOM instructions; and Which congestion management tools ERCOT will use in particular instances of congestion—balancing energy vs. OOM instructions; and Which congestion costs will be directly assigned and which costs will be uplifted. Which congestion costs will be directly assigned and which costs will be uplifted.

Review: Annual CSC & Zone Designation Process (Protocols §7.2) November 1: Recommended CSCs, zone designations, and resulting CREs due to the Board. November 1: Recommended CSCs, zone designations, and resulting CREs due to the Board. Steps in development of recommendations: Steps in development of recommendations: ERCOT Staff originates the set of CSC candidates based on: ERCOT Staff originates the set of CSC candidates based on: Steady State Working Group summer peak load flow data. Steady State Working Group summer peak load flow data. Prior year and projected congestion costs. Prior year and projected congestion costs. “ERCOT’s operational experience.” “ERCOT’s operational experience.” ERCOT Staff develops Shift Factors and performs cluster analyses for each candidate CSC. ERCOT Staff develops Shift Factors and performs cluster analyses for each candidate CSC. ERCOT Staff forwards candidate CSCs to the appropriate TAC subcommittee to develop a recommendation to the TAC and the Board of Directors (typically considered in October) ERCOT Staff forwards candidate CSCs to the appropriate TAC subcommittee to develop a recommendation to the TAC and the Board of Directors (typically considered in October) ERCOT Staff develops the list of CREs and boundary generators (typically for the November Board meeting). ERCOT Staff develops the list of CREs and boundary generators (typically for the November Board meeting).

CSC 4 – West to North Sweetwater; Abilene Mulberry Creek – Long Creek CSC 5 – North to West Long Creek – Sweetwater; Abilene Mulberry Creek CSC 3 – South to North Temple - Lake Creek & Temple Pecan - Creek Tradinghouse CSC 2 – North to South Lake Creek – Temple & Tradinghouse – Temple Pecan Creek CSC 1 – North to Houston Singleton - O’Brien 5 Singleton – T. H. Wharton Recommended 2009 CSCs and Zones

CSC Analysis – load moving zones Scenario 3b Scenario 3g Scenario 3h Scenario 3i North to South South to Houston West to North West to South North to West total

CSC Analysis – generation moving zones Scenario 3b Scenario 3g Scenario 3h Scenario 3i North to South 0000 South to Houston 0000 West to North West to South 0000 North to West 0000 total

Board Remand and TAC Reconsideration September 16 th meeting of the Board: September 16 th meeting of the Board: TAC presented recommendation on Option 3(i). TAC presented recommendation on Option 3(i). Remanded to TAC due to procedural concerns. Remanded to TAC due to procedural concerns. Directed TAC to return in November with a CSC recommendation and accompanying CREs. Directed TAC to return in November with a CSC recommendation and accompanying CREs. October 8 th —special joint meeting of WMS and TAC. October 8 th —special joint meeting of WMS and TAC. WMS approved a motion to eliminate option 3(b). WMS approved a motion to eliminate option 3(b). WMS approved a motion to adopt the zones, CSCs, CREs, and boundary generators associated with option 3(i). WMS approved a motion to adopt the zones, CSCs, CREs, and boundary generators associated with option 3(i). TAC failed to approve a motion to adopt the zones, CSCs, CREs, and boundary generators associated with option 3(h). TAC failed to approve a motion to adopt the zones, CSCs, CREs, and boundary generators associated with option 3(h). TAC approved a motion to adopt the zones, CSCs, CREs, and boundary generators associated with option 3(i). TAC approved a motion to adopt the zones, CSCs, CREs, and boundary generators associated with option 3(i).