PETRA III - Betrieb 2015 | July, 2015 | 1 PDE Magnet PETRA III. PETRA III Team DESY Meeting mit MEA 13.11.2015.

Slides:



Advertisements
Similar presentations
SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
Advertisements

Method of beam extraction from a synchrotron by the instrumentality of multilayer Cu-Fe shield Bondarenko Alexey.
Main Linac Simulation - Main Linac Alignment Tolerances - From single bunch effect ILC-MDIR Workshop Kiyoshi KUBO References: TESLA TDR ILC-TRC-2.
PXIE: SSR1 Section Focusing Lens 1.Requirements table 2.Developed at FNAL 3.Available from vendors 4.Used at ANL 5.Layout of the SSR1 cryomodule 6.Case.
XFEL Undulator Efforts at DESY and Thoughts on LCLS-II H.-D. Nuhn June 30, 2010.
K. Balewski (DESY)IWBS Conceptual Design of the PETRA III Orbit Feedback K. Balewski, H.T Duhme, J. Klute, I. Krouptchenkov, R. Neumann, G. K. Sahoo,
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
IPBI 6 April 05Ken Moffeit Polarimetry Design Updates - Dispersion in upstream chicane - 20mrad extraction line 0.75 mrad beam stay clear location of Synchrotron.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Status and new developments at ASTRID2 ESLS XXII, Grenoble 25-26/ Niels Hertel, ISA University of Aarhus, Denmark.
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Salzau M. Körfer, DESY 1 Layout and Functionality of Collimator System Purpose of the Collimator System Layout Sub-Systems Transversal/ Energy.
March A. Chancé, J. Payet DAPNIA/SACM / Beta-beam ECFA/BENE Workshop The Decay Ring -First Design- A. Chancé, J.Payet CEA/DSM/DAPNIA/SACM.
Alignment and Beam Stability
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
Author CERN – Geneva – CH Jacques.Dutour 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland 1 / 16 MQW magnets:
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
Y. Ohnishi / KEK KEKB LER for ILC Damping Ring Study Lattice simulation of lattice errors and optics corrections. November 1, 2007 Y. Ohnishi / KEK.
Low Emittance RF Gun Developments for PAL-XFEL
1 BROOKHAVEN SCIENCE ASSOCIATES Issues on Closed Orbit Feedback for NSLSII NSLS-II Stability Workshop April 18-20, 2007 Li-Hua Yu.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
1 Alternative Bunch Compressor 30 th Sep KNU Eun-San Kim.
An ultra-low emittance lattices for Iranian Light Source Facility storage ring Esmaeil Ahmadi On behalf of beam dynamics group Iranian Light Source Facility.
ESS | A Preliminary Feasibility Assessment of Power Converters and Magnets for Beam Raster System| | Carlos A. Martins, ESS Preliminary Feasibility.
ILC luminosity optimization in the presence of the detector solenoid and anti-DID Reine Versteegen PhD Student CEA Saclay, Irfu/SACM International Workshop.
Kiyoshi Kubo Electron beam in undulators of e+ source - Emittance and orbit angle with quad misalignment and corrections - Effect of beam pipe.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Shielding the 140 mm option F. Cerutti, L.S. Esposito on behalf of CERN FLUKA team.
PETRA III, A New High Brilliant Light Source At DESY
Magnet design issues and discussion David Harding for Vladimir Kashikhin 3 April 2005.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
PS2 Orbit Correction - Update Wolfgang Bartmann PS2 Meeting, 26 th March Mar-091PS2 Orbit Correction - Update.
SAMURAI magnet Hiromi SATO SAMURAI Team, RIKEN Requirements Geometry Magnetic field Superconducting coil and cooling system Present status of construction.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
PETRA III, Status and Upgrade
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
High Gradient Magnet Design for SPring-8 Upgrade Plan
A.Lachaize CNRS/IN2P3 IPN Orsay
IF Separator Design of RAON
PETRA III. Machine development Satellite bunch clearing
Proposal for a Transparent Off-Axis Injection Scheme for BESSY II
First Look at Nonlinear Dynamics in the Electron Collider Ring
SOLEIL Fast Orbit Feedback System
Commissioning the Fast Orbit Feedback System at SSRF
Compact and Low Consumption Magnet Design The DESY Experience
DEBRIS IMPACT IN THE TAS-TRIPLET-D1 REGION
Beam Injection and Extraction Scheme
Estimation and Protection on Synchrotron Radiation in CEPC Main Ring
SCU Next Phase Meeting July 8, 2014.
Strip-line Kicker R&D at KEK-ATF
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
2017 CAS Erice case study: Design of a beam dumping system for FCC
DESIGN OPTIONS FOR ORBIT CORRECTORS IN D2 and Q4
Upgrade phase 1: Energy deposition in the triplet
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Beam-Based Alignment Results
Field quality of LHC corrector magnets
Feedforward correction to injection bump error in the SPring-8
Linear beam dynamics simulations for XFEL beam distribution system
Feasibility of Reusing PEP-II Hardware for MEIC Electron Ring
Feasibility of Recuperation of Magnets in Decommissioned Storage Rings
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Upgrade on Compensation of Detector Solenoid effects
Arc FODO Cell Inventory
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

PETRA III - Betrieb 2015 | July, 2015 | 1 PDE Magnet PETRA III. PETRA III Team DESY Meeting mit MEA

PETRA III - Betrieb 2015 | July, 2015 | 2 PXN, 2 nd cell PU64, PU65

PETRA III - Betrieb 2015 | July, 2015 | 3 Problems with the fringe field of the PDE Dipole PU64PDE Dipole 20 mrad correction coils correction windings Fringe field of the dipole Gap PU mm  30 mm Orbit distortion: rms orbit 0.3 mm  1.7 mm Kick ~ 0.1 mrad or B*L = 2.2 T mm (Measurements: Sep 9, 2015 )

PETRA III - Betrieb 2015 | July, 2015 | 4 Field measurements in the tunnel Length of coil ~ 55 mmMeasurements of the magnetic field versus gap with Dipole on and off and the difference The magnetic field measurements agree with the measured orbit distortion if one extrapolates the results further into the undulator region. The coil is too short to cover the whole fringe field.

PETRA III - Betrieb 2015 | July, 2015 | 5 Correcting the orbit distortion with a feed forward Setting the PDE correction coil according to a Feed Forward table Feed Forward + Fast Orbit Feedback  Orbit distortion is very small But the spectral properties of the undulator radiation have been not yet measured ! Feed Forward  max. horz. Orbit distortion ~ 200  m BPM horizontal vertical

PETRA III - Betrieb 2015 | July, 2015 | 6 Improved magnet design A new coil configuration gives good results but requires a new support structure for the vacuum chamber. PDE Magnet in the equivalent position on the Extension East (no undulators yet) with absorber in the magnet gap. Fring field shielding New coil configuration

PETRA III - Betrieb 2015 | July, 2015 | 7 Fotos PDE NN

PETRA III - Betrieb 2015 | July, 2015 | 8 Dipoles Extension sections Einbaupositionen Magnete #004 = spare

PETRA III - Betrieb 2015 | July, 2015 | 9 PDD Spulenhalterung NN

PETRA III - Betrieb 2015 | July, 2015 | 10 PDE Magnet PDE #04

PETRA III - Betrieb 2015 | July, 2015 | 11 PDE #05

PETRA III - Betrieb 2015 | July, 2015 | 12 PDE #4 Randfeld PDE

PETRA III - Betrieb 2015 | July, 2015 | 13 NN

PETRA III - Betrieb 2015 | July, 2015 | 14 Thank you for your attention !