August 11, 2011 FNAL Meeting Global Design Effort 1 DR-CFS Discussion Mark Palmer GDE.

Slides:



Advertisements
Similar presentations
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Advertisements

Nov. 07 DR-KOM-CFS 1 Damping Rings KOM Conventional Facility & Siting Overview Tom Lackowski Acknowledgment: Atsushi Enomoto, Jean-Luc Baldy, John Osborne,
Damping Rings Discussion Session: Implications and Impact of the Central Injector Configuration and Other Layout Issues ILCDR07 Workshop.
Thermal Analysis of short bake out jacket version 1 12-Nov-2013.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Damping Rings Baseline Lattice Choice ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
DR km DTC Lattice 7 July 2011 D. Rubin. DTC01 layout 1.Circumference = m, 712m straights 2.~ 6 phase trombone cells 3.54 – 1.92m long wigglers.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York Jim Crittenden Cornell Laboratory for Accelerator-Based Sciences.
Heat load study of cryomodule in STF
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
October 27, DESY TBR Central Region Integration Issues 1 Mark Palmer Cornell University.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
September 12, 2011 Global Design Effort 1 ILC Damping Ring Activities Cornell Group Mark Palmer GDE.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
ILC Damping Ring Alternative Lattice Design ( Modified FODO ) ** Yi-Peng Sun *,1,2, Jie Gao 1, Zhi-Yu Guo 2 Wei-Shi Wan 3 1 Institute of High Energy Physics,
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
LARP Collaboration Meeting, April 19, 2007Super-Ferric Fast Cycling SPS – Henryk Piekarz1 LHC Accelerator Research Program bnl-fnal-lbnl-slac - Motivation.
10/02/2011 Global Design Effort 1 Positron Source meeting J. Clarke, D. Angal-Kalinin, N. Collomb.
Damping Rings Lattice Evaluation Mark Palmer Cornell University January 19, 2011.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
FCC-hh: First simulations of electron cloud build-up L. Mether, G. Iadarola, G. Rumolo FCC Design meeting.
Principals of fast injection and extraction R. Apsimon.
2011 Damping Rings Lattice Evaluation WebEx Meeting May 24, 2011 Mark Palmer Cornell University.
28/03/20101 ILC – Central Integration SB 2009 Layout Interpretation of available data into CAD 3D virtual model to serve as true scale graphical representation.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
E. Da Riva, S. E. Wojnarska PS Ventilation - Run mode results -
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
LAGUNA Primary Beam: Extraction and Transfer B.Goddard TE/ABT 23/01/2013 Reporting on behalf of many colleagues 400 GeV – Extraction from SPS – Upgrade.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
DR Interface to Sources and RTML
Specifications for Central Region Layout
Americas KlyCluster Cost Analysis Overview
FCC-ee MDI Civil Engineering update
Little module (HeatLoadCalculator) available at:
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
DR Magnets & Power Supply System ILC-ADI Meeting March 14, 2012
ILC CFS AD&I Daresbury Lab Summary
Extract from today’s talk given to DCB
PS2 Injection/Extraction Layout
ILC 3.2 km DR design based on FODO lattice (DMC3)
M. Biagini, S. Guiducci ECLOUD WG webex meeting December 15, 2009
ILC 3.2 km DR design based on FODO lattice (DMC3)
Lattice Session Summary
ILC - Global Design Effort
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Kicker and RF systems for Damping Rings
Electron Collider Ring Magnets Preliminary Summary
Transfer Line for EIC.
Presentation transcript:

August 11, 2011 FNAL Meeting Global Design Effort 1 DR-CFS Discussion Mark Palmer GDE

DR Layout (BTR version) August 11, 2011 FNAL Meeting Global Design Effort 2

Topics for Today Magnet System Heat Load Update Review of Tunnel Elements –Alcoves & Caverns –Cross Sections Miscellaneous Discussion and other Afternoon Discussion –Central Region Layout August 11, 2011 FNAL Meeting Global Design Effort 3

Heat Load Estimate Get away from % estimates of heat transferred to air vs water (depends on relative temperatures and affected surface areas). So attempt a better estimate as follows: 1.Convective heat transfer to air (non-forced): ~25W/m 2 /°C (high-end coeff. for non-forced case) where we need to consider the differential in temperature between the air and the avg magnet temperature 2.For non-cooled cables, treat full heat load as transferred to air Discuss on next 2 pages… August 11, 2011 FNAL Meeting Global Design Effort 4

Magnet Heat Loads Convective piece (ie, what fraction of magnet heat goes to air…) –Estimate 0.5m 2 of effective magnet surface area per ring per meter of length –Thus we can write: –So we have a ~25W/m convective contribution per ring for setting the air temp set point 2°C away from nominal water-based average temperature. –But don’t forget to include fixed piece… August 11, 2011 FNAL Meeting Global Design Effort 5

Contribution from Cables Rough estimate is that cable losses will likely be 5-10W/m per ring Note: all estimates based on arcs (region with highest conventional magnet load) Note: still need to do a full conceptual design update for the power supply system due to the significant changes in magnet strengths August 11, 2011 FNAL Meeting Global Design Effort 6

Overall Contribution Key assumptions: –Fixed water supply temperature everywhere in ring  this implies that the operating point in different regions of the ring will be slightly different –Convective estimate –Re-calculated cable loads based on new cable runs for the DTC lattice This suggests that we can hold the total heat load per ring to the W/m level as long as we have the control structure necessary to set the air temp in each section August 11, 2011 FNAL Meeting Global Design Effort 7

Comments? Would welcome any comments you might have on carrying out the updated analysis in this way… August 11, 2011 FNAL Meeting Global Design Effort 8

Alcoves and Caverns August 11, 2011 FNAL Meeting Global Design Effort 9

Alcove Locations RF cavern  OK 4 AORs  OK Alcoves to ELTR/PLTR  OK –Septa PSs can potentially go here –May need some straight ahead radiation protection from ELTR/PLTR lines Inj/Ext Straight PS alcoves need to be next to kickers between the ELTR and PLTR sections May need a bump-out at the end of the wiggler straight for a straight-ahead photon stop exiting through the first dipole. Need to discuss options for beam size monitor lines at some point August 11, 2011 FNAL Meeting Global Design Effort 10

Cross Sections Cornell designer (Joe Conway ) picking up Norbert’s designs Will allow considerably better cross-checking (and will look at a further reduction in beam line separation) with the new designs DTC01 – 2 arc cells August 11, 2011 FNAL Meeting Global Design Effort 11

Some Cross-Sections August 11, 2011 FNAL Meeting Global Design Effort 12

Miscellaneous Issues Ozone – primarily a wiggler region concern –Thermal jackets around VC – is there boil-off N 2 available to have a slow flow to prevent ozone build-up? Shaft size – Can we lower magnets already aligned on beams? August 11, 2011 FNAL Meeting Global Design Effort 13

Central Region Definitions Region A –Injection to and extraction from the DR e+ injection side –e+ injection septum 78.66m from centerline of DR »Angle1 =  x=0m »Angle2 = mrad  x=21.3m »End of  x=27.16m (  y=3.735m) –e- extraction septum 77.64m from centerline of DR »Angle1 =  x=0m »Angle2 = mrad  x=23.3m »End of  x=27.41 (  y=3.326m) August 11, 2011 FNAL Meeting Global Design Effort 14