Valery Telnov Budker INP, Novosibirsk IWLC2010, CERN October 21, 2010 A FEL pumped solid state laser system for the photon collider at CLIC.

Slides:



Advertisements
Similar presentations
11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Advertisements

ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
Accelerator Research at SLAC for Future HEP Programs Tor Raubenheimer SLUO Annual Meeting September 18, 2008.
Compton Linac for Polarized Positrons V. Yakimenko, I. Pogorelsky, M. Polyanskiy, M. Fedurin BNL CERN, October 15, 2009.
SAPPHiRE workshop, CERN 19 th Feb 2013 A SAPPHiRE Laser? Laura Corner Lasers for Accelerators group (L4A) John Adams Institute for Accelerator Science,
Laser Notcher Pulse Energy Requirements & Demonstration Experiment David Johnson, Todd Johnson, Vic Scarpine.
LCWS Tokyo 13 th Nov Fibre lasers for gamma-gamma colliders Laura Corner John Adams Institute for Accelerator Science, Oxford University, UK.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
Valery Telnov Budker INP, Novosibirsk LCWS 2012, Arlington, US, October 24, 2012 View on photon colliders at ILC, CLIC, Higgs factory SAPPHIRE and super.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Photon Collider at CLIC Valery Telnov Budker INP, Novosibirsk LCWS 2001, Granada, Spain, September 25-30,2011.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
Valery Telnov Budker INP, Novosibirsk LC-ECFA-2013, DESY, May 31 Photon collider: summary.
Summary of the Working Groups - Polarization -  Technical Aspects Conveners: Gudrid Moortgat-Pick,Louis Rinolfi, Sabine Riemann, Valery Telnov International.
Linac e+ source for ILC, CLIC, SuperB, … Vitaly Yakimenko, Igor Pogorelsky November 17, 2008 BNL.
Low Emittance RF Gun Developments for PAL-XFEL
Compton/Linac based Polarized Positrons Source V. Yakimenko BNL IWLC2010, Geneva, October 18-22, 2010.
Compton based Polarized Positrons Source for ILC V. Yakimenko Brookhaven National Laboratory September 12, 2006 RuPAC 2006, Novosibirsk.
11/18/2008 Global Design Effort 1 Summary for Gamma-Gamma Mayda M. Velasco Northwestern University November 20, 2008 LCWS08 -- UIC, Chicago.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
Valery Telnov Budker INP, Novosibirsk LCWS 2012, Arlington, US, October 24, 2012 Photon colliders: summary.
Design Considerations for a High-Efficiency High-Gain Free-Electron Laser for Power Beaming C. Muller and G. Travish UCLA Department of Physics & Astronomy,
After Posipol In my opinion we are still too much dispersed. We have to re compact our community if we want to succeed in presenting a Compton version.
Valery Telnov Budker INP, Novosibirsk LC-ECFA-2013, DESY, May 28 Photon collider Higgs Factories.
Laser cooling of electron beams Valery Telnov Budker INP, Novosibirsk Nanobeam-2008 BINP, May 26-29, 2008.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
Octoberfest! October 2014 Peter Tudor John Adams Institute for Accelerator Science Laser Wakefield Acceleration.
Progress at BNL Vitaly Yakimenko. Polarized Positrons Source (PPS for ILC) Conventional Non- Polarized Positrons: In our proposal polarized  -ray beam.
How CLIC-Zero can become less expensive A.Grudiev, D. Schulte 16/06/09.
Calibration of energies at the photon collider Valery Telnov Budker INP, Novosibirsk TILC09, Tsukuba April 18, 2009.
UCLA Claudio Pellegrini UCLA Department of Physics and Astronomy X-ray Free-electron Lasers Ultra-fast Dynamic Imaging of Matter II Ischia, Italy, 4/30-5/3/
Valery Telnov Budker INP, Novosibirsk LC-ECFA-2013, DESY, May 30 (talk at the LC directorate meeting) Photon collider at ILC (CLIC)
Conventional source developments (300Hz Linac scheme and the cost, Part-II) Junji Urakawa, KEK PosiPol-2012 at DESY Zeuthen Contents : 0. Short review.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
An H- stripping laser using commercial, diode-pumped Nd:YAG amplifiers Russell Wilcox Laser Stripping Workshop, April 11, 2011.
CLIC Drive beam BPM Requirements and cost estimate.
GDE FRANCE Why High brillance gun is good for the ERL scheme? And SC GUN? Alessandro Variola For the L.A.L. Orsay group.
X-band Based FEL proposal
Photon-Photon Colliders ( Photon-Photon Colliders (  C) Mayda M. Velasco.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
Valery Telnov Budker INP and Novosibirsk Univ. ICHEP-2014, Valencia, July 5, 2014 Prospects of high energy photon colliders.
Valery Telnov Budker INP, Novosibirsk INFN miniworkshop, Como, Italy, May 16, 2013 Gamma-gamma colliders: status and perspectives.
Compton based Polarized Positrons Source for ILC V. Yakimenko 1, D. Cline 2, Ya. Fukui 2, V. Litvinenko 1, I. Pogorelsky 1, S. Roychowdhury 3 1 BNL, 2.
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Status of the CLIC main beam injectors
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Brief Review of Microwave Dielectric Accelerators
Dr. D. Z. LI & Prof. J. GAO Accelerator Center, IHEP
Paul Scherrer Institut
Conveners: L.Serafini,F. Villa
Notkestrasse 85, Hamburg, Germany
Cost Comparison of Undulator and e-Driven Systems
Measurements, ideas, curiosities
BC2 Commissioning Parameters
XFEL Project (accelerator) Overview and recent developments
Free Electron Lasers (FEL’s)
Compton effect and ThomX What possible future?
Meson Production Efficiencies
ERL working modes Georg Hoffstaetter, Professor Cornell University / CLASSE / SRF group & ERL effort High Current mode High Coherence mode High Buch charge.
LCLS Commissioning Parameters
LCLS Commissioning Parameters
ERL accelerator review. Parameters for a Compton source
Status of the CLIC Injector studies
LCLS Commissioning Parameters
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

Valery Telnov Budker INP, Novosibirsk IWLC2010, CERN October 21, 2010 A FEL pumped solid state laser system for the photon collider at CLIC

October 21, 2010, IWLC10Valery Telnov 2 Requirements to a laser system for a photon collider at CLIC Laser wavelength ~ 1 μm Flash energy A~5 J Number of bunches in one train 354 Length of the train 177 ns=53 m Distance between bunches 0.5 nc Repetition rate 50 Hz The train is too short for the optical cavity, so one pass laser should be used. The average power of one laser is 90 kW (two lasers 180 kW).

October 21, 2010, IWLC10Valery Telnov 3 Possible approaches FELs based on CLIC drive beams. Drive beams: 8.4 nC, E=2.37 GeV, (19 J/ bunch) It is impossible to convert to photons 5/19=26% of the beam energy. In addition, the laser pulse should be several times shorter than the CLIC drive bunch. Solid state lasers pumped by diodes. Storage time of the laser medium is about 1 ms. Two laser trains contain the energy about 4 kJ, efficiency of diode pumping about 25%, therefore the total power of diodes should be P~4000/0.001/0.25~15 MW. The cost of 1 W is about 5$, so the cost of diodes for the laser system ~ 100 M$. Quite expensive, though reduction of the diode cost is possible in future. So, this technology is possible, LLNL works in this direction for laser fusion applications.

October 21, 2010, IWLC10Valery Telnov 4 Present suggestion: to use FELs instead of diode for pumping of the same solid state laser medium. As we have seen it is difficult for FEL to produce 5J laser pulse by one electron bunch. In addition, for production of one train there are only 177 ns. So, the peak electron beam power at 3% FEL efficiency should be 330 GW ! In the suggested scheme we have ~1 ms storage time of the solid medium, 5000 more time than in the case of the direct usage of FEL. The electron beam peak power is only 60 MW and the average power 60*0.001*50=3 MW.

October 21, 2010, IWLC10Valery Telnov 5 The FEL can have rather low electron energy, E~100 MeV is sufficient. This should be SC linac (with recuperation). All the rest is the same as in solid state lasers with diode pumping. It is not excluded that the FEL pumping gives less heat than diodes (because its wavelength can be adjusted to the laser medium). Moreover, the electron beam energy can be recuperated. Only 3% of energy is lost to photons and not recuperated. With recuperation and 10% wall plug RF efficiency the total power consumption of the electron accelerator from the plug will be about 1-2 MW only.

October 21, 2010, IWLC10Valery Telnov 6 Conclusion The FEL pumped solid state laser with recuperation of electron beam energy is very attractive approach for short train linear colliders, such as CLIC.