Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15.

Slides:



Advertisements
Similar presentations
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Overview History of the PDWG Three Steps to Renewable Water –Efficient Use –Sustainable Use –Reliable Use Conclusions.
Moving to the Next Level of Water Use Efficiency in Florida Janet G. Llewellyn, Director Division of Water Resource Management Florida Department of Environmental.
Water for Texas 2012 State Water Plan. Water Planning: Legislative Response to Drought  Late 1950s Drought of Record – 1957: Creation of TWDB – $200.
Eld Polk County Southeast Regional Wellfield. Polk County, Florida  Central Florida (Landlocked)  554 Lakes  Headwaters to Multiple Rivers (Low Volume)
Bureau of Reclamation Mid-Pacific Region Regional Criteria for Evaluating Water Management Plans for the Sacramento River Contractors.
Western placer county groundwater management plan model
North Texas Municipal Water District’s Proposed Lower Bois d’Arc Creek Reservoir Presented by: Jim Parks.
12” Segment “A” 12” 16” Rockin J (Rancho del Lago) HH RANCH PROPERTIES, L.C. Request for TWA Wholesale Water GLENBROOK PARTNERS, LTD. Request for TWA Wholesale.
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
WRWSA Water Supply Plan Update Progress Report – (April 1- May 15) >Project Tasks 1.Water Demand Estimates 2.Availability of Ground- and Surface Water.
Citrus County Planning Division Evaluation and Appraisal Report Citrus County Comprehensive Plan.
Recommendations.  Use Inventory to serve as a valuable tool to support local, regional and statewide decision makers on issues involving water-dependant.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
PRACTICE FROM CHINA GEF HAI BASIN INTEGRATED WATER AND ENVIRONMENT MANAGEMENT PROJECT World Bank / Liping Jiang In Cairns 23/10/2009.
Sole Source Contracts for Administrative Hearing Southeast Water Supply Augmentation Project Presented to: Orange County Board of County Commissioners.
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Water Supply Planning Initiative State Water Commission November 22, 2004.
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
Lake 7 Update HDR Engineering, Inc. TWCA Annual Convention March 3-5, 2010.
TWCA 2009 Mid-Year Conference Groundwater Regulation Panel.
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Energizing Utilities to Embrace Demand Energizing Utilities to Embrace Demand Management South Florida Water Management District Water Summit December.
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
WITHLACOCHEE MASTER REGIONALWATER SUPPLY PLANNING AND IMPLEMENTATION PROGRAM (PHASE VII): NORTHERN DISTRICT MODELING KICK OFF MEETING JUNE 14, 2007.
Growth In Texas Water Planning Texas Demographic Data Users Conference May 20 th, 2015 Kevin Kluge Texas Water Development Board.
Interdistrict Transfers of Water and Local Sources First Land Resources and Regulatory Committee November 3, 2005 Land Resources and Regulatory Committee.
Overview of the Current Threats and Water Protection Efforts in the Region Presented by Dr. Jon F. Bartholic, Director October 26-27, 2009 Pilot House,
FLOWS FOR THE FUTURE 2005 Environmental Flows Conference Texas State University – San Marcos November 1, 2005 Bob Brandes Region M Water Planning Study.
Board of County Commissioners Meeting July 14, 2009 PROPOSED LANDSCAPE IRRIGATION ORDINANCE.
Central Florida Coordination Area South Florida, St. Johns River and Southwest Florida Water Management Districts.
Equus Beds ASR Program A Case Study in Success Texas Innovative Water 2010 Seminar October 11, 2010 Texas Innovative Water 2010 Seminar October 11, 2010.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
Seacoast Utility Authority Water Use Permit Steven Memberg, Section Leader Water Use Regulation Division, Water Supply Department January 26, 2009.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
Alabama Water Resources Conference Perdido Beach, Alabama Mac Underwood, General Manager BWWB BIRMINGHAM WATER WORKS BOARD Sustainability of Water Supply.
Withlacoochee Regional Water Supply Authority Final Water Supply Plan Update July 2014.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
Santa Rosa Plain Groundwater Management Situation Assessment Jay Jasperse, Sonoma County Water Agency Gina Bartlett, Center for Collaborative Policy January.
Water Supply Orange County Presented by Kirby B. Green Executive Director St. Johns River Water Management District January 27, 2009.
Board of County Commissioners October 14, 2008 Vinzant Landing Swallet Santa Fe River.
Metropolitan Council Regional Groundwater Flow Modeling Twin Cities Metropolitan Area Water Supply: March 11, 2008 Lanya Ross Senior Environmental Scientist.
1 Water Cooperative of Central Florida Utilities Department Orange County Board of County Commissioners July 26, 2011.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #4 June 18 – July 15.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #5 July 15 – September 15.
St. Johns River Water Management District Surplus Property Proposal Discussion Agenda December 18, 2012 Board of County Commissioners.
REGION H Water Planning Group Freese and Nichols, Inc. | LBG-Guyton Associates | Ekistics Corporation DEVELOPING THE REGION H 2016 REGIONAL WATER PLAN.
Sinkholes in Hernando County, Florida Photos taken by Tom Scott, Florida Geographic Survey
Solid Waste Disposal Discussion Solid Waste and Resource Recovery Sally Palmi.
San Mateo County’s San Mateo Plain Groundwater Assessment Study
Topic 7: Is there enough water?
SOUTHEAST FLORIDA UTILITY COUNCIL
Department of Environmental Quality
Water Supply Planning in the St
Department of Environmental Quality
Department of Environmental Quality
Department of Environmental Quality
Drought Rate Study Continued from May 19, 2015
Department of Environmental Quality Division of Water Resources
AIF Florida Water Forum
Withlacoochee Regional Water Supply Authority
Consensus Forecast and Water Resource Comparison
Resource Management and Climate Protection Committee Meeting:
August 30, 2019 Robert Beltran, PE , BCEE
Presentation transcript:

Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15

Presentation Topics  Determining the Availability of Groundwater for Water Supply through 2035.

Public Supply Demand Projections ( ) County 2010 Water Use (mgd) Increase in Demand from (mgd) Citrus Hernando Marion Sumter TOTALS

Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Locations of MFL Springs

Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Locations of MFL Springs and Lakes

Presentation Topics  Reassess proposed well field locations from the 2010 Water Supply Plan ─Determine which public water supply systems will have deficits in 2035 ─Meet with county and city utilities ─Revise potential well field locations ─Determine potential well field production

Hernando County – 2035 Water Supply Deficit

Citrus County – 2035 Water Supply Deficit

Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

Sumter County – 2035 Water Supply Deficit

Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

Marion County Water Supply Deficit (SWFWMD Portion)

Marion County – 2035 Water Supply Deficit (SJRWMD Portion)

Evaluation of Potential Wellfields Evaluation of Potential Wellfield Locations Wellfields Proposed for the 2010 Water Supply Plan

Determining the Availability of Groundwater for Water Supply through 2035  Once wellfield locations have been determined, groundwater availability will be determined through the use of the SWFWMD’s Northern District Model. –The production of the wellfields will be input into the model to determine how water resources such as wetlands, lakes, springs, and rivers in the vicinity of the wellfields will be impacted