CEC SoCal Electricity Reliability Workshop Environmental Agency Considerations Lisa Beckham, Environmental Engineer, U.S. EPA – Region 9 August 17, 2015.

Slides:



Advertisements
Similar presentations
August 28, 2009 Federal Emergency Management Agency Public Assistance Arbitration Process.
Advertisements

Heather Ceron Air Permits Section Chief Region 4 EPA.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
Emissions Reductions Beyond the Clean Smokestacks Act (CSA) Emissions Reductions Beyond the Clean Smokestacks Act (CSA) Environmental Management Commission.
Environmental Compliance Negotiating our way through the process…
ADEQ Regulatory Process
Petition to EPA to Object to (Veto) a State Permit Joy Wiecks Fond du Lac Band of Lake Superior Chippewa Joy Wiecks Fond du Lac Band of Lake Superior Chippewa.
1 Katy R. Forney Energy Sector Technical Authority Air Permits Section EPA Region 4 PSD and Title V Greenhouse Gas Tailoring Rule 14 th Annual Power Generation.
State Implementation of Risk-Based MACT Exemptions Region 4 Permit Managers Meeting Rhonda B. Thompson, P.E., Director Engineering Services Division SC.
New Source Review Reform Vera S. Kornylak, Associate Regional Counsel EPA Region 4 Office of Regional Counsel and Gregg Worley, Chief, Air Permits Section,
Air Quality Beyond Ozone and PM2.5 Sheila Holman North Carolina Division of Air Quality 6 th Annual Unifour Air Quality Conference June 15, 2012.
Working with State and Federal Regulatory and Land Management Agencies Trent Wickman USDA Forest Service Eastern Region, Lakes States.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
ACC Open Meeting – November 18, 2010 Four Corners Power Plant 1.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
Title V Program Evaluations 1 st Round Overview Gregg Worley Section Chief Air Permits Section EPA Region IV.
Since May 2013 Select Clean Air Act Cases. U.S. v. Homer City U.S. v. Midwest Generation, LLC U.S. v. United States Steel CAA Enforcement Cases.
AWMA – Georgia Chapter Air Permitting Update April 16, 2013 Eric Cornwell Stationary Source Permitting Program.
10/1/ Air Quality Permitting Air Quality Committee William D. Willets, P.E. Engineering Supervisor DAQ Permitting Section May 7, 2014.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
EPA’s ADMINISTRATIVE ADJUDICATION SYSTEM Environmental Appeals Board U.S. Environmental Protection Agency Kathie A. Stein, Judge.
Air Quality Policy Division D P A Q PM 2.5 Final NSR Implementation Rule Nat’l Tribal Air Assoc. July 16, 2008.
EPA’s Proposed Clean Power Plan U.S. Environmental Protection Agency.
August 28, 2009 Federal Emergency Management Agency Public Assistance Arbitration Process.
Navajo Nation Operating Permit Program
1 Workshop on the Directive 96/61/EC concerning (IPPC) Integrated pollution prevention and control INFRA Public participation & access to environmental.
Kimberton, PA | Kennesaw, GA | Strategic Air Planning: Is the Time for a PAL Here? Mark Wenclawiak, CCM|
Policy Research Shop Support for the Policy Research Shop is provided by the Fund for the Improvement of Postsecondary Education, U.S. Department of Education.
Distinguishing: Clean Air Act, EPA Rules, Regulations and Guidance David Cole U.S. EPA, OAQPS Research Triangle Park, NC.
Overview of Civil Judicial Enforcement. Civil Judicial Enforcement  Who may file civil judicial environmental enforcement actions in U.S.? Federal Government.
Welcome Revisions of Chapter WAC Sections -035 and -036 Rule advisory committee workshop #5 Lacey, WA October 28, 2009.
Environmental Justice & Air Permitting Training - August 15, 2012 EPA Region IV – Atlanta, Georgia.
GHG BACT Analysis Case Study Russell City Energy Center May 2010 Donald Neal Vice President, EHS.
1 Public Involvement, Access, and Petitions DJ Law EPA Region 8.
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Lynne Welsh Massachusetts Department of Environmental Protection.
Jessica Montanez Environmental Protection Agency NEW SOURCE REVIEW (NSR) PROGRAM.
1 CDBG and Environmental Review For Local Officials.
Administrative Law The Enactment of Rules and Regulations.
Presented to: By: Date: Federal Aviation Administration Environmental Document Preparation WETLANDS BEST PRACTICES 33 rd Annual Airports Conference Marie.
Joelle Burleson Planning Section, Rules Development Branch Division of Air Quality Periodic Review and Expiration of Existing Rules per Regulatory Reform.
PM 2.5 Stakeholder Working Group Meeting #1 South Coast Air Quality Management District June 8, 2006.
1 Consideration of Final Rulemaking Clean Air Interstate Rule Environmental Quality Board Meeting Harrisburg, PA December 18, 2007 Joyce E. Epps Director,
NSR and Title V Activities WESTAR Business Meeting May 2005.
Title V Review DJ Law US EPA Region 8.
2005 NSR Regulation Changes Dwight Wylie. Old Units vs. New Units  There is a broad disparity between air pollution control requirements and emissions.
Class I Air Quality Related Values Kevin J. Finto Hunton & Williams APPA Energy and Air Quality Task Force Washington, D.C. March 10, 2005.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Navajo Nation Air Quality Control Program Operating Permit Program Navajo Nation Environmental Protection Agency Route 112 North/Bldg Fort Defiance,
ANPR Tutorial U.S. Chamber of Commerce October 30, EPA Regulation of CO 2 William L. Kovacs, Vice President Environment, Technology & Regulatory.
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
Clean Air Act Section 111 WESTAR Meeting Presented by Lisa Conner U.S. Environmental Protection Agency Office of Air and Radiation November 6, 2013.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
Proposed Carbon Pollution Standard For New Power Plants Presented by Kevin Culligan Office of Air Quality Planning And Standards Office of Air and Radiation.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
OAQPS Update WESTAR April 3,  On March 12, 2008, EPA significantly strengthened the National Ambient Air Quality Standards (NAAQS) for ground-level.
Blue Skies Delaware; Clean Air for Life Synthetic Minor Permitting Process Steve Mann.
Perspective on Contingency Mitigation Options Presented by John Annicchiarico, Senior Engineer August 17, 2015.
1 Update on New Source Review (NSR) Activities and Priorities for Information Transfer and Program Integration Division April 7, 2004.
CDAWG 2010 Laughlin, NV November 17, Overview  What are non-traditional ERCs?  Regulatory requirements for non-traditional ERCs  Source specific.
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
WESTAR Increment Recommendations
Module 19a: Water Quality Certification
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
NACAA Permitting Workshop, Chicago June 14, 2011
Overview of New Source Review (NSR)
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Presentation transcript:

CEC SoCal Electricity Reliability Workshop Environmental Agency Considerations Lisa Beckham, Environmental Engineer, U.S. EPA – Region 9 August 17, 2015

Overview EPA’s Role in the Air Permitting Process EPA’s Role in Options 1, 2, and 3 Recommendations and Considerations Contact Info

Why would you also need a permit from the EPA? The local air agency does not have a “SIP-approved” PSD program Triggered the PSD program o New facilities: 100 tpy for NGCC, 250 tpy for simple cycle o Existing major facilities: 40 tpy NOx, 15 tpy PM 10, 10 tpy PM 2.5, etc. Federal PSD program applies when no local program is in place (San Diego and South Coast) – called a “FIP” o Additional requirements compared to SIP-approved programs o Delegated Programs – federal PSD program applies, but implementation delegated to local air agency (South Coast) EPA’s Role in the Air Permitting Process

What are Some of the Additional Requirements for EPA-Issued PSD Permits ? Federal administrative procedures (“Part 124”) o Includes administrative appeals process (EAB), stays construction until complete Federal judicial appeals process (construction can proceed at o/o risk) o Can take “years” to get a decision Prior to permit issuance must complete other requirements for federal actions, including: o Endangered Species Act (Section 7 Consultation) o National Historic Preservation Act (Section 106 Consultation) o Environmental Justice o See EPA PSD Permit Processing Guidance: EPA’s Role in the Air Permitting Process

How long does it take to get a final PSD permit from EPA? Four Corners Power Plant 60 day comment period, 3 public hearings, significant number of oral and written comments received Applicant held pre-application teleconferences for all government parties involved (EPA, Navajo Nation, etc.) – provided specifics and requested feedback Pio Pico Energy Center Had a PPA prior to final permit, currently under construction, no extension required Palmdale Hybrid Power Project No PPA, requested permit extension, project has changed significantly, expecting new application soon EPA’s Role in Options 1, 2, and 3 Recent Region 9 ProjectsTimelineEAB Process Four Corners Power Plant, Navajo Nation14 monthsNo EAB Appeal Pio Pico Energy Center34 monthsEAB Appeal, Permit Remanded Palmdale Hybrid Power Project42 monthsEAB Appeal, Permit Upheld

What should you consider when planning for EPA involvement in the permitting/licensing process? Ideally, EPA would only have an oversight role and/or a project would not trigger the PSD program Delegating the FIP allows EPA to switch to oversight, but still requires the other federal requirements to be met by the local agency All PSD permits are statutorily required to be issued within one year of a complete application (Also applies to SIP-approved programs) Permits issued under the FIP have 18 months to commence construction, which may be extended. Typically, extensions are 18 months or less o Response to extension request is challengeable in federal court o Extensions are most easily justified when there is clear evidence the permitted equipment can commence construction soon EPA’s Role in Options 1, 2, and 3 Are permit extensions an option?

Should your EPA PSD permit “sit on the shelf?” Clean Air Act and implementing regulations designed for projects ready to construct – hence the one year deadline EPA decisions to extend the construction deadline are made on a case-by-case basis Challenges to a permit extension may take longer to resolve in court than the length of the extension After a period of time determinations become “stale,” changes to the project are expected, etc. Eventually requires substantive reanalysis and process must start over (although there would be significant overlap) Don’t require one from the EPA in the first place (We are happy to work with San Diego and South Coast on SIP-approved programs) Early, upfront, and ongoing engagement Recommendations and Considerations How do you reduce the time to get a final permit from the EPA?

Contact Info EPA Region 9 PSD Permits: Lisa Beckham Phone: (415) The Clean Power Plan is here! Ray Saracino, EPA Region 9 Phone: (415)