Doc.: IEEE 802.11-07/0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 1 TGu Agenda Notice: This document has been prepared to assist IEEE.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /2032r0 Submission July 2007 Stephen McCann, Nokia Siemens NetworksSlide 1 IEEE 802 ES Ad Hoc Notice: This document has been prepared.
Advertisements

Doc.: IEEE /0930r0 Submission July 2006 Nancy Cam-Winget, Cisco Slide 1 Editor Updates since Jacksonville Notice: This document has been prepared.
Doc.: IEEE /0296r4 Submission March 2007 Stephen McCann, Siemens Roke ManorSlide 1 TGu Agenda Notice: This document has been prepared to assist.
TGu Timeline Date: Authors: March 2006 March 2006
Coexistence Motions for LB84 Comment Resolution
TGu Agenda Date: Authors: May 2007 May 2007
TGu Agenda Date: Authors: May 2007 May 2007
[ Interim Meetings 2006] Date: Authors: July 2005
TGu Motions Date: Authors: March 2007 March 2007
TGu Agenda Date: Authors: July 2007 July 2007
TGu Closing Report Date: Authors: November 2005
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
3GPP liaison report May 2006 May 2006 Date: Authors:
TGu Agenda Date: Authors: May 2007 May 2007
3GPP liaison report July 2006
TGu Closing Report Date: Authors: May 2006 May 2006
TGu June 2007 Ad Hoc Agenda Date: Authors: July 2007
TGu July 2007 Ad Hoc Agenda Date: Authors: July 2007
TGp Closing Report Date: Authors: March 2006 Month Year
Emergency Call Motion Date: Authors: January 2006
TGu Agenda Date: Authors: July 2007 July 2007
TGu Motions Date: Authors: September 2006 September 2006
TGu Timeline Date: Authors: March 2006 March 2006
WNG SC Closing Report Date: Authors: November 2005
TGu Closing Report Date: Authors: July 2006 July 2006
TGp Closing Report Date: Authors: March 2006 Month Year
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2007 May 2007
TGu Closing Report Date: Authors: September 2005
TGu Closing Report Date: Authors: March 2006 March 2006
TGu Timeline Date: Authors: July 2005 July 2005
TGu Closing Report Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
TGu-changes-from-d0-01-to-d0-02
TGu Timeline Date: Authors: May 2006 May 2006
TGu Motions Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: May 2006 May 2006
WNG Closing Report Date: Authors: January 2007 January 2007
TGu Agenda Date: Authors: March 2007 March 2007
IEEE TGz Taipei Agenda Date: Authors: July 2007
IEEE TGz September Agenda
TGu Agenda Date: Authors: July 2007 July 2007
[ Policies and Procedure Summary]
3GPP2 Liaison Report Date: Authors: May 2006 May 2006
TGu Closing Report Date: Authors: March 2007 March 2007
May 2005 CAPWAP AHC Closing Report
TGu Motions Date: Authors: May 2006 May 2006
TGu Motions Date: Authors: May 2007 May 2007
TGu Closing Report Date: Authors: January 2006 January 2006
TGu liaisons Date: Authors: March 2006 March 2006
IEEE r: Fast BSS Transition TG Agenda
TGu Closing Report Date: Authors: May 2007 May 2007
TGu Timeline Date: Authors: May 2006 May 2006
TGu-changes-from-d0-04-to-d0-05
TGu Closing Report Date: Authors: March 2005 March 2005
TGu Agenda Date: Authors: January 2007 January 2007
IEEE TGz Taipei Agenda Date: Authors: July 2007
TGu Closing Report Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: July 2006 July 2006
TGu Closing Report Date: Authors: November 2006
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
WNG SC Closing Report Date: Authors: November 2005
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
TGu Motions Date: Authors: September 2006 September 2006
TGu Timeline Date: Authors: July 2005 July 2005
TGu Closing Report Date: Authors: January 2005 January 2005
Presentation transcript:

doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 1 TGu Agenda Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. ieee802.org/guides/bylaws/sb-bylaws.pdf Date: Authors:

doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 2 Abstract Agenda for TGu Interworking with External Networks for May 2007, Montreal, Canada.

doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 3 Call Meeting to Order Policies and Procedures: **IEEE Patent Policy Are there any patent claim(s)/patent application claim(s) and/or the holder of patent claim(s)/patent application claim(s) that the participant believes may be essential for the use of that standard? Minute any responses that were given, specifically the patent claim(s)/patent application claim(s) and/or the holder of the patent claim(s)/patent application claim(s) that were identified (if any) and by whom. ***Affiliation FAQ - Anti-Trust FAQ - Ethics - IEEE Policies and Procedures - and-proceedures.htm and-proceedures.htm IEEE 802 Policies and Procedures - procedures.pdfhttp:// procedures.pdf ** Read slide deck *** Note especially items #7 & #11 Monday 14 May 2007, 19:30 – 21:30

doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 4 Attendance/Documents Attendance – –Must register before logging attendance –Must log attendance during each 2 hour session Documentation – –New Templates this time for new patent slides etc. Timelines –Update required by Wednesday evening

doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 5 Monday (cont’) 14 May 2007, 19:30 – 21:30 Approve Agenda – r2 (this document) Approval of March 2007 (Orlando) Minutes – u-tgu-march-2007-meeting-minutes-orlando-fl- usa.doc Approval of April 2007 Ad Hoc (Singapore) Minutes – u-tgu-april-2007-adhoc-meeting-minutes- singapore.doc Approval of May 2007 Teleconference Minutes – u-teleconference-minutes-2-may-2007.doc

doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 6 Monday (cont’) 14 May 2007, 19:30 – 21:30 Summary of the March 2007 (Orlando) Meeting – u-closing-report Status of the Draft (Canpolat/McCann) – Draft D0.04 Approved updates from the March 2007 meeting –Approval of Draft D0.05 Recommended updates from the April Ad Hoc meeting Internal Draft Comment Resolution – u-internal-comment-review-summary – u-additional-internal-comments

doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 7 Tuesday 15 May 2007, 13:30 – 18:00 Presentations –MIH primitives (Canpolat, Centonza, Cheng and Stephenson) – r1 Network Selection type (Gast/Canpolat) – r0 QoS Map Additions (Zhang) – r0 Explanatory text for the draft (All) –Hotspot selection (Blanchard) – r3 : GAS MIB (Centonza) –Secure Mobile Architecture (Richard Paine) [4-6] –GAS response retry count (Centonza) –Emergency Services Authentication Type (Gast/Sreemanthula)

doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 8 Wednesday I 16 May 2007, 08:00 – 10:00 Joint Meeting with IEEE –MLME primitives for MIH –State 1/state 3 bit –Status of information model

doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 9 Thursday I 17 May 2007, 10:30 – 12:30 D0.06 must be on the server between 10:30 – 12:00 External review discussion Liaisons –Cellular operators (Bumiller) –NENA (McCann, Stephenson,Patel) –IETF EAP for Emergency Calls (Gast) – u-emergency-services-eap-requirements (Gast) –3GPP SA2 teleconference on May (McCann)

doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 10 Thursday II 17 May 2007, 16:00 – 18:00 Letter Ballot –Motion to approve D0.06 –Motion to go to letter ballot Outstanding Motions Timeline document review – u-timeline.ppt – Teleconferences/Ad Hocs (see next slide) Preparation for July 2007 Plenary Meeting AOB

doc.: IEEE /0593r2 Submission May 2007 Stephen McCann, NSN Roke ManorSlide 11 Potential Ad Hoc/Teleconferences Ad Hoc –Possible Ad Hoc in June/July ? Teleconferences –May 23 rd 2007 : 10:00 ET Liaison with 3GPP SA2 –June 26 th 2007 : 10:00 ET