Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.

Slides:



Advertisements
Similar presentations
1 Initial Commissioning of BEPCII Storage Ring J.Q. Wang 10 May, Initial Commissioning of BEPCII Storage Ring J.Q. Wang 10 May, IMAC2007.
Advertisements

1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.
Design and Performance Expectation of ALPHA accelerator S.Y. Lee, IU 2/26/ Introduction 2. Possible CIS re-build and parameters 3. Issues in the.
Monochromatization for Higgs production A.Faus-Golfe IFIC - LAL March1FCC Week 2015.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
CESR Beam-Beam Effects at CESR Mark A. Palmer Cornell University July 14, 2001.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Issues.
Commissioning Plan of BEPCII Storage Rings J.Q. Wang April 26, 2006.
BEPCII Transverse Feedback System Yue Junhui IHEP , Beijing Sep 17 th, 08IMAC.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
ERHIC Conceptual Design V.Ptitsyn, J.Beebe-Wang, I.Ben-Zvi, A.Fedotov, W.Fischer, Y.Hao, V.N. Litvinenko, C.Montag, E.Pozdeyev, T.Roser, D.Trbojevic.
ERHIC with Self-Polarizing Electron Ring V.Ptitsyn, J.Kewisch, B.Parker, S.Peggs, D.Trbojevic, BNL, USA D.E.Berkaev, I.A.Koop, A.V.Otboev, Yu.M.Shatunov,
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Polarization in ELIC Yaroslav Derbenev Center for Advanced Study of Accelerators Jefferson Laboratory EIC Collaboiration Meeting, January 10-12, 2010 Stony.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Overview of Collective Effects in MEIC Rui Li MEIC Collaboration Meeting Oct. 6-8, 2015.
09-21 Study of bunch length limits Goals: To identify and observe effects which put limits on the minimum bunch length in RHIC. Try to distiguish the limitation.
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Polarized Proton at RHIC: Status and Future Plan Mei Bai Collider Accelerator Dept. BNL A Special Beam Physics Symposium in Honor of Yaroslav Derbenev's.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Problems of charge compensation in a ring e+e- higgs factory Valery Telnov Budker INP, Novosibirsk 5 rd TLEP3 workshop, FNAL, July 25, 2013.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Off-axis injection lattice design studies of HEPS storage ring
Bocheng Jiang SSRF AP group
Failure analysis at BEPCII
Beam-beam effects in eRHIC and MeRHIC
First Look at Nonlinear Dynamics in the Electron Collider Ring
Luminosity Optimization for FCC-ee: recent results
Electron collider ring Chromaticity Compensation and dynamic aperture
Beam-beam R&D for eRHIC Linac-Ring Option
Status of CEPC lattice design
eRHIC with Self-Polarizing Electron Ring
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
The design of interaction region
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
BEPCII Background Issues: Collimators and Masks
Commissioning Issues of BEPCII
Lattice design for CEPC
Proposal for a CESR Damping Ring Test Facility
Sawtooth effect in CEPC PDR/APDR
Injection design of CEPC
HE-JLEIC: Boosting Luminosity at High Energy
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
JLEIC electron ring with damping wigglers
Presentation transcript:

Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group

Outline Backup scheme for colliding mode and synchrotron radiation mode Injection Ramping for SR mode Analysis of bepcii optics and correction(by Y. Y. Wei) Impedence and Bunch length(later on by D. M. Zhou) First Collision of BEPCII(by C. H. Yu) Instability, lifetime and luminosity summary

Backup scheme for colliding mode Due to time delay of the superconducting system, the backup scheme must consider the colliding mode in missing the superconducting quadrupoles. A new scheme including to colliding mode were proposed. Feature: two BEPC 160Q quadrupoles are used for replacing two superconducting coils. Due to the geometry and strength of the quadrupoles, β * y cannot be small like the formal mode, as a colliding study, we take the β * y =5cm

Main parameters for backup colliding mode E=1.89GeV β * x =2m, β * y =0.05m ν * x =6.54, ν * y =5.59m α p =0.022, ε x0 =120nm Bunch bucket height 0.7% U 0 =0.12MeV

“New” backup scheme for synchrotron radiation mode Feauture: two superconducting dipole coils are replaced by one PEPII H-type magnet at IP, this is different from the “old” backup scheme using two BEPC bending magnets with new coils Main parameters are similar to the formal scheme

Main parameters for backup SR mode E=2.5GeV β xmax =25m, β ymax =25m, D xmax =1.95m ν * x =7.28, ν * y =5.18m α p =0.0177, ε x0 =140nm U 0 =0.337MeV

Injection Hardware problems in the beginning: wrong link for magnets, the wrong polarity of magnets(quadrupoles and even dipole), short circuit for magnets(sextupoles in ring and bending magnet in transport line), profile monitors and vacuum valves blocking First turn BPMs play the decisive role for first injection

Injection A good injection mode should be a complete set of optics mode, COD, KICKERs’ strength, timing about KICKERS, RF and LINAC gun, and injected beam quality(beam intensity, energy, energy spread, orbit, emittance). Any one in the set could lead to the difficulty or the lower rate of injection. For convenience to compear, the best way is to record all the parameters for the good rate.

Special attentions on injection Phase advance between two kickers must be considered in optics correction, non-Pi section will lead the inevitable remnant oscillation. The related study have been done, but there are conflict from different LIBERA-BPMs, this most like LIBERA- BPM problem

Special attentions on injection Uniformity of multi-bunch injection is not so easy, the negative effect could be from wave form of kicker or multi-bunch instability. Optimizing the kickers’ strength and timing even phase advance could helpful, and BCM even the feedback system also can be helpful, still need further studies.

Special attentions on injection Injection with collision is difficult when the bunch current of “1st” beam is more than 5mA, sometime the existing “1ST” beam can be squeezed out. Reducing the remnant oscillation or offset of collision could be helpful. Another way is completely separating the two beams on longitudinally. The related study need to do.

Ramping for SR mode E: 1.89GeV->2.5GeV Synchronization for power supplies is one of the most important aspect. After a great of efforts by control group the ramping synchronization has been improved. Working point is also important to avoid beam losing due to high order resonance during the ramping The hysteresis of the magnets can also lead the losing. This has been fixed with a series energy steps (2.0, 2.1, 2.2, 2.3, 2.4, 2.5GeV). The best way is table-ramping. We will do this experiment.

Instability, lifetime and luminosity Current limit for single bunch >40mA Multi-bunch instability (quadruple oscillation in the synchrotron light) has been observed, this oscillation can be eliminated by octupole(for SR mode). For colliding mode, the transverse feedback must be necessary. Beam-beam instability has been observed also. The instability behaves on beam blowup, lifetime reduction, difficulty of “2nd” beam injection or “1st” beam losing. The solution is optimizing the colliding condition.

Quadrupole oscillation for SR mode R4OOCT=0A R4OOCT=-1.5A

Lifetime Beam lifetime is main contributed by Touschek lifetime, The lifetime strongly relies on vertical COD The shaker strength of tune measurement has large effect on the lifetime because the beam size changed by shaker The reason that Touschek lifetime is smaller than 7hrs prediction need study

Luminosity BBS can verify whether the two beams are in collision, but how good are the collision only can be detected directly by luminosity detector or in- directly by tune-tuneshift. The luminosity detectors have two kinds 0-angle and bar-bar, but they are suffered by the background and still need calibration Temporarily the tuneshift are used for estimation the luminosity Reading out the tune shift is not so easy. The peak occur sometimes in e- ring sometimes in e+ ring. Sometimes only in horizontal plane.

Tuneshift measurement

Luminosity The shake strength has effect on the tune shift. If too strong, the tune shift will become smaller, if too weak the peak will not occur So far, the maximum vertical tune shift is about beam-beam parameter~0.012:0.017 the luminosity=2.17*10 34 *1.89GeV*(0.012~0.017)*0. 005A/5cm=(5~7)*10 29 (1/cm 2 /s)

Summary BEPCII backup scheme including to SR mode and colliding mode have successfully achieved beam storage and the two beams’ collision. There are huge works to be done in more detail