Municipal Water District of Orange County OC Water Reliability Study INTERIM REPORT Review Interim Phase 1 Results December 8, 2015 Orange County Business.

Slides:



Advertisements
Similar presentations
WATER FOR THE 21 st CENTURY ECONOMY AND ENVIRONMENT Santa Ana River Watershed Conference April 11, 2013.
Advertisements

THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
Colorado River Basin Water Supply and Demand Study December 10, 2010.
Climate Change and Municipal Water Supplies Presented by Lorna Stickel Portland Water Bureau and Regional Water Providers Consortium Project Manager.
Exploring Regional Desalination as a Water Supply Option in the Bay Area The Who, What, When, Where, Why and How of Regional Water Supply Planning May.
San Gabriel Valley Water Forum August 28, 2012 San Gabriel Valley’s Water Supply A Plan for the Future San Gabriel Valley’s Water Supply A Plan for the.
Overview of California’s System Yield Threats, Challenges, and the Need to Augment and Diversify Water Portfolios Robert Shibatani CEO & Principal Hydrologist.
CMUA Legislative Briefing February 26, Regional water wholesaler 26 Member Agencies 6 counties Serving approximately 19 million residents 5,200.
Municipal Water District of Orange County SURVEY OF CUSTOMERS REGARDING KEY WATER ISSUES Survey of 500 Orange County residents in MWDOC service area October.
Analysis of Water Resources Management Strategies for the Santa Ana River Watershed Region: Reuse, Recharge, Use Efficiency Nathan Adams Heather Allen.
1 Measuring Performance of Resource Management Responses Rich Juricich (DWR) David Groves (RAND)
CADIZ INC. Sustainable Land, Water & Agricultural Resources (NASDAQ: CDZI) June 2015.
Water Planning in the Western U.S. Impacts and Opportunities for Investor-Owned Water Utilities Jeffrey Stuck, Environmental Management Director American.
1 Statewide Water Supply Initiative Gunnison Water Workshop July 29, 2005.
August 23, 2012 Urban Water Institute August 23, 2012 Can the Colorado River meet our Region’s Future Water Supply Needs? Bill Hasencamp Manager, Colorado.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
SANTA MARGARITA WATER DISTRICT. South Orange County Service Area SMWD TCWD IRWD LBCWD ETWD MNWD SJC SCWD MWD Lake Mathews.
Overview of the Colorado River Basin Water Supply and Demand Study Urban Water Institute 19 th Annual Water Policy Conference August 22-24, 2012 San Diego.
2 nd Public Meeting - Options March 30, Agenda  Overview of Water Issues  What is a WIRP?  Purpose of WIRP  Evaluation Process  WIRP Objectives.
To San Francisco The Delta Sacramento River  Stockton San Joaquin River California Aqueduct Clifton Court Forebay California depends on fresh water from.
Orange County Business Council Infrastructure Committee
BAWSCA’s Strategy In 2009, BAWSCA embarked on the Long- Term Reliable Water Supply Strategy to: o Determine the Water Supply Problem When, where, and how.
1 Emergency Financial Response: Drought Rates May 15, 2014.
1 California Water Plan Update 2009 Where We’ve Been Where We Are Going South Lahontan Regional Workshop Palmdale July 10, 2007.
Colorado River Basin Water Supply and Demand Study Next Steps: Agriculture Conservation, Productivity, and Transfers Workgroup Urban Water Institute Conference.
LAKESHASTA LAKEOROVILLE Bay-Delta STATE WATER PROJECT (2.0 MAF) LOS ANGELES AQUEDUCTS (0.5 MAF) COLORADO RIVER AQUEDUCT (1.25 MAF) METROPOLITAN WATER.
San Diego County Water Issues 2010 Update Maritime Business and Technology Summit November 16, 2010 Seawater Desalination for San Diego.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
Urban Water Institute August 27, 2015 Managing the Colorado River during Drought.
Overview of Conservation Options in the Colorado River Basin Water Supply & Demand Study WEAN-CRB Webinar January 9, 2013.
Citizens Coordinate for Century 3 February 27, 2014 Dennis A. Cushman, Assistant General Manager San Diego County Water Authority.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
San Gabriel Valley Water Forum August 28, Delta LA Aqueduct Colorado River Aqueduct Supplies State Water Project Supplies Sierra Mtns Local Groundwater.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
1. 2 Regional water wholesaler to 6 counties covering 5,200 square miles Serves 19 million people = 50% of the state’s population with projected population.
Slide 1 February 21, 2006 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Water Supply Reliability Oakdale Irrigation.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
California Water Jeffrey Kightlinger, General Manager
California Water Plan Old and New Steve Macaulay, Executive Director.
Water Management and Climate Change in the US- Mexico Border Region Robert Lempert Senior Scientist RAND September 27, 2008.
California Water Briefing APRIL 2006 Department of Water Resources.
Water in 2030 SC Water Dialog November 3, 2010 Peer A. Swan.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
Draft example: Indicators for water supply reliability and storage projects Presented by Steve Roberts (Department of Water Resources, Storage Investigations)
Urban Water Institute Colorado River Lower Basin Issues Tanya Trujillo Colorado River Board of California February 10, 2016.
1 Recommended Next Steps For Improving Quantitative Information California Water Plan Advisory Committee Meeting August 17, 2005.
Slide 1 March 7, 2006 Oakdale Irrigation District Water Resources Plan A Community Plan. A Successful Future. Discussion of Annexation/Expansion Issues.
Integrated Water Resource Plan Water Planning and Stewardship Committee June 9, 2008.
Southern California Water Dialogue September 23, 2015.
Shopping for Water How the Market Can Mitigate Water Shortages in the American West Gary D. Libecap Bren School of Environmental Science and Management.
Kevin Pearson Public Affairs Officer Eastern Municipal Water District May 13, 2015 Drought Update IREM IE Lunch-N-Learn Presentation.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
1 California Water Plan Update 2009 Assumptions and Estimates Report.
Southern California Water Dialogue September 23, 2015.
Assemblymember Adrin Nazarian
Santa Ana River Conservation and Conjunctive Use Program (SARCCUP) Decision-Support Model DSM Overview December 22, 2016.
Drought Management Update
2015 Urban Water Management Plan Overview
OCWD Speakers Bureau 10 min static
Water Resources Plan 2040 Update
STATEWIDE DROUGHT RESPONSE: IMPACT TO SOUTH ORANGE COUNTY
Zone 7 And WaterFix March 7, 2018
FY st Draft Budget Administration & Finance Committee Municipal Water District of Orange County February 14, 2018.
OCWD Speakers Bureau 10 min static
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
MWDOC Urban Water Management Plan
California Water Commission
Los Angeles County Department of Public Works
Claude “Bud” Lewis Desalination Plant
Presentation transcript:

Municipal Water District of Orange County OC Water Reliability Study INTERIM REPORT Review Interim Phase 1 Results December 8, 2015 Orange County Business Council 1

California/OC Economy California: Has a gross domestic product of $2.2 trillion – the 8 th largest in the world Contributes 13% to the output of the U.S. Exports $174 billion; Imports $230 billion Produces more food than any other state – 40% of the annual national agricultural output OC has a similar robust economy! California and OC should plan for a high degree of reliability in future supplies – the OC Water Reliability Study should help to understand what that means

Supply GAP Findings Three Scenarios were modeled out to 2040, both with and Without the California WaterFix (Delta Fix). Under the most likely Scenario 2, assuming the Delta Fix does not occur: Modest shortages begin in 2020, 8,500 AF per year on average (about 1.5% of demands) with an occurrence of about 1 in 10 years Large shortages occur by 2040, 74,000 AF (about 13% of demands) with an occurrence of about 5 in 10 years Annual shortages in 2040 could range from 0 to 170,000 AF under different hydrologies 3

Supply GAP Findings Scenario 1 shortages would be lower and Scenario 3 shortages would be higher, mainly due to assumptions regarding growth and impacts of climate change The Delta Fix significantly reduce average shortages by 77% for Scenario 2, to 17,000 AF. Decision-making must take into account the large influence of the California Fix. MET and OC are much more reliable with the Fix. Just in time planning can be risky. 4

Introduction to GAP Analysis 5 GAPs represent the inability to meet demands under the given Scenario The GAP Analysis being discussed today ASSUMES: NO NEW PROJECTS either at MET, among the MET Member Agencies or in OC Exceptions for OC are that GWRS Expansion to 130,000 AF per year occurs OC Agencies proceed with expansions of existing recycled water systems

What Projects are NOT Included in the GAP Analysis? 9 Orange County Poseidon HB or Doheny Ocean desalination OCWD basin storage San Juan Basin yield augmentation Direct Potable Reuse Cadiz MET MET PVID Land Purchase MET Indirect Potable Reuse Project Delta Islands Additional Transfers & Exchanges Additional Local Projects

Why Assumptions of “No NEW Projects”in the GAP Analysis 7 This allows portfolios of NEW projects to be “tested” via the modeling to determine the specific reliability improvements to be achieved and they can be compared to other portfolios of projects This evaluation will be conducted in Phase 2 (Feb – Apr 2016)

OC Supply GAP Findings in 2040 Average shortages 8 DRAFT - No NEW Projects 3% Scenario 2 13% 30,000 60,000 90, ,000 Supply GAP Shortage in acre-feet Without Delta Fix With Fix 17,000 74,000

OC Supply GAP Findings in 2040 Average shortages 9 DRAFT - No NEW Projects Scenario 1 Scenario 3 3% Scenario 2 23% 1% 6% 13% 12% 30,000 60,000 90, ,000 Supply GAP Shortage in acre-feet Without Delta Fix With Fix 64, ,000 17,000 74,000 4,800 32,000

10 Benefit of the Delta Fix in 2040 – Probability = average values Acre-Feet 17,000 No Delta Fix WITH Delta Fix

11 Growth in GAP 2020 to 2040 Acre-Feet 74,000 (13%) 8,500 (1.5%) 2020

OC Projects Ocean desalination OCWD basin storage Water transfers and banking San Juan Basin yield augmentation Additional recycling Water Use Efficiency Emergency power supplies MET Projects California WaterFix MET IPR Project PVID Land Purchase Delta Islands Transfers & Exchanges Potental Projects to Eliminate the GAPS 12

Study Phasing 13 Phase 1 Develop data, models, OC water demand projections for 25 years and analyze supply & system GAPS under various scenarios Develop list of projects (portfolios) that can fill the GAPS Phase 1 Extension – started Nov 30 Staff workshops to gather input from member agencies Phase 2 = Feb – Apr 2016 Quantifies the reliability improvement from project portfolios (groups of projects to fill GAPS) Decisions to be made by all water entities – not dictated by MWDOC Provide local officials best information to chart course for decisions affecting their stakeholders Model GAPS Alternatives Evaluations Decisions

Major Uncertainties 9 UncertaintyRange of Outcomes California WaterFixNo/Yes MET Demands (growth)Lower/Higher MET IRP Policies & InvestmentsHigher or Lower Reliability OC DemandsRebound from 2015/WUE Regional Local SuppliesLow, High Regional WUELow, High Climate Variability/Change (CRA & SWP)None, Moderate, High Santa Ana River BaseflowsLow, Med Bureau of Reclamation Basin StudyLong Term Sustainability DWR Projections of SWP YieldRange of Outcomes EarthquakesWill happen

What is the meaning of being reliable? 15 MET Reliability Definition “…meet all retail-level water demands under all foreseeable hydrologic conditions” “Through the implementation of the IRP, Metropolitan and its member agencies will have the full capability to meet full-service demands at the retail level at all times.” Should reliability involve “water rationing or demand curtailment”? If we have to ask customers to reduce water usage to meet demands at certain times, are we fully reliable? What role? What is the cost of the last unit of shortage?

16 System How well can the infrastructure serve customers if parts of the local or regional system are out of service Supply Having the wet stuff to meet supplies on a sustainable basis Two Types of Water Reliability 4

EMERGEN CY GAP Analysis (System Reliability) 17 Local Supplies Groundwater & Recycling Ocean Desalination (future) Where Orange County Gets Its Water 50% Import - 50% Local Conservation (Water Use Efficiency) Colorado River Aqueduct (1941) State Water Project Entitlement (1972) Transfers & Storage Bay Delta Area X X X = Potential Earthquake Locations X X Primary Risks: Earthquakes Power Outages

OC Water Demand Forecast 18

Supply Gap – Average Shortage (AFY) Possible Proxy for Base-loaded Need* 19 Scenario 1 Scenario 2 Scenario 3 OC TotalA. No FixB. With Fix A. No FixB. With Fix A. No FixB. With Fix 20206,000 8,500 14, ,0004,80074,00017,000126,00064,000 * Examples of base-loaded supplies include additional active conservation, desalination, non-potable reuse, indirect potable reuse, agricultural land fallowing, and take or pay water transfers that are implemented by MET and/or OC. Updated OCWD Basin Run

20 OC Total Supply Gap in 2040 – Phase 2 Example Acre-Feet Scenario 2a – No Fix Water Utilized Remaining Shortage = 22,000 AF Water to Storage = 28,000 AF??

Sensitivity of the Modeling The most sensitive model parameters are: Whether or not the California Fix is in place, and by when The extent that climate change impacts our supply reliability, which can take many forms: Loss of the snow pack in the Sierras and Rocky’s affecting imported water Higher reservoir evapotranspiration Reduced groundwater recharge statewide and locally Increased water demands for irrigation and cooling from higher temperatures 21

Click to add title Phase 2 Balancing Decisions Without CA WaterFix Level of Investment MET IRP OC Reliability With CA WaterFix Comfort with Risk Phase 2 will help agencies and elected to deal with these judgements