The Worldwide LHC Computing Grid Introduction & Housekeeping Collaboration Workshop, Jan 2007.

Slides:



Advertisements
Similar presentations
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
Advertisements

Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Resources for the ATLAS Offline Computing Basis for the Estimates ATLAS Distributed Computing Model Cost Estimates Present Status Sharing of Resources.
Current Monte Carlo calculation activities in ATLAS (ATLAS Data Challenges) Oxana Smirnova LCG/ATLAS, Lund University SWEGRID Seminar (April 9, 2003, Uppsala)
HLT Collaboration (23-Jun-15) 1 High Level Trigger HLT PRR Planning Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer Science University.
1 Data Storage MICE DAQ Workshop 10 th February 2006 Malcolm Ellis & Paul Kyberd.
Les Les Robertson WLCG Project Leader WLCG – Worldwide LHC Computing Grid Where we are now & the Challenges of Real Data CHEP 2007 Victoria BC 3 September.
December Pre-GDB meeting1 CCRC08-1 ATLAS’ plans and intentions Kors Bos NIKHEF, Amsterdam.
G. Cosmo & M.G. Pia. The Training Kit Project Gabriele Cosmo & Maria Grazia Pia Geant4 Workshop Paris, October 2000
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also.
Stefano Belforte INFN Trieste 1 CMS SC4 etc. July 5, 2006 CMS Service Challenge 4 and beyond.
Les Les Robertson LCG Project Leader LCG - The Worldwide LHC Computing Grid LHC Data Analysis Challenges for 100 Computing Centres in 20 Countries HEPiX.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
CERN - IT Department CH-1211 Genève 23 Switzerland t LCG Deployment GridPP 18, Glasgow, 21 st March 2007 Tony Cass Leader, Fabric Infrastructure.
SC4 Workshop Outline (Strong overlap with POW!) 1.Get data rates at all Tier1s up to MoU Values Recent re-run shows the way! (More on next slides…) 2.Re-deploy.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
WLCG Collaboration Workshop Workshop Summary CHEP 2007 Victoria, BC, Canada.
News from the Beatenberg Trigger Workshop Ricardo Gonçalo - 18 February 2009 Higgs WG Meeting during ATLAS Week.
Computing Infrastructure Status. LHCb Computing Status LHCb LHCC mini-review, February The LHCb Computing Model: a reminder m Simulation is using.
K. De UTA Grid Workshop April 2002 U.S. ATLAS Grid Testbed Workshop at UTA Introduction and Goals Kaushik De University of Texas at Arlington.
Finnish DataGrid meeting, CSC, Otaniemi, V. Karimäki (HIP) DataGrid meeting, CSC V. Karimäki (HIP) V. Karimäki (HIP) Otaniemi, 28 August, 2000.
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
LCG LHC Computing Grid Project – LCG CERN – European Organisation for Nuclear Research Geneva, Switzerland LCG LHCC Comprehensive.
The Worldwide LHC Computing Grid WLCG Service Ramp-Up LHCC Referees’ Meeting, January 2007.
WLCG Collaboration Workshop 7 – 9 July, Imperial College, London In Collaboration With GridPP Workshop Outline, Registration, Accommodation, Social Events.
Les Les Robertson LCG Project Leader WLCG – Management Overview LHCC Comprehensive Review September 2006.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
Conditions Metadata for TAGs Elizabeth Gallas, (Ryan Buckingham, Jeff Tseng) - Oxford ATLAS Software & Computing Workshop CERN – April 19-23, 2010.
The Worldwide LHC Computing Grid Report from the Jan 22 – 26 WLCG Collaboration week GDB, February 7 th 2007.
SC4 Planning Planning for the Initial LCG Service September 2005.
The Worldwide LHC Computing Grid Summary of Tier2 Workshop / Tutorials Questionnaire Workshop Agenda.
Integration of the ATLAS Tag Database with Data Management and Analysis Components Caitriana Nicholson University of Glasgow 3 rd September 2007 CHEP,
CCRC’08 Monthly Update ~~~ WLCG Grid Deployment Board, 14 th May 2008 Are we having fun yet?
WLCG Planning Issues GDB June Harry Renshall, Jamie Shiers.
WLCG Service Report ~~~ WLCG Management Board, 16 th September 2008 Minutes from daily meetings.
The ATLAS Computing Model and USATLAS Tier-2/Tier-3 Meeting Shawn McKee University of Michigan Joint Techs, FNAL July 16 th, 2007.
Report from GSSD Storage Workshop Flavia Donno CERN WLCG GDB 4 July 2007.
Computing Issues for the ATLAS SWT2. What is SWT2? SWT2 is the U.S. ATLAS Southwestern Tier 2 Consortium UTA is lead institution, along with University.
Victoria, Sept WLCG Collaboration Workshop1 ATLAS Dress Rehersals Kors Bos NIKHEF, Amsterdam.
Distributed Physics Analysis Past, Present, and Future Kaushik De University of Texas at Arlington (ATLAS & D0 Collaborations) ICHEP’06, Moscow July 29,
ATLAS Distributed Analysis Dietrich Liko IT/GD. Overview  Some problems trying to analyze Rome data on the grid Basics Metadata Data  Activities AMI.
The ATLAS Computing & Analysis Model Roger Jones Lancaster University ATLAS UK 06 IPPP, 20/9/2006.
SRM v2.2 Production Deployment SRM v2.2 production deployment at CERN now underway. – One ‘endpoint’ per LHC experiment, plus a public one (as for CASTOR2).
GDB, 07/06/06 CMS Centre Roles à CMS data hierarchy: n RAW (1.5/2MB) -> RECO (0.2/0.4MB) -> AOD (50kB)-> TAG à Tier-0 role: n First-pass.
8 August 2006MB Report on Status and Progress of SC4 activities 1 MB (Snapshot) Report on Status and Progress of SC4 activities A weekly report is gathered.
CERN - IT Department CH-1211 Genève 23 Switzerland t IT-GD-OPS attendance to EGEE’09 IT/GD Group Meeting, 09 October 2009.
WLCG Status Report Ian Bird Austrian Tier 2 Workshop 22 nd June, 2010.
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
Points from DPD task force First meeting last Tuesday (29 th July) – Need to have concrete proposal in 1 month – Still some confusion and nothing very.
Are We Ready for the LHC Data? Roger Jones Lancaster University PPD Xmas Bash RAL, 19/12/06.
ARDA Massimo Lamanna / CERN Massimo Lamanna 2 TOC ARDA Workshop Post-workshop activities Milestones (already shown in December)
Initial Planning towards The Full Dress Rehearsal Michael Ernst.
WLCG Collaboration Workshop 21 – 25 April 2008, CERN Remaining preparations GDB, 2 nd April 2008.
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Dario Barberis: ATLAS DB S&C Week – 3 December Oracle/Frontier and CondDB Consolidation Dario Barberis Genoa University/INFN.
LCG Introduction John Gordon, STFC-RAL GDB November 7th, 2007.
The ALICE Production Patricia Méndez Lorenzo (CERN, IT/PSS) On behalf of the ALICE Offline Project LCG-France Workshop Clermont, 14th March 2007.
ATLAS Computing Model Ghita Rahal CC-IN2P3 Tutorial Atlas CC, Lyon
The Worldwide LHC Computing Grid WLCG Milestones for 2007 Focus on Q1 / Q2 Collaboration Workshop, January 2007.
CERN IT Department CH-1211 Genève 23 Switzerland t EGEE09 Barcelona ATLAS Distributed Data Management Fernando H. Barreiro Megino on behalf.
LHCb Computing 2015 Q3 Report Stefan Roiser LHCC Referees Meeting 1 December 2015.
1-2 March 2006 P. Capiluppi INFN Tier1 for the LHC Experiments: ALICE, ATLAS, CMS, LHCb.
WLCG Tier-2 Asia Workshop TIFR, Mumbai 1-3 December 2006
Data Challenge with the Grid in ATLAS
Readiness of ATLAS Computing - A personal view
Zhongliang Ren 12 June 2006 WLCG Tier2 Workshop at CERN
Preparations for the CMS-HI Computing Workshop in Bologna
R. Graciani for LHCb Mumbay, Feb 2006
ATLAS DC2 & Continuous production
Presentation transcript:

The Worldwide LHC Computing Grid Introduction & Housekeeping Collaboration Workshop, Jan 2007

WLCG Comprehensive Review - Service Challenge 3/4 Status - Housekeeping Coffee will be served outside Monday – Thursday morning inclusive & Wednesday afternoon – timing! Lunch is a problem – delay to ~13:30 ??? Collaboration drink Wednesday evening in R1 Don’t forget to wear your badges! And turn off your phone! Lap-top registration: Modification password: nosmoking

WLCG Comprehensive Review - Service Challenge 3/4 Status - Workshop Feedback >160 people registered and (a few more) participated! –This is very large for a workshop – about same as Mumbai Some comments related directly to this (~40 replies received so far) Requests for more: –Tutorials, particularly “hands-on” –Direct Tier2 involvement –Feedback sessions, planning concrete actions etc.  Active help from Tier2s in preparing / defining future events would be much appreciated –Please not just the usual suspects… See also Duncan Rand’s talk to GridPP16Duncan Rand’sGridPP16 –Some slides included below

WLCG Comprehensive Review - Service Challenge 3/4 Status - Previous Workshop Gripes Why no visit to e.g. ATLAS? Why no introduction to particle physics?  These things could clearly have been arranged Why no suggestion in the meeting Wiki? Why no name badges? (We had CERN access cards, but not for ‘locals’…) Start time (11:00 on Mon&Tue) (dictated by room availability) Better coffee, air conditioning, …  More involvement of Tier1s and Tier2s

WLCG Comprehensive Review - Service Challenge 3/4 Status - Summary Workshops have been well attended and received –Feedback will help guide future events  Need to improve on Tier1+Tier2 involvement –Preparing agenda / chairing sessions / giving talks etc. Strong demand for more tutorials –Hands-on where possible / appropriate Hopefully lots of volunteers to help with future events…

The Worldwide LHC Computing Grid What’s New in WLCG Production Services? Collaboration Workshop, Jan 2007

WLCG Comprehensive Review - Service Challenge 3/4 Status - What’s New in WLCG? 1.Stability 2.Stability 3.Stability  And a bit of functionality too… Thursday 25 th January 2007 The Day After Tomorrow  Today…

8 WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing of full data chain from DAQ to T-2 chain was major item from last CR Timely testing of full data chain from DAQ to T-2 chain was major item from last CR DAQ  T-0 still largely untested DAQ  T-0 still largely untested

9 LCG WLCG Commissioning Schedule SC4 – becomes initial service when reliability and performance goals met 01jul07 - service commissioned - full 2007 capacity, performance Continued testing of computing models, basic services Testing DAQ  Tier-0 (??) & integrating into DAQ  Tier-0  Tier-1 data flow Building up end-user analysis support Exercising the computing systems, ramping up job rates, data management performance, …. Initial service commissioning – increase performance, reliability, capacity to target levels, experience in monitoring, 24 x 7 operation, …. Introduce residual services Full FTS services; 3D; gLite 3.x; SRM v2.2; VOMS roles; SL(C)4 first collisions in the LHC. Full FTS services demonstrated at 2008 data rates for all required Tx-Ty channels, over extended periods, including recovery (T0-T1).

ATLAS LHCC Progress Report, 27th September 2006 WLCG Comprehensive Review - Service Challenge 3/4 Status - 10 Some details for experts:  Generate O(10 7 ) evts: few days of data taking, ~1 pb -1 at L = cm -2 s -1  Filter events at MC generator level to get physics spectrum expected at HLT output  Pass events through G4 simulation (realistic “as installed” detector geometry)  Mix events from various physics channels to reproduce HLT physics output  Run LVL1 simulation (flag mode)  Produce byte streams  emulate the raw data  Send raw data to Point 1, pass through HLT nodes (flag mode) and SFO, write out events by streams, closing files at boundary of luminosity blocks.  Send events from Point 1 to Tier0  Perform calibration & alignment at Tier0 (also outside ?)  Run reconstruction at Tier0 (and maybe Tier1s ?)  produce ESD, AOD, TAGs  Distribute ESD, AOD, TAGs to Tier1s and Tier2s  Perform distributed analysis (possibly at Tier2s) using TAGs  MCTruth propagated down to ESD only (no truth in AOD or TAGs) before A complete exercise of the full chain from trigger to (distributed) analysis, to be performed in 2007, a few months before data taking starts Ambitious goals… need to plan it carefully (both in terms of effort needed and of technical issues and implications) Looking further ahead: ‘The Dress Rehearsal’ (A Mid Summer Night’s Dream?) First FDR = First Dress Rehearsal Services must be in place well before to allow adequate time for testing – ‘SM’ is T 0 -2months

WLCG Comprehensive Review - Service Challenge 3/4 Status - Operations Issues WLCG Collaboration workshop ‘pauses’ Thursday lunchtime & restarts Friday with BOF sessions and Experiment Tutorials Thursday afternoon: –Joint Operations Workshop (continues Friday am) –[ WLCG Collaboration Meeting (closed) ] Final Plenary session: –Integration of Grid and Experiment service operations, both globally and regionally Experiment Operations Coordinators, Tier1 Representatives, EGEE / OSG / NDGF / WLCG Operations Coordinators