1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

We make life safer A preventative approach to fires in thatch properties Hampshire Fire and Rescue Service.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
BRYAN YOUNG Preventative Maintenance Working With Safety.
Developed by Western Iowa Tech Community College This material was produced under a grant (SH F-19) from the Occupational Safety and Health.
FOR OIL AND GAS INDUSTRY W.K.Wimalsiri & T.A.Piyasiri University of Moratuwa.
Where are we now? D.Napier / W.Crawford Dropped Object Progress.
Product Receiving, Storing, and Issuing
LATA Environmental Services of Kentucky, LLC Process for Approved Supplier Selection and Evaluation ASME NQA (and Addenda through 2007), Part I.
SUPPLY CHAIN & LOGISTICS Career Opportunities. What is Logistics?  Logistics is the management of the flow of resources between the point of origin and.
Internal Controls Becoming Compliant. Design & Implementation of Internal Controls. Design: Need to show that a framework is in place to establish internal.
Safety and Health Management Program
Welding, Cutting, and Brazing
Crane Operations Objective
Sheila Schulmeyer CAS February 12, 2012 Permian Basin STEPS.
How much do you do?. What is a Boiler? A boiler is a vessel that is is under pressure and is being heated. The boiler will have a National Board # on.
Hazard identification and Risk assessment
ABB LCC ECS - 1 © 2004  Industrial IT Power Management System Scope & Value Proposition Lead Competence Center Electrical Control Systems.
INDUSTRIAL & SYSTEMS ENGINEERING
Introduction to SAP R/3.
SAP R/3 Materials Management Module
Summary Maximo is an Enterprise Asset Management System used by Cornell University Facilities Services. Many of Cornell's physical assets found across.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
Starter Kit. Starter kit Production : Cut operations receiving ECN (Eng. Change Notice) Auto copy to prod orders details Shop floor reporting Generic.

Supply Chain ERP: Vendor Training Change is coming …. Change is Here!!!!!!!!!!
Selling Fire Sentry Products in the Oil, Gas, and Petrochemical Markets.
ISO OPERATIONAL CONTROL
Operating and maintenance of generator. Operating Generator If it is manually operated generator, whenever power goes off, before starting the generator,
Health and Safety Policy
Job Safety Analysis (JSA)
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
Introduction to Business © Thomson South-Western ChapterChapter Production and Business Operations Types of Production Production Planning.
MODU Safety Committee Objective The objective of this Procedure is to establish the terms of reference for the Safety Committee on board the MODU.
Presentation on Preventive Maintenance
QUALITY MANAGEMENT STATEMENT
MAXIMO Creating Workorders 12/1/06
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
PMO2000™ 1 Improved Reliability through PM Optimisation Project Team: Electrician Planner Mechanic Operator Reliability Engineer.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO By: Abhyudaya Goyal (838471) Maitri Chattopadhyay (835572) Nandini Nataraj (832076) Saswotee.
Welding, Cutting, and Brazing
WELCOME!. Who is T&T Power Group? WELCOME! Who is T&T Power Group? What can we do for you?
Visit us at E mail: Tele:
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
1 Presentation to the Alaska Senate Resources Committee
Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS.
PLAN PRESENTATION ABSTRACT. INTRODUCTION This system has been devised and developed by T.D.Williamson Inc. to enable pipeline operators to carry out maintenance,
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Timing (minutes) Learning ObjectiveMain tasks / ProcessResources / tools 5TitleStandard Operating Procedures for Power Press Machine Slide 1 5Index 
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.

Chapter 6 Question-and-Answer.
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
Maintaining Safety Standards
Problem 9-3, Page 473 Key Control, Control Test Evaluation
Maintaining Safety Standards
An-Najah National University
PREVENTIVE MAINTENANCE By: Mary Solomon Inyang. DEFINITIONS Preventive maintenance refers to regular, routine maintenance to help keep equipment up and.
BACKGROUND 1987 Joint MSC/MEPC working group on:
Transportation of oil BY DR. GHULAM ABBAS.
Transportation of oil BY DR. GHULAM ABBAS.
ZeraWare Safety Software is a sustainable safety management system for managing the core components of a sound safety program. Our user- friendly software.
OSHA Most Frequently Cited Serious Violations
OSHA Most Frequently Cited Serious Violations
Presentation transcript:

1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO

2 What happens in O&G Upstream? Exploration Extraction Separation Storage INTRODUCTION

3 EXPLORATION AND PRODUCTION Exploration Extraction Shock waves are fired into the ground to track the shale rocks which can contain crude oil and gas of market value. Extraction is carried out by drilling a hole in the shale rocks and pumping oil out. Gases are also tapped.

4 SEPARATION AND STORAGE Separation Storage Separation is carried out in specially designed pressure vessels which separated oil and gas from the crude. Crude is stored in special storage tanks which can be used for short of long term storage of heat and cold.

5 HAZARDS AND ACCIDENTS Miscellaneous Machine Hazards Explosions and fires Oil Spills Blowouts Electrical Hazards Oil Spill Oil rig blowout causing fire

6 SAFETY AND PRECAUTIONS Preventing major accidents require the maintenance of production facilities and the sub-sea pipeline network. This can be achieved by performing proper maintenance through POB(Personnel on Board) It is used by O&G Industries to control and monitor the movements of personnel to, fro and between of-shore and on-shore facilities.

7 OFFSHORE PLATFORMS

8 RISK ASSESSMENT

9 PERFORMANCE STANDARD Performance standards are applicable to safety critical equipments. It deals with the efficiency and effectiveness of safety critical equipments at the times of distress. It recognizes whether an equipment is installable at a particular location. Some examples of safety critical equipments are lifeboats, fire extinguishers, fire pump, gas detector.

10 Planned Maintenance Routine PMR is a document that includes a set of protocols that need to be carried out during the maintenance work. It includes step by step procedure of how a particular work has to be performed in order to avoid any emergencies. Benefits : Increased resource productivity. Greater reliability of existing capacity. Improvement in up-time. Enhanced personnel satisfaction by meeting production targets and business goals.

11 WORK TYPE Planned Work: Work done on a maintenance basis to avoid breakdown. Corrective Work: Work done when some transient error was detected in any equipment. Breakdown Work: Work done when an equipment breakdown occurs. Onshore repair: OEM related repairs and expenditures are included in this work type. Visit: Work Orders are created when any external crew like a management personnel pays visit to an oil rig. Non Work Related Material: Request for consumable resources like oil and gloves are made through this work type.

12 LOGISTICS IN OIL AND GAS The overall management of the way resources are obtained, stored and moved to the locations where they are required is called logistics. In the oil and natural gas industry, logistics consists of the systems for gathering and transporting oil, including pipelines and trucks, along with storage and distribution facilities. By having an efficient supply chain and proper logistical procedures, a company can cut costs and increase efficiency.

13 Logistics in oil and gas continued... Ship Item: Items which are specified to be shipped into the rig. Container movement: Ship items are put in containers in order to get shipped Load Items: Ship items are together grouped as load items. Manifest: Load items are loaded into the freight transport and is sailed to the rig. This process is called rig. ROB: In case an item reaches a wrong destination and is sent back, it remains on board till the transport leaves for the specified destination.

14 WORK FLOW

15 TOTAL LOGISTICS PROCESS

16

17 SHOWCASE PM WORKORDER GENERATION Scenario 1 : Child Work order  Generate Work order from PM “Gas Compressor Actuated Valves Inspection”. This should generate 1 Parent Work order and 5 Child Work orders ( Pl ensure that the route attached in the PM is of appropriate type).  Go to Plans Tab and showcase that there are automatically 5 child work orders in Children of Work order section.

18

19

20 Scenario 2 : Job Plan details copied to Work order Generate Work order from PM “15 MONTHLY OVERSPEED TRIP TEST ROUTINE “. This should generate the Work order with all the details planned in the associated Job Plan. In the Work order Tab showcase that the Job Details section is auto-populated. Go to Plans Tab and showcase that the Task section is automatically populated with the tasks from Job Plan + Labor sub Tab is automatically populated with the crafts added in the Job Plan earlier.

21

22

23 Scenario 3 : Create New Work order  Enter description as “ Fire Pump not Starting. Repair/Replace as required ” Since this is a corrective WO  Select Work Type as CM Select Location as  Failure Class should auto-populate as JBEL ( for this you need to ensure that the Location has this Failure Class entered) Select Problem Code as EXECF GL account should also be auto-populated from the Location application Add 1 Task  Open and Check Motor……Add 1 Labor  ELEC… duration 1 hr Add Material as Line Type Material -  Description as “Electrical Cable Gland”, Qty 2, Unit Price as 100 Approve the work order Go to Inventory>Reorder>Reorder Direct Issue Items ……PR will be created Go to PR….Approve PR….Go to select Action >Create PO Go to PO and add vendor ……Approve PO Receive the Material (Here talk about “Pass to Cargo? Check box)

24 Do Invoice Go to Work order  show here that in Actuals tab Material sub tab is auto-populated because of receiving Work order> Actuals Tab> Labor sub tab> Add hours for 1 craft In Failure Reporting Tab  select Cause as “GLAEF-ELECTRICAL CABLE GLAND FAULT” and Remedy as REPLCACED Complete the Work Order that means change the status of the Work order to COMP Create a followup Work order  Go to Select Action and Create>Work order Go to related Records Tab and show the relationship

25

26

27