Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

27/02/2002M.D.P. - ATLAS Muon Week1 First results of Atlas RPC cosmic rays test Massimo Della Pietra Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M.
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Atsuhiko Ochi Kobe University 4/10/ th RD51 collaboration meeting.
COSMIC RAY MUON DETECTION USING SCINTILLATION COUNTER AND WAVELENGTH SHIFTING FIBERS ARUNODAYA BHATTACHARYA VSRP-2009,TIFR,MUMBAI 6/7/09.
Development of high rate RPCs Lei Xia Argonne National Laboratory.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
ARNAB BANERJEE Variable Energy Cyclotron Centre, India.
1 Apr. 28, 2007 Test of the Pulse Height and Time Jitter for the IHEP Full-Size RPC’s with 8-m-Long Readout Strip Planes C. Lu, K. McDonald and W. Sands.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
Large Cell Scope Pictures HV Gnd 1nF Large Cell Tube Anode signal Cathode signal scope S1 S2 S1 S2 The following scope pictures were all taken with the.
Rate and Gain Measurements of the 1-m long GEM detector Aiwu Zhang EIC tracking R&D weekly meeting.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
Status of DRIFT II Ed Daw representing the DRIFT collaboration: Univ. of Sheffield, Univ. of Edinburgh, Occidental College, Univ. of New Mexico Overview.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
PHENIX RPC in China Li Ye Shouyang Hu Xiaomei LI China Institute of Atomic Energy
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
Development of a DHCAL with Resistive Plate Chambers ECFA/DESY Workshop at NIKHEF, Amsterdam, Netherlands April 1 - 4, 2003 José Repond Argonne National.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
On aging problem of glass Resistive Plate Chambers India-based Neutrino Observatory (INO) collaboration JIGSAW.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
1 Test on RPC Veto Detector Model —— Anticoincidence Detector for Daya Bay Neutrino Exp. Speaker: Jiawen Zhang 5 June 2006.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Test Beam the μ-RWELL Test Beam the μ-RWELL G. Bencivenni (a), R. de Oliveira (b), M. Gatta (a), G. Felici (a), G. Morello (a), M. Poli Lener (a) (a),
Design of a readout system for RPCs Olu Amoda2 The LODEN Group The group is an association of Fermilab scientists who teamed up to build a cosmic ray.
Prototypes of high rate MRPC for CBM TOF Jingbo Wang Department of Engineering Physics, Tsinghua University, Beijing, China RPC-2010-Darmstadt, Germany.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Andrea Di Simone Andrea Di Simone – INFN Roma2 Andrea Di Simone CERN PH/ATC and INFN-CNAF On behalf of ATLAS RPC groups: Lecce, Napoli, Protvino, Roma2.
M. Bianco On behalf of the ATLAS Collaboration
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Hadronic interaction studies with the ARGO-YBJ experiment (5,800 m 2 ) 10 Pads (56 x 62 cm 2 ) for each RPC 8 Strips (6.5 x 62 cm 2 ) for each Pad ( 
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
ArgoYBJ: further steps for the next thfuture WAPP 2009 Bose Institute, Mayapuri, Darjeeling Dec 12 th 2009 By R. Santonico.
C.Gustavino, october 28-31, The RPC testing LNGS The RPC testing LNGS Outline : Trigger walls (Glass RPC, Flat Cable Strips,
OPERA Coll.Meet. October 2002Luca Stanco - Padova1 1.Status of Magnets and financial orders (including RPC) Mario Spinetti15’ 2.Status of RPC (including.
Tests of RPCs (Resistive Plate Chambers) for the ARGO experiment at YBJ G. Aielli¹, P.Camarri¹, R. Cardarelli¹, M. Civardi², L. Di Stante¹, B. Liberti¹,
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
An autonomous system for muon densitometry SIMON BOUTEILLE CEA/Irfu/SPhN.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
Test results of Multi-gap RPC Test Chambers for a Digital HCAL  Geometrical design  Test setup  Signal: avalanche mode and streamer mode  Comparison.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Study of gas mixture containing SF6 for the OPERA RPCs A.Paoloni, A. Mengucci (LNF)
1 Analysis of Small RPC DHCAL Prototype Data (noise and cosmic ray) LCWA09, Albuquerque, New Mexico Friday, October 02, 2009 Qingmin Zhang HEP Division,
Quality Assurance procedures for the construction of ALICE TOF detector VIIIth Workshop on Resistive Plate Chambers and Related Detectors October.
For 2016 RPCWorkshop 1 Charge Distribution dependency on gap thickness of CMS endcap RPC Sung Park, KODEL, Korea Univ On behalf of the CMS RPC group 1.
Siena 2002 Siena, 24/10/2002 G. Passaleva New results from an extensive aging test on bakelite RPC G. Passaleva INFN Firenze.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
RPCs with Ar-CO2 mix G. Aielli; R.Cardarelli; A. Zerbini For the ATLAS ROMA2 group.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
Carlo Gustavino INFN-LNGS On behalf of the OPERA RPC group IX International Workshop on Resistive Plate Chambers and Related Detectors Mumbai, February.
Results achieved so far to improve the RPC rate capability
Production ad Quality control of RPCs for the CMS muon barrel system
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
Multigap Resistive Plate Chambers (MRPC)
News on second coordinate readout
Han Jifeng BESIII MUON GROUP IHEP, CAS
BESIII RPC Detector Jiawen Zhang
11th Pisa meeting on advanced detectors
Resistive Plate Chambers performance with Cosmic Rays
RPC approved plots.
Presentation transcript:

Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova, Zagreb) OPERA collaboration meeting Hamburg 3-5 June 2004

The first spectrometer in the Hall C Environment parameters: T=16 o C (at the base of the spectrometer) P~900 mbar (few mbar higher wrt external lab) Dry=50-60% (wetter wrt external lab) RPC layers 1  11 RPC layers 12  22 Eastern side Row 1 Row 7 Hall C lateral wall To compare experimental results with data from ext. lab, rescale applied voltages to fixed T 0 =293 K and P 0 =900 mbar: V=V applied *(T/T 0 )*(P 0 /P)

Tests with nitrogen For the installed RPCs validation, we kept the detector at 6.5 kV, below the discharge region, but above the operating voltage with the gas mixture: Test the HV system  found that an additional PET layer is needed for the insulation of HV electrodes from the strips Test mechanical stresses by comparing the currents before and after the iron slab installation  in case reduction of the filling material thickness N 2 Test

Test with gas mixture We have the permission to use small quantities of the mixture Ar/C 2 H 2 F 4 /i-C 4 H 10 /SF 6 =75/20/4/1 in premixed bottles Test a RPC row (~9 m 2 ) at a time, flushed at 5 refills/day The row is covered by a panel of 32 horizontal strips, served by 2 IC boards Up to now tested the row n.1 of layers n.9,18 and 19

Test set-up The strip panel is self-triggered using two Timing boards installed on the InterConnection boards Each timing board is endowed with a double threshold discriminator acting on the analog sum of 16 strips Threshold low = ~20 mV Threshold high = 25 mV (40 mV in the first measurements) 32 ADC channels used for measuring the charge induced in each strip Also counting rates and currents are measured

Test of the set-up in Frascati Used a small size old RPC prototype Higher Pressure wrt GS lab  expected operating voltages below 6 kV in Hall C Counting rate Induced charge

Reference plots at the external lab RPC BES1451 under test at Ciocco facility for ‘‘ageing’’ studies at cosmic rays rate MACRO FE boards used Effect due to fast increase of the current with high resistivity ? Chosen operating point: 5.5 kV

Operating currents in Hall C Layer n.9 Layer n.18Layer n.19 The currents at the operating point are below 350 nA, lower wrt to QC tests at external GS lab Their increase is faster for the eastern RPC (near the lateral wall of Hall C)

Counting rates in Hall C Layer n.9 Layer n.19Layer n.18 The counting rates at the operating point are of the order of few Hz/m 2 (to be compared with Hz/m 2 at cosmic rays rate) The counting rates are higher for the eastern RPC (near the lateral wall of Hall C) There is not a plateau, but an exponential dependence on the operating voltage

Threshold studies The rates have been measured at 5.5 kV with the lower threshold at 20 mV Good higher threshold stability till 60 mV

Induced charge The average induced charge at 5.5 kV is about 20 pC

Induced charge: layer 9 Entire row Middle + western RPCs

Induced charge: layer 18 Western RPC Middle RPC Eastern RPC

Conclusions Up to now we have tested 9 installed RPCs with the gas mixture Ar/C 2 H 2 F 4 /i-C 4 H 10 /SF 6 =75/20/4/1, observing: 1.Very low operating currents and counting rates 2.No plateau for the counting rate vs the voltage (reference to external lab. measurements essential for determining the operating point) 3.Current and rate higher for RPCs near the lateral side of Hall C These results are a first indication of the goodness of the RPC installation procedure More statistics needed (first installed rows, rows with filling material substituted)

What from QC tests ? BE ± ± ; ; II BIM ± ± ; ; II BE ± ± ; ; OK BES ± ± ; ; II BI ± ± ; ; II BES ± ± ; ; II BES ± ± ; ; II BI ± ± ; ; OK BES ± ± ; ; II Eastern sideEastern side Layer 9 Layer 18 Layer 19 RPC name di/dv (nA/kV)    cm) V 100 ; V 500 (kV) I op (nA); C.R. Q.R. RPC name: Red=high temperature test Green=low temperature test

Strip signals (I) Strip Ground 1 M  pick-up

Strip signals (II) Adjacent strips 50  pick-up

Strip signals (III) Central strip 1 M  pick-up Ground 1 M  pick-up Central strip differential read-out Far strips 50  pick-up

Strip signals (IV) Noise Strip 1 M  pick-up Ground 1 M  pick-up Strip with differential read-out

Induced charge: layer 9 Total induced charge Reconstructed hit position Entire row Middle + western RPCs UpDown

Induced charge: layer 18 UpDown Western RPC Middle RPCEastern RPC

P = 1000 mbar P = 900 mbar Lower operating voltages expected at GS because of the lower pressure Frascati test of the set-up 6.25 kV 5.65 kV T = 20 o C

Strip panel not covering the entire RPC and picking up signals outside its area (more signals at the edge of the panel) Frascati test of the set-up

Found a miscalibration of the nanoamperometers used in hall C (not OPERA standard): the currents are lower by a factor of about 2 Current on the negative electrode from nanoamperometers Current on the positive electrode from power supply Further investigations needed to understand and solve the problem