Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)

Slides:



Advertisements
Similar presentations
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Advertisements

Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Mar RHIC Planning Meeting Tuesday (Mar. 1) 12pm - Sun (Mar. 6) 8pm: 128 hours Data Taking time: 39.5 hours = ~84% Beam time with collisions (including.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
 Safety  Schedule: Past, Present and Future  RHIC and Experiment Reports  Machine and System Reports  AOB.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run-10 Medium-Energy Running Update Stefan Bathe for PHENIX RHIC Machine-Experiment Meeting 3/30/2010.
STAR Agreement on Spin Configuration Plan Bill Christie RHIC Coordination Meeting January 24, 2006 Plan: A.) If the FPD++ installation, debugging, and.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
Run15 pp Achievement and pAu status Itaru Nakagawa RIKEN/RBRC.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
STAR Run 16 Schedule Zhangbu Xu Machine/Experiment Schedule Meeting 01/05/2016.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration Time - 02 April 2013.
Bill Christie For the STAR Collaboration January 5, Outline Detector configuration for Run 16 Data set Goals Desired luminosity profile for Run.
Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
2007 Physics Run Status STAR Collaboration mtg June 12, 2007, Berkeley California Bill Christie Outline Overview of BUR/Goals for Fy07 Run Collider Performance.
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run16 Y. Akiba.
Run-5 Cu-Cu Integrated Luminosity
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments) Other Call in bridge line is

Run 14 plan based on 22 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2013 – FY 2017), 4 Jun Feb, Begin cool-down to 4.5K 4 Feb, Cool-down to 6K in Blue 7 Feb, Blue and Yellow at 4.5 deg K 10-Feb, Beam in Blue and Yellow at injection 15-Feb, Begin √s = 14.6 GeV/n AuAu physics Mar (Tuesday, 0800), End √s = 14.6 GeV/n AuAu physics run begin setup for √s = 200 GeV/n AuAu 15-Mar (~14:00, store 18046), Begin √s = 200 GeV/n AuAu physics run PHENIX 1 st physics store = (15 March) STAR 1 st physics store = (17 March) today, 6 May… 27-Jun, End 15 week √s = 200 GeV/n AuAu run 27-June through 4 July, 7 days contingency/TBD 4-July, begin cryo warm-up 7- July, warm-up complete, 22.0 cryo weeks of operation See for the Run Coordinator’s detailed planhttp://

thru fill Tuesday 6 May

Fischer et. al. “RHIC Collider Projections (FY 2014 – FY 2018)”, 4 June 2013 PHENIX goal STAR goal Max projection Min projection We should update goals soon! thru fill Tuesday 6 May

Fischer et. al. “RHIC Collider Projections (FY 2014 – FY 2018)”, 4 June 2013 thru fill Tuesday 6 May

Fischer et. al. “RHIC Collider Projections (FY 2014 – FY 2018)”, 4 June 2013 Max projection Through 2 May stores

Still ~best store to date (4/18/14) L peak Max Goal

From this morning (5/6/14)

Archive

March !! FY 2014 power rebate $ in BNL bank = -$0.680M, through Mar

Still ~best ~10 (12) hr store

Best Store to date (4/18/14) L peak Max Goal Another good store – a lot more about as good! (4/22/14)

Best Store to date (4/18/14)

PHENIX 200 GeV for 12 weeks, L = 1.5 nb −1 sampled luminosity within |z| < 10 cm]  ~30% within |z| < 10 cm]  ~90% DAQ efficiency  ~50% bandwidth, DAQ saturation factor (?)  11 nb -1 delivered STAR 200 GeV for 14 weeks, L= 10 nb −1 recorded, 10 9 min bias triggers within |z| < 5 cm]  (2x10 9 triggers required)  ~ 60% (should be better) sampling efficiency  16.7 nb -1 delivered 15 GeV for 3 weeks, 150M min bias triggers Goals for Run 14 (based on Beam Use Requests) (11 Feb, DRAFT, to be updated by experiments)

4/8/2014 New Electric Rates for this year

Goal, 1.4 x 10 9 /bunch ~L store avg Goal, 35 x /cm -2 s -1 (not singles corrected)

30 Mar, Store 18145, 9 hr 59 min, nb -1 (40 x cm -2 s -1 ) to PHENIX (assumes 9.5 b xscetion) (Not singles corrected) Store ~best store 31 Mar, Store 18151, 9 hr 49 min, nb -1 (42 x cm -2 s -1 ) to PHENIX

From Ingrassia, Through final fill 18010, 11 Mar 2015 max/min projections from Fischer et.al. “RHIC Collider Projections (FY2014-FY2018)”, 4 June 2013

√s = 14.6 GeV/n AuAu physics, 15 Feb-11 Mar

√s = 14.6 GeV/n AuAu physics, last 24 hours

Fischer et. al. “RHIC Collider Projections (FY 2014 – FY 2018)”, 4 June 2013

Fischer et. Al. “RHIC Collider Projections (FY 2014 – FY 2018)”, 4 June 2013

4 Feb 2014 Blue at 4.5 deg

7 Feb 2014, Blue and Yellow at 4.5 deg K

Who’s Who for 2014

From Fischer et. al., RHIC Collider Projections (FY 2014 – FY 2018), 4 June 2013