ISS Muon Bunch Structure Convenors: S Berg, BNL, and G H Rees, RAL.

Slides:



Advertisements
Similar presentations
A 10 GeV, 4 MW, FFAG, Proton Driver at 50 Hz G H Rees, RAL.
Advertisements

Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Linear Collider Bunch Compressors Andy Wolski Lawrence Berkeley National Laboratory USPAS Santa Barbara, June 2003.
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
20-50 GeV Muon Storage Rings C. Johnstone and G. Rees MuTAC Meeting Fermilab March 16, 2006.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Options for a 50Hz, 10 MW, Short Pulse Spallation Neutron Source G H Rees, ASTeC, CCLRC, RAL, UK.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
FFAG Concepts and Studies David Neuffer Fermilab.
Neutrino Factory,  ± Decay Rings C Johnstone, FNAL, F Meot, CEA, & G H Rees, RAL.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Options for a Multi-GeV Ring Ramping field synchrotron provides fixed tunes and small.
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
Source Group Bethan Dorman Paul Morris Laura Carroll Anthony Green Miriam Dowle Christopher Beach Sazlin Abdul Ghani Nicholas Torr.
2002/7/02 College, London Muon Phase Rotation at PRISM FFAG Akira SATO Osaka University.
2002/7/04 College, London Beam Dynamics Studies of FFAG Akira SATO Osaka University.
Y. Mori Kyoto/KEK FFAG C. OH FFAG: Fixed Field Alternating Gradient Strong focusing(AG focusing, phase focusing) Like synchrotron, but fixed field Moving.
A 3 Pass, Dog-bone Cooling Channel G H Rees, ASTeC, RAL.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Advanced Accelerator Design/Development Proton Accelerator Research and Development at RAL Shinji Machida ASTeC/STFC/RAL 24 March 2011.
1 Muon Acceleration and FFAG II Shinji Machida CCLRC/RAL/ASTeC NuFact06 Summer School August 20-21, 2006.
Source Group Bethan Dorman Paul Morris Laura Carroll Anthony Green Miriam Dowle Christopher Beach Sazlin Abdul Ghani Nicholas Torr.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Harold G. Kirk Brookhaven National Laboratory Target Considerations for Nufact and Superbeams ISS Meeting RAL April 26, 2006.
Neutrino Factory,  ± Decay Rings C Johnstone, FNAL, F Meot, CNRS, & G H Rees, RAL.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
Acceleration System Comparisons S. Machida ASTeC/RAL September, 2005, ISS meeting at CERN.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
First Thoughts on IDS G H Rees, RAL. Topics 1.Two-way, μ ± injection chicane for the dog-bone RLA. 2.Injection energy & efficiency for a first dog-bone.
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
FFAG Studies at RAL G H Rees. FFAG Designs at RAL Hz, 4 MW, 3-10 GeV, Proton Driver (NFFAGI) Hz,1 MW, GeV, ISIS Upgrade (NFFAG) 3.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
4 MW, 50 Hz, 10 GeV, 1 ns (rms), FFAG Proton Driver Study G H Rees, RAL.
3 GeV, 1.2 MW, RCS Booster and 10 GeV, 4.0 MW, NFFAG Proton Driver G H Rees, ASTeC, RAL.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Eric Prebys, FNAL.  We consider motion of particles either through a linear structure or in a circular ring USPAS, Hampton, VA, Jan , 2015 Longitudinal.
Lecture17(Course Summary).PPT - E. Wilson - 3/3/ Slide 1 COURSE SUMMARY A Design Study of a Compressor ring for A Neutrino Factory MT 2009 E. J.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
RCS design Valeri Lebedev AAC Meeting November 16-17, 2009.
1 Tracking study of muon acceleration with FFAGs S. Machida RAL/ASTeC 6 December, ffag/machida_ ppt.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Acceleration.
Towards a Common Proton Driver for a Neutrino Factory
Alternative/complementary Possibilities
Linac possibilities for a Super-B
Isochronous, FFAG Rings with Insertions for Rapid Muon or Electron Acceleration G H Rees, RAL.
Meson Production Efficiencies
FFAG Accelerator Proton Driver for Neutrino Factory
CEPC Injector Damping Ring
LHC (SSC) Byung Yunn CASA.
A Design Study of a Compressor ring for
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
JLEIC 200 GeV ion beam formation options
Updated MEIC Ion Beam Formation Scheme
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

ISS Muon Bunch Structure Convenors: S Berg, BNL, and G H Rees, RAL

ISS 201 MHz Bunch Structure Options (Separate comparison later for lower frequencies) Single train of 80 μ + and 80 μˉ bunches/cycle? Or, n trains of 80 μ + and 80 μˉ bunches/cycle? Factor of 50/3 in μ ± currents proposed to date: n = 1 at F = 15 Hz, I/nF = 50/750 (USA) n = 5 at F = 50 Hz, I/nF = 3/750 (RAL) What are the criteria for choosing n and F?

Factors involved in choice of n and F Preferred values Target thermal shock effect: high F and energy Design of the proton driver: n =3, 4 or 5 ; F = 50 Hz Beam loading in μ ± stages: high n, F and radius Switch-on power for μ ± RF: low F (P scales with F) Design of μ +, μˉ decay rings: n (inj) <6 ; high F (RF)

Target Effects (SB & RB) (SB) π ± and μ ± yields: 10 GeV a good proton energy (except for a carbon target?) (RB) Solid Targets: Thermal shocks reduced at higher F, & by 50 μs delays of n bunches. Liquid Target: The total duration of the proton pulse/cycle must be < 60 μs..

Proton Drivers for the Two Cases (n, F(Hz), T(GeV)) = (1, 15, 26) (5, 50,10) Protons per bunch = 6.4 x Booster bunch L b = 6.4 x L b L b Bunch A (eV sec) = 6.4 x A A (= 0.66) Booster harmonic = 1 6 Driver harmonics = ~ 6, 36, , 216 Final bunch Δp/p = ± 2.0% ± 0.8% Bunch Δt (ns, rms) = < 3 ? 2 1 Δt compression = problematic adiabatic

Proton Driver Longitudinal Bunch Area The bunch area to be compressed (in eV sec) is: A = (8Rα/(ch)) ((2 V(I-  sc )E o  ) / (h  )) ½ Choose low linac energy & booster radius for A < 0.7. Choose 200 MeV linac & m, booster radius. Choose n = 5, h = 6, and protons per bunch. (These allow room for the RF and ease extraction). Choose h = 36 & 216, and 2 x radius for an NFFAG.

Proton Driver Longitudinal Space Charge  sc is the ratio of the longitudinal space charge forces to the focusing forces of RF system.  sc = 1 corresponds to an RF bucket collapse. = 0.4 gives onset of a microwave instability.  sc = 0.21 for V = 93 kV at 0.20 GeV, and = 0.39 for V = 476 kV at 3 GeV in booster.  sc = 0.11 for V = 469 kV at 3 GeV in NFFAG and cancels the inductive wall fields at 10 GeV. V =1.0, 2.5 MV (h=36, 216) at 10 GeV (1 ns rms).

Proton Driver Transverse Space Charge Assume a 2-D elliptic beam density distribution. ΔQ v = - N r p G F / [ π ε v (1 + a/b) β γ 2 B f ] ε v = normalised, 2σ vertical beam emittance G = 1.2 and F = image force enhancement. ε v = 122 (π) mm mrad (2σ, normalised) ΔQ v = in booster after Hˉ injection ΔQ v = in driver at 3 GeV injection ΔQ v = - 0,14 at 10 GeV after compression.

10 GeV, 50 Hz, 4 MW Proton Drivers 180 MeV Hˉ linac + 50 Hz boosters + 2, 25 Hz RCS 180 MeV Hˉ linac + 50 Hz booster + 50 Hz NFFAG(I) A Hˉ linac feeding a chain of 50 Hz FFAGs in series For 1, a slower RCS needs more difficult boosters. For 2, electron models are needed for both options For 3, injection of Hˉ into the first FFAG is difficult. Typical number of bunches are n = 4, 5, …….or 1 8 GeV, 50 Hz, Hˉ linac + accumulator + compressor?

NFFAGI Proton Driver Alternative is a larger, h=6,n=5 RCS & NFFAG

Proton and Muon, 50 Hz Bunch Trains O Proton booster (n=5, h=6) O O O O Proton driver (n=5, h=36) O O O O O Proton bunches at target O O O O T O Pion bunches after target O O O O O Muon, 400 ns bunch trains ( n-1)T< 60 μs (liquid target) T T > 60 μs (for solid targets) μ + μˉ 20 GeV μ + & μˉ accelerator 20/50 GeV μ + decay ring C>1500 m circumference 400 ns bunch trains & 600(+) ns gaps 20/50 GeV μˉ decay ring

Box-car Stacking for Decay Rings Driver has protons, while muons are to be stacked. So, a revised method of box-car stacking is needed. Sequential delays for proton bunches ~ μs, and an unchanging delay through the muon stages. Times insufficient to adjust MHz RF phases. Make MHz a harmonic of driver at 10 GeV.

n = 5, Muon Bunch Pattern in Decay Rings. 2 of 5 interleaved 80 μˉ bunch trains of the adjacent 2nd ring 80 full and 127 (or 130) empty RF buckets >100 ns intervals 80 μ + 127(130) 80 μ + Solid/liquid 148(136) 127(130) 80 μ + 127(130) 80 μ +

Ring RF Harmonic Numbers Rings Beta Circ (m) h RF (MHz) N b /Ring 50 GeV μ Decay x80 20 GeV μ Decay x80 20 GeV μ ± Acc x80 ? GeV μ ± Acc x GeV P Driver GeV Booster

Box-car Transfer of μ + & μˉ to Decay Rings The 20 GeV decay rings, 20 GeV μ ± acc and P driver, of periods T d, T a,T p, all have a harmonic at MHz. The integers p (= 1,2,3,4), n and m are chosen so the proton bunch delays are a good approximation to: (n ± p/5) T d ≈ (m ± 1/12) T p T d, T a, T p = , , μs, (T d /T p ) = Target m n p (m ± 1/12) (n ± p/5) (T d /T p ) |Difference | solid liquid For solid target: (m + 1/12) Tp = n Td Tb (RF period Tb ) For liquid target: (m + 1/12) Tp = n Td Tb

Summary of Proton Driver for MHz Muon Stages (n = 4 considered later) Compression harder if n < 5, F < 50 Hz or T < 10 GeV. The muon decay rings limit n to a maximum at n = 5. Limit F to 50 Hz because of muon RF switch-on costs. It does not appear necessary to increase T > 10 GeV. Final bunch structure depends on accel.& target sites.

MHz Muon Stages 1. Initial Bunch Rotation Stage (Neuffer / Iwashita) Division into 80 bunches is needed to reduce the longitudinal bunch areas and later beam losses. 2. Transverse Cooling Stage (45 30 ? (mm rad)) Helps to reduce losses during muon acceleration. Lowers apertures in μ ± rings & transfer lines (1/√ε). Lowers μ / ν divergence ratio in decay rings (1/√ε). Eases downstream kickers (power scales as ε 2 ). 3. Linac + Ring Options: 1. RLAs, Dog-bone, DRLAs. 2. Linear, Non-scaling, Near-Isochronous FFAGs. 3. Non-linear, Not-scaling, Isochronous IFFAG(I)s.

MHz Muon Acceleration  No allowance for emittance growth in acceleration Beam loss collectors needed for high power levels. Long collimators for the counter-rotating μ ± beams. This infers long straights or insertions for the rings  Beam loading power for the rapid acceleration This scales as 1/nFR, where R is the ring radius. Factor of ~ 50 higher for (1, 15Hz, low R) scheme. 20 GeV ring: 1000 cf 20 units, for 2 MW couplers.  Injection and Extraction Fast Kicker Systems Large systems needed for the two decay rings. Kickers for low R, FFAGs may not be feasible.

Aspects of MHz Options D/RLAs: Kicker magnet systems not necessary. RF systems in zero dispersion straights. Beam loss collectors in some of the arcs? FFAGs: Long.-transv. coupling at large amplitudes. Is there coherent trans. motion or ε growth? How large does the final Δp/p become? IFFAGIs: Beam losses at Q h = 1/3 cell resonances. New GeV design avoids this feature. Tracking studies haven’t yet re-commenced.

μ + and μˉ Decay Rings Separate rings are required to allow both fast injection and the time separations for the n (= 5) bunch trains. For a single detector, racetrack rings are preferred. For 2 detectors, two may be used, in own tunnels. For two distant detectors, triangular, side by side rings in vertical or near vertical plane, have higher efficiency. For detectors at 7500 & 3500 km, rings need to be in a near vertical plane & to have an apex angle of ~ 50°.

Features of Decay Rings  The RF containing fields have to scale as (Δp/p) 2  3, 10 MV systems needed/ring for Δp/p = ± 1%  Reactive beam loading compensation is needed  16, 50 kV PFN, 5 kA pulsers & 10 Ω feeders/ring  8, shorted, 3m, 10 Ω delay line, push pull kickers  The kicker rise and fall times have to be < 600 ns  Collimators in short straight of the isosceles Δ.  Use of radiation hard quadrupoles is proposed

Effect of n = 4 in smaller Decay Rings Benefits are smaller depth, cheaper tunnels for decay rings. Efficiency of the two racetracks is reduced from 38 to 35%. Efficiency of two, 50° apex rings is reduced from 48 to 43%. Options (last is favoured) for changes needed to Proton Driver: 1. F = 62.5 Hz; RF costs up in both Proton Driver and μ ± rings. 2. T = GeV ( or 3-8 and , GeV FFAGs). 3. N = /bunch; RF costs up in Driver & μ ± rings. Lower frequency, longer cavity, RF systems are required. N = /bunch for n = 3 is also feasible (bunches longer).

Lower Frequency Muon RF Systems Examples: Scaling FFAG schemes (KEK), 44/88 MHz RF systems (CERN). KEK: A low repetition rate, 3-50 GeV, Proton Synchrotron. A chain of variable low frequency, scaling FFAGS. RF systems compensate for cavity and beam power. No transverse cooling & no separate bunch division. Apertures are enhanced in scaling FFAG magnets.

Issues for Low Frequency Muon RF RF systems & power costs are key considerations. More space & switch-on power needed for cavities? Issues little changed for the Proton Driver (n = 7?). Keep F at 50 Hz to limit beam loading in μ ± rings. How to provide transverse cooling at low frequency? Possibility of NFFAGs or IFFAGs instead of FFAGs?

Bunch Structure Issues 1.Change from 1 to ≤ 5 bunch trains per cycle?. 2.Use 50 Hz, 4 MW, 10 GeV Proton Driver, n=5,4,3? 3.Use proton bunch delays for low μ beam loading? 4.Compare low & high frequencies for muon stages. 5. Delay decision on μ ± acceleration for further R&D? 6. Use MHz for μ ± rotation, cooling & acceln? 7. Create trains of 80 μ + & μˉ bunches while rotating. 8.Accelerate the bunch trains singly in the μ ± rings. 9.Provide transverse cooling to give ε ≤ 30 mm rad? 10. Two rings (racetracks) needed for single detector. 11. Use two vert. Δ rings for best ξ for two detectors.