 Allocation of resources over time to accomplish specific tasks.  Scheduling is done in the short term time horizon i.e. months, weeks or days.  Effective.

Slides:



Advertisements
Similar presentations
MANAJEMEN PRODUKSI DAN OPERASI
Advertisements

Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Scheduling.
14 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Operations Planning and Scheduling Chapter 14.
Operations Scheduling
Scheduling. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material Requirements.
Short Term Scheduling Introduction What – Scheduling or timing of operations Where – Timing of operations affects the overall strategy Why – Reduce costs,
Short-Term Scheduling
Operations Management
Inputs and Outputs to Aggregate Production Planning
Scheduling. Characteristics of a “job” Constituent operations Constituent operations Due date Due date Time of arrival in shop Time of arrival in shop.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Short-Term Scheduling Chapter 15.
Scheduling.
1 ISQA 459/559 Mellie Pullman Scheduling Shop Floor.
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 16: Learning Objectives
JIT and Lean Operations
Operations Scheduling. Scheduling in a Process-Focused Environment.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
SchedulingProducingControllingSchedulingProducingControlling.
1. Facility size 2. Equipment procurement Long-term
Scheduling.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
Aggregate Planning, MRP, and Short Term Scheduling 9 Aug 2001.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
15-1Scheduling William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
1 1 Slide Short – Term Scheduling Professor Ahmadi.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
SchedulingProducingControllingSchedulingProducingControlling.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice Hall, Inc. All rights reserved. Alternatives Quarter Total.
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
Scheduling. Scheduling of Operations A planning tool for the short term  Provides an opportunity to make use of new information as we approach real time.
CHAPTER 4 : SCHEDULING Presented by: HAMKA BIN TAIP
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Chapter 16 & 9 Scheduling Work & Employees. Scheduling Outline What needs to be scheduled? –doctor’s office, restaurant, mfg. plant, hospital –employees.
Activity Scheduling and Control
0 Production and Operations Management Norman Gaither Greg Frazier Slides Prepared by John Loucks  1999 South-Western College Publishing.
Scheduling.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Scheduling.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
To Accompany Ritzman & Krajewski, Foundations of Operations Management © 2003 Prentice Hall, Inc. All rights reserved. Alternatives Quarter Total.
SchedulingProducingControllingSchedulingProducingControlling.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
15 - 1© 2014 Pearson Education, Inc. Short-Term Scheduling PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh Edition.
15 - 1© 2011 Pearson Education 15 Scheduling for the Short Term PowerPoint presentation to accompany Heizer and Render Operations Management, 10e, Global.
PRODUCTION PLANNING AND CONTROL (PPC). PLANNING CONTROL CONTROL PRODUCTION.
Inputs and Outputs to Aggregate Production Planning
PRODUCTION ACTIVITY CONTROL (PAC)
PRODUCTION ACTIVITY CONTROL (PAC)
Planning and Scheduling
Chap 11 Learning Objectives
Scheduling for the Short Term
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Manufacturing Production Planning
Inputs and Outputs to Aggregate Production Planning
Presentation transcript:

 Allocation of resources over time to accomplish specific tasks.  Scheduling is done in the short term time horizon i.e. months, weeks or days.  Effective and efficient scheduling can be a competitive advantage.

Long term Intermetiate term Short term Business Plan Determine the long-term strategies for production and capacity External environment Forecast of demand Strategies and policies Material Requirements Planning (MRP) Determine the needs for components and raw materials Aggregate Plan Determine production capacity Master Production Schedule (MPS) Determine the production schedule for specific products Scheduling Detailed planning of orders Aggregate planning Master scheduling Different Levels of Planning

› What is to be done (Work) › When (Timings) › By whom (Workers) › With what equipment. (Work Stations)

 High Efficiency  Low cost  Low inventories  Good customer service  Meeting Demand on time

 Scheduling Demand: › Scheduling customers by assigning a specific time for order fulfillment.  Scheduling Workforce: › Scheduling that determines when employees work.  Scheduling Operations: › Scheduling in which jobs are assigned to work stations or employees are assigned to jobs for specific time periods.

Forward Scheduling › The scheduler selects a planned order release date and schedules all activities from this point forward in time. › Produces a schedule though it may not meet due date. Backward Scheduling Begins with the due date and schedules the final operation first. Schedule is produced by working backwards though the processes by working backwards though the processes Due Date Now Now

 LOADING / DISPATCHING: › Involves assigning jobs to work centers and to various machines in the work centers  SEQUENCING: › Sequencing is concerned with determining the order in which jobs are processed

 Random  FCFS  EDD  SPT (Shortest Processing Time)  LWR (Least work Remaining)  FOR (Fewest operation Remaining)  ST (Slack Time)

 Gantt charts are named for Henry Gantt, a management pioneer of the early 1900s.  He proposed the use of a visual aid for loading and scheduling operations.  Most commonly used scheduling tool in the world.

Nissan Ford Pontiac Job4/204/224/234/244/254/264/214/174/184/19 Current date Start activity Finish activity Scheduled activity time Actual progress Nonproductive time

Operating Room A Workstation 7am Operating Room B Operating Room C 12 pm 8am9am10am11am1pm2pm3pm4pm5pm6pm Time Dr. Gary Case Dr. Jeff Dow Dr. Madeline Easton Dr. Dan GillespieDr. Jordanne Flowers Dr. Jon Adams Dr. Aubrey BrothersDr. Alaina Bright Figure 14.8 – Gantt Workstation Chart for Operating Rooms at a Hospital