Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule 25.505 Posting Requirements January 8,

Slides:



Advertisements
Similar presentations
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Advertisements

ERCOT Update on PUCT Posting changes DEWG Meeting 11/27/07 Matt Mereness.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
DSWG Update to WMS May 17, DSWG Goals Update.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
TPTF Presentation Registration of PUN Facilities December 19, 2007.
1 Nodal Stabilization Market Call December 28, 2010.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
NPRR 209 Presentation Adrian Pieniazek – NRG Texas Technical Advisory Committee May 6, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
1 Impact Assessment of Parking Deck NPRRs/SCRs/NOGRRs Phase 1 March 2011.
1 Impact Assessment of Parking Deck and New NPRRs/SCRs Phase 1 February 2011.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
ERS Update – DSWG Presentation September 21, 2012.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
1 TAC Report to the ERCOT Board November 14, 2006.
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Load Participation in Nodal Training Session Update DSWG December 7, 2007.
ERCOT Wholesale Market SubcommitteeJanuary 12, ERCOT Wholesale Market SubcommitteeJanuary 12, ERCOT/IMM/PUCT Proposal for Redaction of State.
Presentation to the ERCOT Technical Advisory Committee July 1, 2010.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Technical Advisory Committee Presentation to the ERCOT Board of Directors July 15, 2008.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Current FRRS Language & Explanation of Posted Data
Ancillary Service Trades and Ancillary Service Settlement
Congestion Management and Ramp Rate for Delivering Ancillary Services
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Presentation transcript:

Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8, 2008 Matt Mereness

Lead from the front Texas Nodal 2 PUCT Posting Requirements History of Rulemaking and impacts to PUCT Rule : - PUCT was adopted in August 10, Court appeal filed and emergency stay put into place to not disclose all data - PUCT adopted August 16, 2007 changed postings - September 21, 2007 Court Stay removed and all of in effect for zonal and forthcoming nodal systems (Zonal reporting has been implemented. Zonal PRRs are 697 and 752. PRR697 re- structured portions of Section1, and as such will be taken up as a separate NPRR) Steps to incorporate into nodal protocols (and ERCOT systems) - In November and December 2007, ERCOT worked with small group from Commission Staff, Independent Market Monitor, and MPs to draft NPRR to effectuate the disclosures in nodal. - Purpose today is to introduce high level overview of this requirement - Plan to complete draft NPRR and release by Jan 11 for TPTF/Market comments and detailed discussion to occur at Jan meeting.

Lead from the front Texas Nodal 3 PUCT Posting Requirements NPRR to incorporate PUCT Rule (f) into protocols PUC Substantive Rule text: (f)Publication of resource and load information in ERCOT markets. To increase the transparency of the ERCOT-administered markets, ERCOT shall post at a publicly accessible location on its website, beginning no later than October 1, 2006, the information required pursuant to this subsection, unless a different date is specified by a paragraph of this subsection. (1) The following information in aggregated form, for each settlement interval and for each area where available, shall be posted two calendar days after the day for which the information is accumulated. (A) Quantities and prices of offers for energy and each type of ancillary capacity service, in the form of supply curves. (B) Self-arranged energy and ancillary capacity services, for each type of service. (C) Actual resource output. (D) Load and resource output for all entities that dynamically schedule their resources. (E) During the operation of the market under a zonal market design, scheduled load and actual load. During the operation of the market under a nodal market design, firm scheduled load, scheduled load with “up to” limits on congestion charges, and actual load.

Lead from the front Texas Nodal 4 PUCT Posting Requirements PUC Substantive Rule text (continued): (2) During the operation of the market under a nodal market design, the following day-ahead market information in aggregate form shall be posted two calendar days after the day for which the information is accumulated: load bids, including virtual loads, in the form of day- ahead bid curves, and cleared load. (3) The following information in entity-specific form, for each settlement interval, shall be posted as specified below. (A) During the operation of the market under a zonal market design: (i) Portfolio offer curves for balancing energy and for each type of ancillary service, for each area where available, shall be posted 60 days after the day for which the information is accumulated beginning September 1, 2007, except that, for the highest-priced offer selected or dispatched by ERCOT for each interval after January 12, 2007, ERCOT shall post the offer price and the name of the entity submitting the offer 48 hours after the day for which the information is accumulated. In the event of interzonal congestion, ERCOT shall post, separately for each zone, the offer price and the name of the entity submitting the highest-priced offer selected or dispatched. (ii) If the market clearing price for energy (MCPE) or the market clearing price for capacity (MCPC) exceeds the event trigger during any interval, the portion of every market participant’s price-quantity offer pair for balancing energy service and each other ancillary service that is at or above the event trigger for that service and that interval shall be posted seven (7) days after the day for which the offer is submitted. ERCOT shall implement the requirements of this clause by September 1, 2007.

Lead from the front Texas Nodal 5 PUCT Posting Requirements PUC Substantive Rule text (continued): (iii) Other offer-specific information for each type of service and for each area where available shall be posted 90 days after the day for which the information is accumulated beginning March 1, Effective March 1, 2008, this information shall be posted 60 days after the day the information was accumulated. The information subject to this disclosure requirement is as follows: (I) final energy schedules for each QSE; (II) final ancillary services schedules for each QSE; (III) resource plans for each QSE representing a resource; (IV) actual output from each resource; and (V) all dispatch instructions from ERCOT for balancing energy and ancillary services. (iv) The information posted shall include the names of the resources in the portfolio that were committed, the name of the entity submitting the information, the name of the entity controlling each resource in the portfolio.

Lead from the front Texas Nodal 6 PUCT Posting Requirements PUC Substantive Rule text (continued): (B) Two months after the start of operation of the market under a nodal market design: (i) Offer curves (prices and quantities) for each type of ancillary service and for energy at each settlement point in the real time market, shall be posted 60 days after the day for which the information is accumulated except that, for the highest-priced offer selected or dispatched for each interval on an ERCOT-wide basis, ERCOT shall post the offer price and the name of the entity submitting the offer 48 hours after the day for which the information is accumulated. (ii) If the MCPE or the MCPC exceeds the event trigger during any interval, the portion of every market participant’s price-quantity offer pairs for balancing energy service and each other ancillary service that is at or above the event trigger for that service and that interval shall be posted seven (7) days after the day for which the offer is submitted. (iii) Other resource-specific information, as well as self-arranged energy and ancillary capacity services, and actual resource output, for each type of service and for each resource at each settlement point shall be posted 60 days after the day for which the information is accumulated. (iv) The posted information shall be linked to the name of the resource (or identified as a virtual offer), the name of the entity submitting the information, and the name of the entity controlling the resource. If there are multiple offers for the resource, ERCOT shall post the specified information for each offer for the resource, including the name of the entity submitting the offer and the name of the entity controlling the resource.

Lead from the front Texas Nodal 7 PUCT Posting Requirements PUC Substantive Rule text (continued): (C) The load and generation resource output for each zone, for each entity that dynamically schedules its resources, shall be posted 90 days after the day for which the information is accumulated beginning March 1, Effective March 1, 2008, the information required by this subparagraph shall be posted 60 days after the day for which the information is accumulated. (D) ERCOT shall use §25.502(e) of this title (relating to Pricing Safeguards in Markets Operated by the Electric Reliability Council of Texas) as a basis for determining the control of a resource and shall include this information in its market operations data system.

Lead from the front Texas Nodal 8 PUCT Posting Requirements (f)(1): Aggregated Energy and Ancillary Services offer curves Real-time Energy Offers: Propose separate postings of - Resource Energy Offers, - Resources without Energy Offer Curves (Output Schedules, DSR & non-DSR), - Wind Resource Energy Offer Curves

Lead from the front Texas Nodal 9 PUCT Posting Requirements (f)(1): Aggregated Energy and Ancillary Services offer curves Real-time Energy Offers: Propose separate postings of - Resource Energy Offers, - Resources without Energy Offer Curves (Output Schedules, DSR & non-DSR), - Wind Resource Energy Offer Curves

Lead from the front Texas Nodal 10 PUCT Posting Requirements (f)(1): Aggregated Energy and Ancillary Services offer curves Real-time Energy Offers: Propose separate postings of - Resource Energy Offers, - Resources without Energy Offer Curves (Output Schedules, DSR & non-DSR), - Wind Resource Energy Offer Curves

Lead from the front Texas Nodal 11 PUCT Posting Requirements (f)(1): Aggregated Energy and Ancillary Services offer curves Day Ahead Market Energy Offers:

Lead from the front Texas Nodal 12 PUCT Posting Requirements (f)(1): Aggregated Energy and Ancillary Services offer curves Ancillary Service Offers: - Regulation- combined Generation and Controllable Load (CLR) offer stack - Responsive- separate disclosure of the Gen/CLR and UFR offer stacks for 1150MW limit. - Non-Spin- all Gen and Load Resources combined in posting

Lead from the front Texas Nodal 13 PUCT Posting Requirements (f)(2): Aggregated DAM bid curves DAM Load bid curve:

Lead from the front Texas Nodal 14 PUCT Posting Requirements Additional considerations during comment period: Posting by 10MW increments for energy data: Question: Is this an appropriate balance of detail? Posting by area versus system-wide: Question: Interpretation is to proceed as system-wide disclosure, rather than by Load Zone (or a 2003 CMZ proxy) (f)(1)(E): Load information “During the operation of the market under a nodal market design, firm scheduled load, scheduled load with “up to” limits on congestion charges, and actual load.” Question: What does the disclosure of “firm scheduled load” look like in the nodal market? And does “up-to” limit imply bids for PtP Obligations? (f)(3)(A)(iii): Other Resource-specific information… Question of interpretation- consider as interpreted to mean: Resource Status, HSL, HASL, HDL, LDL, LASL, LSL, any text reason entered for the HSL being greater than or less than the Resource’s Net Dependable Capability, actual net MW telemetry used in SCED and the Ancillary Service Resource Responsibility for each Ancillary Service

Lead from the front Texas Nodal 15 PUCT Posting Requirements Next steps: Submit draft NPRR for review and comments through the TPTF Review mailbox by January 11 for market comments. TPTF detailed discussion and consideration at January meeting