CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.

Slides:



Advertisements
Similar presentations
2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
Advertisements

Dissertation guidelines for: BA/BSc Geography and Environment BSc Environmental Management & BSc Environmental Science
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
1 Course Schedule Spring 2006 Exam 1 February 2006 Project Introduction(5pages)3/24/06 Project Testing 3/24-4/15 Exam 2 4/11/06 Presentation instructions:
1 Course Schedule Spring 2007 Exam 1 October 2007 Project Introduction(5pages)Oct – Nov Exam 2 November 2007 Project Testing Nov 26 - Dec4 Last Homework.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Software Engineer Report What should contains the report?!
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
5 th CLIC X-band collaboration meetingWalter Wuensch16 May 2011 CLIC rf structure program.
1 Welcome to all Outline: CDR status planning information information still needed Goals of meeting and practical information.
John Carwardine 1 TDR Editorial WG Summary Global Design Effort John Carwardine.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
More on work-packages Reminder: We have and continue to elaborate the WPs (reminder next slide) We have talked about main activities and CASC (reminder.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Introduction / CLICdp news (CLICdp - CLIC detector and physics) -- CLICdp meeting at AWLC14, 13 May Konrad Elsener, CLICdp session, AWLC14 1 Konrad.
Agenda : CLIC Civil Engineering and Services (CES) WG.
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.
1 Tunnel implementations (laser straight) Central Injector complex.
Current CLIC Energy Stages D. Schulte1. Main Beam Generation Complex Drive Beam Generation Complex Layout at 3 TeV D. Schulte2.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
NLC Status and Milestones D. L. Burke ISG9 KEK December 10-13, 2002.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
General news, future LC organisation, update on CDR Vol3… Lucie Linssen L. Linssen, CLIC physics and detector monthly meeting, May 14th
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
H.Schmickler, 4th ACE meeting May 2009 Update on CDR issues; Organization of technical work towards CDR 1.CDR vs TDR 2.CDR schedule 3.Highest priority.
Considerations for the CDR and Strategy Update The current CDR planning focuses on 3 TeV and a downscaled not optimised 500 GeV machine, aiming for completion.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Questions from the CLIC accelerator team (D. Schulte, LCD “monthly” 25 Feb. 2013) -> a first attempt to answers 1 25 March 2013.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
CLIC 23 rd Project Meeting: news and updates Philip Burrows John Adams Institute Oxford University 1.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
CLIC Organogram CLIC Collab. Board L.Rivkin MoU with annexes describing coll. efforts (note: in reality more complicated) CLIC SC (Stapnes) Repr. from.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
REMIT Document – main elements (approved in March Council week) As mentioned, the remit of the ESG is to establish a proposal for an Update of the medium.
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
LHCbComputing Update of LHC experiments Computing & Software Models Selection of slides from last week’s GDB
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
CLIC work program and milestones
CDR The CLIC CDR is now completed. The three volumes can be found as follows:      Volume 1:       Volume 2: 
Input to Strategy currently planned
Adrian Bevan, Dave Brown, Marco Ciuchini, and Achille Stocchi
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Introduction to the Workshop
Collaboration New collaborators in 2016:
CLIC: from 380 GeV up to 3 TeV Will also study klystron based machine for initial stage.
CLIC Civil Engineering Update
Francesco Forti University and INFN, Pisa
Technical Design Report preparation
The DBD: Outline and Scope
A High Intensity Neutrino Oscillation Facility in Europe
Summary of Washington DOE Review
Update on the JLEIC pCDR
Presentation transcript:

CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010

 Volume 2 CDR in 3 volumes: 1: Executive summary 2: Accelerator and site facilities 3: Physics and Detectors Volume 1 (some 40 pages) will be written after almost completion of volume 2 and 3 (spring 2011) Volume 3 was covered by Marcel Stanitzki This talk is on volume 2:

Outline Volume 2 outline CDR Timescale & Strategy Baseline review in Spring 2010 Present state of document

Layout of Volume 2 1) Overview of the CLIC concept; Details on CLIC feasibility demonstration 2) Accelerator Physics description of the Main Beam Complex 3) Accelerator Physics description of the Drive Beam Complex 4) Preliminary design of a 500 GeV intermediate stage 5) Detailed description of the accelerator components 6) Civil Engineering and Services 7) CLIC technologies demonstrated in CTF3 8) Construction and Operational Scenarios 9) Energy Scanning 10) Detailed value estimate 3 TeV Specifications

The CDR is based on the CLIC 3 TeV option as baseline for the optimization of the parameters (single step construction). Implications of Construction staging starting from the lowest demanded energy as indicated by LHC results (500 Gev) up to the full 3 TeV machine described in separate chapter. Parameter changes and optimization for this “500 GeV” machine plus additional consequences for later energy upgrades in the same chapter. Total power consumption; discussion of various scenarios from highest possible energy/luminosity to intermediate proposals in a specific chapter of volume 2 Energy scanning: For the two construction stages (500 GeV and 3TeV) a presentation of the expected performance and optimised running scenarios for an energy variation of at least a factor two again as separate chapter of volume 2. CTF3 results: CLIC technologies as demonstrated by CTF3 experiments will be highlighted in a separate chapter General Comments for volume 2:

Time Scale …as shown last workshop Time-Scale: - author lists, general information letter: February Publication of changes to CLIC baseline: End March Progressive redaction: April 2010 – late summer First draft of CDR (vol 1&2): LC workshop at CERN in October Almost complete draft Vol 2 for CERN SPC in December Final CDR: Spring 2011  May 2010 Done, needs to be finished Started in September I will show what we have Probably not Yes, April 2011 we want Volume 2 to be finished

People involved - management of author-lists: A.Augier(CERN), M.Draper (CERN) - final Latex processing: M.Draper(CERN), D.Manglunki (CERN), H.Schmickler (CERN) -intl. editorial board: N.Phinney (SLAC), N.Toge (KEK), P.Lebrun(CERN), H.Schmickler(CERN) -- authors: i) responsible author: responsible for submission in time ii) contributing author: active contribution to write-up iii) supporting author: “signing-up” through a web-portal as CDR author present layout: about 50 responsible authors, mainly CERN, plus another large number of contributing authors from Collaborations/CERN

CDR website Contains: 1) a dryrun (12 submissions from summer for tests of software and as reading material for authors) 2) the CDR skeleton (breakdown of document in 4 levels) 3) a regularly updated draft version of the CDR 4) a full table of the expected contributions and a link to preliminary material provided by the authors

Baseline parameter Review (1/5)

Baseline parameter Review 5.6m

Baseline parameter Review 3.5m

Baseline parameter Review Still in work

What next? Close parameter baseline for CDR Give authors time to write now Contribution chasing will start in November after LC school Need 3 months for editing April 2011 is still a sensible deadline for final draft of volume 2