P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.

Slides:



Advertisements
Similar presentations
CLIC drive beam accelerating (DBA) structure Rolf Wegner.
Advertisements

1 Bates XFEL Linac and Bunch Compressor Dynamics 1. Linac Layout and General Beam Parameter 2. Bunch Compressor –System Details (RF, Magnet Chicane) –Linear.
1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Frank Tecker CTF3 Committee Last two months’ chronology Wed 23/03:first beam to end of TL1 Mon 28/03:beam to CR + factor 4 combination Thu 31/03:“near.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
CTF3 ORBIT : TOOLS AND AUTOMATIC TUNING Davide Gamba 4 February 2014 CLIC Workshop CERN.
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
Influence of the Third Harmonic Module on the Beam Size Maria Kuhn University of Hamburg Bachelor Thesis Presentation.
Drive Beam Linac Stability Issues Avni AKSOY Ankara University.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
B EAM STEERING EXPERIENCE AT CTF3 Davide Gamba 14 June 2014 Americas Workshop on Linear Colliders Fermilab.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
Drive Beam Status and Issues Drive beam quality Dispersion tuning Emittance Combination issues Piotr Skowroński Ben Constance Javier Barranco … 10 October.
Luminosity expectations for the first years of CLIC operation CTC MJ.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
Optics considerations for ERL test facilities Bruno Muratori ASTeC Daresbury Laboratory (M. Bowler, C. Gerth, F. Hannon, H. Owen, B. Shepherd, S. Smith,
DEVELOPMENT OF A BEAM LOSS DETECTION SYSTEM FOR THE CLIC TEST FACILITY 3 T. Lefevre Beam loss monitors for the CLIC Test Facility 3 Preliminary study done.
Beam breakup and emittance growth in CLIC drive beam TW buncher Hamed Shaker School of Particles and Accelerators, IPM.
1 General Status of Commissioning Piotr Krzysztof Skowroński CTF3 Collaboration Technical Meeting 27 January 2009.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
R. Corsini, CTF3 results in /2/2011 CLIC MEETING 1 CTF3 Experimental results in 2010 R. Corsini for the CTF3 Team.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Oleksiy Kononenko CERN and JINR
Main and Drive Beam Dynamics Working Group Caterina Biscari, Daniel Schulte Attending people ~ 20 ± 5 Presentations ~ 18 (7 from CERN) CL IC 07.
Tools in CTF3 Simona Bettoni for the CTF3 operation team.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
Feasibility and R&D Needed For A TeV Class HEP e+e- Collider Based on AWA Technology Chunguang Jing for Accelerator R&D Group, HEP Division, ANL Aug
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, CERN, Geneva, Switzerland CLIC DRIVE BEAM FREQUENCY MULTIPLICATION.
CLIC Frequency Multiplication System aka Combiner Rings Piotr Skowronski Caterina Biscari Javier Barranco 21 Oct IWLC 2010.
CLIC 09 Workshop - C. Biscari C. Biscari, D. Alesini, A. Ghigo, F. Marcellini, LNF-INFN, Frascati, Italy B. Jeanneret, F. Stulle, CERN, Geneva, Switzerland.
Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
First Year of Operation at the Two-beam Test Stand
Sara Thorin, MAX IV Laboratory
Steering algorithm experience at CTF3
Linac4 Beam Characteristics
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Status of the CLIC main beam injectors
Have a chance to operate your own beam at CERN
Longitudinal Diagnostics for start-up
Measurements, ideas, curiosities
SuperB project. Injection scheme design status
12 GeV CEBAF.
R. Bartolini Diamond Light Source Ltd
Electron Source Configuration
CEPC Injector Damping Ring
Linac/BC1 Commissioning P
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Linac Diagnostics Commissioning Experience
Presentation transcript:

P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay Loop  Commissioning of the Transfer Line 1 & injection into the Combiner Ring  Long pulse, fully beam loaded Linac operation

P. Urschütz - CTF3 Collaboration Meeting 2007 Missing instrumentation: only 6 Beam Pickups installed out of 17 (one in CT line, 5 in DL) Beam limited to low current (1 A), short pulse (300 ns) because of radiation protection reasons Only one SHB cavity available out of three Relaxed optics in Delay Loop (non-isochronous) (2 combined function magnets are wrongly installed… new optics for DL, 3 DL quadrupole families had calibration error) Commissioning status at the end of 2005… … and plans for 2006 Additional Instrumentation: more Pickups (+ 2 BPIs in DL) Re-combination with nominal beam current (3.5 A), long beam pulse (1400 ns) Sub harmonic bunching with all 3 SHB cavities Isochronous optics Measurement of satellite bunch population, time of phase switch in SHBs Dispersion measurements in DL, bunch length measurements,… Delay Loop commissioning

P. Urschütz - CTF3 Collaboration Meeting 2007 How does the bunch frequency multiplication work? CTF3 Injector with 3 SHB cavities (1.5 GHz) Beam combination with transverse RF deflector Phase coding and bunch frequency multiplication in delay loop “phase coding” SHB gun buncher 2 accelerating structures

P. Urschütz - CTF3 Collaboration Meeting 2007 Commissioning of the Delay Loop – SHB system Key parameters for the SHB system: 1) time for phase switch < 10 ns ( GHz periods) 2) satellite bunch population < 7 % (particles captured in 3 GHz RF buckets) phase switch: satellite bunch population: Phase switch is done within eight 1.5 GHz periods (<6 ns). Satellite bunch population was estimated to ~8 %. main bunch satellite bunch

P. Urschütz - CTF3 Collaboration Meeting 2007 Delay Loop, path length tuning I DL wiggler has path length tuning range of ~ 9 mm RF phase monitor* after the DL to measure phase error in the RF bunch combination. (*Uppsala University - talk this afternoon by A. Ferrari) 9 GHz e-e- 7.5 GHz 12 GHz 10.5 GHz RF antenna RF Bandpass filter Diodes measure harmonics of 1.5 GHz

P. Urschütz - CTF3 Collaboration Meeting 2007 Wiggler off Wiggler on Bunch from the linac Bunches from the DL Bunches from the DL later by 12ps (3.6mm) OTR light downstream the Delay Loop Better RF combination 7.5 & 10.5GHz 9 & 12 GHz Delay Loop, path length tuning II Thanks to our BDI guys T.Lefevre, C.Welsch 333 ps

P. Urschütz - CTF3 Collaboration Meeting 2007 Dispersion measurements I o measure reference trajectory at nominal magnet settings o scale magnets by small amount (~1%) o CT Line o Delay Loop o observe difference trajectory o E = 101 MeV Linac + CT Line Delay Loop magnetic chicane

P. Urschütz - CTF3 Collaboration Meeting 2007 Dispersion measurements II o In general good agreement between model and measurement o worse in the second half of DL; wiggler or combined function magnet mismatch ? o overall, data for lower currents fits better. o We do not have many BPIs!

P. Urschütz - CTF3 Collaboration Meeting 2007 Bunch Length measurements – streak camera MTV0361  = 8.9ps (2.7 mm) “Natural” chicane - R56 = 0.45 MTV0550  = 4.5ps (1.4 mm) “Nominal” chicane - R56 = bunch length <1.3 mm in the Linac (obtained with cleaning chicane after the injector) head-to –tail energy correlation is introduced in the accelerator (off crest acceleration & short range wake fields) magnetic chicane to increase the bunch length before the Delay Loop (up to 2.5 mm) to minimise CSR effects. measured bunch lengths are very reasonable and change of R56 clearly visible. head-to–tail energy correlation after the Linac was not the main focus so far (on-crest acceleration). good agreement to simulations with reasonable initial energy correlation.

P. Urschütz - CTF3 Collaboration Meeting Beam recombination in the Delay Loop (factor 2) Beam recombination NOMINAL BEAM PARAMETERS ? Beam current (7 A after DL) 3.3 A max after chicane -  6 A after combination (satellites) Energy (150 MeV) ~ 100 MeV – still miss MKS 15 – can gain something from others Emittance (100 π mm mrad) now consistently below nominal (  mm mrad) Pulse length (1.4 µs) “just” nominal (1.4  s after chicane, 5  140 ns pulses after DL) Bunch length (up to 2.5 mm) 1.4 – 2.7 mm (nominal and natural R56 of chicane), head-to-tail energy correlation of the bunch after the Linac?

P. Urschütz - CTF3 Collaboration Meeting 2007 Commissioning of TL1 & CRM Delay Loop - commissioned with beam Linac - commissioned with beam CRM commissioning – end of 2006 TL1 DL CRM Bypassing the Delay Loop low gun repetition rate (1 Hz) No sub harmonic bunchers - 3 GHz beam beam current: 3.5 A short pulse length: ~ 200 ns one additional Klystron (MKS15), higher energy: ~ 125 MeV Just 3 weeks of commissioning – effective 80 hours!

P. Urschütz - CTF3 Collaboration Meeting 2007 Transmission in TL1 & CRM o 3.2A at the end of CT line. o About 3A after injection into CR (94%). o Magnetic and RF injection (with same transmission). o Nominal, isochronous optics in TL1

P. Urschütz - CTF3 Collaboration Meeting 2007 Transmission & trajectory in TL1 & CRM TL 1 CRM CT Transmission and trajectories from end of CT line to CRM Beam image at the end of CRM.

P. Urschütz - CTF3 Collaboration Meeting 2007 Dispersion measurements in TL1 & CRM TL 1 CRM Dispersion measurement by magnet scaling within +/- 1% (QFF0690 optimized for zero disp) Nominal, isochronous optics in TL1 and we are asking for zero dispersion in CRM. But in operation: non zero dispersion measured in CRM… we always had to change one quadrupole to compensate. Good agreement for the first part of TL1, discrepancy afterwards. Drift of the machine, Energy was changing QFF0690 o quadrupole: wrong magnetic field (short in one of the coils). o model: Is it correct? Kick studies with steerers to better understand this discrepancy (to be analysed).

P. Urschütz - CTF3 Collaboration Meeting 2007 Matching of TL1 & CRM o Quad scan at the end of CT line. o Matching of TL1 and CRM. o Quad scan at the end of CRM. Emittances (ε n,rms ) in x and y plane between 40 – 80 π mm mrad (nominal 100 π mm mrad) at the end of CT line and CRM! Twiss parameters from measurement and MAD prediction disagree (same problem than for dispersion). What else did we do? o Streak camera studies … talk this afternoon (Carsten Welsch) o Bunch length monitor studies (RF pick up) … talk this afternoon (Mayda Velasco, Anne Dabrowski)

P. Urschütz - CTF3 Collaboration Meeting 2007 Most of RF power to the beam RF in No RF to load “short” structure - low Ohmic losses High beam current Fully beam loading operation in CTF3 SiC load HOM damping slot CTF3 Drive Beam Acc. Structures (3 GHz) – SICA (Slotted Iris – Constant Aperture): 32 cells 1.2 m long 2π/3 mode 6.5 MV/m av. acc. gradient for 3.5 A beam current HOM damping slots theoretical RF-to-beam efficiency: 96%

P. Urschütz - CTF3 Collaboration Meeting 2007 Full beam loading operation in CTF3 – Demonstration for CLIC operation CLIC: no RF pulse compression length of the drive beam pulse: 100 µs Demonstration at CTF3: MKS03 MKS07 MKS06 MKS05 Spectrometer 10 Spectrometer 4 Setup: no RF pulse compression for this experiment (with exception of MKS03) 1.5 µs long pulses Adjust RF power and phase and beam current, that fully loaded condition is fulfilled RF pulse at structure output RF pulse at structure input analog signal 1.5 µs beam pulse

P. Urschütz - CTF3 Collaboration Meeting 2007 Full beam loading operation in CTF3 – Demonstration for CLIC operation measured RF-to-beam efficiency: 95.3 % Theory: 96% (~4 % ohmic losses) Idea: Delay always one klystron pulse after the beam pulse and measure relative energy in spectrometer 10 and compare with calculations. MKS05MKS06MKS07 in outin total energy lower energy from calculations (beam current) o “missing” acceleration (energy gain per structure) o deceleration due to direct beam loading compare to theoretical energy gain (input power, beam current) An exact knowledge of the structure input power, the beam current and the energy gain is essential.

P. Urschütz - CTF3 Collaboration Meeting 2007 Conclusions Delay Loop:  Fully commissioned with “quasi” nominal parameters (6A re-combined beam current, 1.4 µs pulse length, ε n,rms < 100 π mm mrad, tunable bunch length ~ 2mm)  3 SHB operational, phase switch time < 6 ns, satellite bunches < 8% TL1 & CRM:  very good transmission until the beam dump  magnetic and RF injection into CRM  small emittances  made important studies with several BDI equipment  but, a better understanding of dispersion and optics has to be obtained Fully beam loaded operation:  very successful demonstration of the long pulse fully loaded operation with an measured RF-to–beam efficiency of 95.3%. within short time: Thanks to everybody participating in the commissioning and operation of CTF3 during the 2006 run!