Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business.

Slides:



Advertisements
Similar presentations
Run 15 RHIC Machine/Experiments Meeting 7 Apr 2015 Agenda: Run 15 Schedule (Pile)
Advertisements

Note: most of the slides shown here are picked from CERN accelerator workshops. Please refer to those workshop for further understanding of the accelerator.
Run 14 RHIC Machine/Experiments Meeting 27 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run 9 polarized proton Log 9 Jan begin 45 degree cool down from room temp (3 MW-NEW) 2 Feb, Cool-down to 4.5 degrees begins 5 Feb, Blue ring cold but still.
RUN 12 RHIC MACHINE/EXPERIMENTS MEETING 18 October 2011 (1 st meeting) Agenda: Schedule issues (Pile) Machine Status (Fischer) STAR Readiness PHENIX Readiness.
RHIC Status Haixin Huang Time Meeting 02/1/2011. Jan. 26 Ring access for six hours to fix jet and many other jobs. Difficulty to provide 28X28 store overnight.
1 RHIC Run-7 Au-Au Operation A. Drees APEX workshop, Nov 2 nd 2006 Run organization Previous run and expectation for Run7 Start-Up plan Problem areas.
Run 12 RHIC Machine/Experiments Meeting 3 Jan 2012 (4 th meeting) Agenda: Run 12 Priorities.
Run 12 RHIC Machine/Experiments Meeting 24 Jan 2012 (5 th meeting) Agenda: G  for 100 GeV pp run 100 GeV pp Lumi Goals Power Update.
Run 11 as run 3 Jan, Begin cool-down to 4.5K 8 Jan, Cool-down to 4.5K complete in both rings, preliminary setup begins 24 Jan, 1 week Ramp-up with 8 hr/night.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 5 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 29 Jun 2012 Run 12 Summary Slides.
F UEC - 6 Oct 06 Recent FNAL Collider Operations Ron Moore Fermilab – Tevatron Dept.
1 Near-term machine performance — The next 5 years, before e-cooling — Wolfram Fischer Run Coordinator for RHIC Run-4 Open Meeting on RHIC Planning Berkner.
Run 13 RHIC Machine/Experiments Meeting 21 May 2013 Agenda: Status Reports.
Run 13 RHIC Machine/Experiments Meeting 4 Jun 2013 Agenda: Status Reports Hydrogen Jet issue (Eyser)
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
1 RHIC Machine/Detector Planning Meeting 9 May 06 Agenda –SPECIAL TOPICS: Schedule for the 62 GeV pp run What is preferred order of beam species for RUN07?
Run 15 RHIC Machine/Experiments Meeting 30 Sep 2015 Run 15 Summary Slides 1.
15 May 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Experiment Issues PHENIX (Leitch) STAR (Christie) Monopole.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Dec 27) – Dec. 1, Begin cooldown to 4.5K – Dec. 4, Cooldown to.
Experimental background at the presence of pressure rise in RHIC Angelika Drees, Ubaldo Iriso-Ariz RHIC How to measure collision rates Vacuum and collision.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
Run 14 RHIC Machine/Experiments Meeting 1 July 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
Run 14 RHIC Machine/Experiments Meeting 3 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
General Status of STAR pp run as of June 1, pb -1 delivered ~1.78 pb -1 sampled 292 nb -1 delivered ~ 93 nb -1 sampled (93/180 ~ 52%) N.B
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 12 Apr 2011 Agenda: Open.
Run 12 RHIC Machine/Experiments Meeting 28 Feb 2012 Agenda: Discussion - when to end the 200 GeV pp run… presently scheduled to end early Friday morning,
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Mar 2011 Agenda: Status – cryo/budget Experiment priorities.
Run 13 RHIC Machine/Experiments Meeting 9 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited again.
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
RHIC Run11 Summary May 6, 2011 RSC Meeting Haixin Huang Luminosity Availability Polarization RHIC setup issues.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
27 Mar 071 RHIC Machine/Detector Planning Meeting Agenda –Scheduling Physicist Issues (Gardner) –Machine Issues - (Drees) –Experiment Issues PHENIX (Leitch)
Run 12 RHIC Machine/Experiments Meeting 7 Dec 2011 (3 rd meeting) Agenda: Run 12 Priorities.
26 May 2015 Run 15, Time Meeting Agenda: Take 5 for safety E. Lessard Schedule P. Pile Linac Status D. Raparia AGS Status V. Schoefer Cryo Status R. Than.
Run 12 RHIC Machine/Experiments Meeting 17 Apr 2012 Agenda: Status reports Polarization issues update (E. Aschenauer) Other business With 17 April update.
Feb. 23, 2005Wednesday Experiment Meeting BNL, Upton Status on AGS cold snake  Cold mass is now in the cryostat. It is in the phase of wiring, and because.
POLARIZATION MEASUREMENTS AND ABSOLUTE POLARIZATION VALUES EVOLUTION DURING PROTON BEAM ACCELERATION IN THE RHIC ACCELERATOR COMPLEX A.Zelenski, T.Roser,
Run 16 RHIC Machine/Experiments Meeting 5 Jan 2016 Agenda: Run 16 Schedule (Pile) AuAu Run Plan (Gu) Projections for deuteron-gold energy scan (Liu) STAR.
Nuclear Phase Transition Diagram Mar RHIC Monday Meeting T. Satogata DOE NSAC Long Range Plan … a whole page! (one out of 14)
RHIC Run14 Time Meeting. Run14 Status – May 27 Operations running well, 11 full stores over the past 7 days. Getting high intensity again from injectors,
RHIC Run14 Time Meeting. Run14 Status – June 24 Run14 He3-Au physics declared on 6/20 with Fill #18460; stochastic cooling is ON for Au beam, longitudinal.
Run 14 RHIC Machine/Experiments Meeting 6 May 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
1 RHIC II – Ion Operation Wolfram Fischer RHIC II Workshop, BNL – Working Group: Equation of State 27 April 2005.
1 Machine issues for RHIC II Wolfram Fischer PANIC Satellite Meeting – New Frontiers at RHIC 30 October 2005.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Run 10 Start-up Status
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 7 Jun 2011 Agenda: √s = 200 GeV AuAu progress 27 GeV Run (or other)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 31 May 2011 Agenda: √s = 200 GeV AuAu progress Update on 250 GeV integrated Lumi.
Time Meeting March 29, W. Christie Blue Ring Magnet String issue: -on Friday morning 7am (18 March 2016) a problem developed in the RHIC Blue ring.
Run 13 RHIC Machine/Experiments Meeting 2 April 2013 Agenda: Status Reports Lumi as determined from ZDC’s revisited (A. Dress)
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 14 Jun 2011 Agenda: √s = 200 GeV AuAu progress ZDC Calibration for AnDY – the plan Request from AnDY √s = 27 GeV.
STAR Summary for 2012 pp running May 11, 2012 Bill Christie, BNL Outline Summary of 200 GeV pp run Summary of 510 GeV pp run STAR’s running efficiency.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 29 Mar 2011 Agenda: Open.
RUN 11 RHIC MACHINE/EXPERIMENTS MEETING 22 Mar 2011 Agenda: Open.
Run 16 plan based on 20 weeks cryo operation and Fischer et.al. RHIC Collider Projections (FY 2016 – FY 2022), 19 April 2015 Today, 1 March 19 Jan, Begin.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
Run 10 plan based on 25 Nov Revised Plan and  s=200 extended by 1 week Dec. 1, Begin cool down to 4.5K Dec. 4, Cooldown to 4.5K complete in both rings!
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
Run 16 RHIC Machine/Experiments Meeting March 1, 2016 Agenda: Run 16 Power use/cost (Christie) Short presentation by PHENIX (Denis Jouan) AOB READYTALK.
RHIC Status Haixin Huang Time Meeting 01/25/2011.
Run 12 RHIC Machine/Experiments Meeting 6 Mar 2012 Agenda: Status reports Other business.
Run 14 RHIC Machine/Experiments Meeting 24 June 2014 Agenda: Run 14 Schedule (Pile) Machine Status (Robert-Demolaize) STAR and PHENIX Status (Experiments)
Run16 Y. Akiba.
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

Run 12 RHIC Machine/Experiments Meeting 24 Apr 2012 Agenda: Status reports Other business

Run 12 Plan based on 20 weeks cryo operation 23 week schedule based on 4/10/12 Vigdor guidance 17 Jan, Begin cool-down to 4.5K 20 Jan, Cool-down to 4.5K in Blue and Yellow Ring complete, begin magnet setup Jan, pp injection setup 28 Jan-3 Feb, LLRF, Ramp and store setup, begin 8 hr/night for experiments 3-10 Feb, 1 week ramp-up with 8 hrs/night for experiments 10 Feb, with store # 16397, begin 4 weeks pp physics with further ramp-up 16 Feb, 24/7 stores begin 12 (Monday) March, end 4.4 weeks √s = 200 GeV pp, begin ½ week setup for √s = 510 GeV pp 16 March, begin 5 week pp physics (machine only) √s = 510 GeV 17/18 March, STAR/PHENIX physics start with longitudal polarization 18 April (Wednesday 1300), end physics begin pp beam development/APEX 19 April (Thursday, 0800), end 4.9 week pp physics run at √s = 510 GeV Uranium-Uranium/Cu-Au/Au-Au plan (subject to change) STAR request for ~2 day √s = 5 GeV/n AuAu development run is pending 19 April (Thursday), begin 1 week setup for UU 22 April (evening) first overnight stores for experiments Today – 24 April 26 April (Thursday), begin 3 week UU physics run 17 May (Thursday) end 3 week √s = 193 GeV/n UU run, begin setup for √s = 200 GeV/n CuAu 19 May (Saturday – my ambitious estimate) begin CuAu physics run May: IPAC 25 June (Monday), end 5.3 week √s = 200 GeV/n CuAu run, begin cryo warm-up 28 June, cryo warm-up complete (23.3 cryo-weeks) Total Physics Weeks = 17.6

Thru final store, 16735, 18 Apr PHENIX Goal STAR Goal

Blue weighted average = 50.3% ± 0.5% Yellow weighted average = 53.4% ± 0.5% average = 78.7% Blue beam at injection jet target result = ? %

Minimum goal after 4 weeks of physics operations for UU in RHIC  6 x 10 8 ions/bunch with above U-U parameters

~6 x 10 8 ions/bunch ~3 x 10 8 ions/bunch ~8.5 x 10 8 ions/bunch Best to date = 2 x 10 8 ions/bunch

ion intensity minimum 111x6x10 8 ion intensity maximum 111x8.5x10 8 Transverse emittance projection 84/84bunches – 2.0/1.7 x 10 8 U/bunch Setup Store, no rebucketing yet… 23 April 2012

Other Slides

Where we are with Uranium (From K. Zeno) Into the booster 8 x 10^8 in 4 bunches These are then combined into one bunch Booster extraction 6.5 x 10^8 / bunch 30% efficiency into the AGS AGS extraction is at 2 x 10^8 / bunch Desired (Wolfram) ~ 7 x 10^8 / bunch >>> 6 x 10^8 / bunch in RHIC 17 April 2012

√s = 193 GeV/n UU – stores through Setup Stores, no rebucketing yet…

As of 16 Apr 2012

$ in BNL Balanced Billing Bank for FY12 (through Feb) = +$1,825K $30/MWhr

4 Apr – 10 Apr stores

STAR Goal for 5 weeks longitudal polarization (50% polarization): Sampled Luminosity = 45 pb -1 with 50% polarization Delivered Luminosity = 75 pb -1 PHENIX Goal for 5 weeks longitudal polarization (50% polarization): Sampled Luminosity = 30 pb -1 with |z| <30 cm = 10 pb -1 with |z| <10 cm Delivered Luminosity = 75 pb -1 changed to 120 pb -1, 3/29/12, Ed O’Brien Run 12, √s = 510 GeV polarized proton run – experiment goals

27 Mar – 3 Apr stores

Store 16632, Blue jet = /- 3.0; Yellow jet = /- 3.1 Best average polarization measured by jet for store > 8 hrs

Store Average lumi goal Peak lumi goal

Store 16618, Blue jet = /- 3.2; Yellow jet = /- 3.3 Worst average polarization measured by jet for store > 8 hrs

Store 16618

Store 16587, Blue jet = /- 2.8; Yellow jet = /- 2.9 Next to worst average polarization measured by jet for store > 8 hrs

Store 16587

Store 16667, Blue jet = /- 2.9; Yellow jet = /- 3.1 Second best average polarization measured by jet for store > 8 hrs

Store Average lumi goal Peak lumi goal

Table2: Max lumi parameters: 1.65x10 9 /bunch, 0.6  *, mmmr emitt  peak = 200x10 30 cm -2 s -1 Average lumi goal Peak lumi goal Store 16632, 3/27/12

23 Mar – 27 Mar stores

All “physics” stores beginning with16570, 15 March ~L store avg Goal

From “StoreAnalysis” program in “StartUp” Polarization Goal

Expectation for 5 weeks physics: pb -1 delivered luminosity with 45-50% polarization P 4 L ~ 4 pb -1

STAR & PHENIX Goal

Blue Jet weighted average = 61.2% ± 0.5%;source blue average = 77.5%  20% lost Yellow Jet weighted average = 55.8% ± 0.5%;source yellow average = 77.4%  28% lost STAR & PHENIX Polarization Goals Offline polarization is larger

Target (max projection) Best stores, and 16534

Fill 16475, 27 Feb, 8.9 hours physics store (10 hour Lumi on Store), PHENIX 1.03 pb -1

beginning end

Fill 16475, 27 Feb, 8.9 hours physics store (10 hour Lumi on Store), PHENIX 1.03 pb -1 beginning end

Fill 16534, 9 Mar, 8.1 hours physics store (9.1 hr Lumi on store), PHENIX 1.04 pb -1

Beginning End

Fill 16534, 9 Mar, 8.1 hours physics store (9.1 hr Lumi on store), PHENIX 1.04 pb -1 Beginning End

L average (max) (0.29 mb xsection) Ions/bunch (max) Past Week

Run 12 Physics Stores to 28 Feb L average (max) (0.29 mb xsection) Absolute scale should not be trusted)

Store (27 Feb) – typical background issues PHENIXSTAR ZDC Singles Protons/bunch ZDC without and with singles correction ZDC without and with singles correction

Store (27 Feb) – typical background issues

Collision steering corrections background issues Feb ZDC Coincidence ZDC Singles

L store average (max) L peak (max) Example -- Store 16445, Sat Feb 18

Blue Jet weighted average = 55.4 ± 0.5 Yellow Jet weighted average = 54.9 ± 0.5

Run 12 projection for √s = 200 GeV pp From Fischer et. Al. “RHIC Collider Projections (FY 2012 – FY 2016)” 14 October 2011 STAR Goal: 27 pb-1 delivered with % polarization PHENIX Goal: 27 pb-1 delivered with % polarization p 2 L = 8.2 pb -1 for 55% polarization

First Physics Store (#16397, 04:01, 10 Feb)

Today, 7 Feb 2012

Typical Store from Run 9, 100 x 100 GeV pp

Start cooldown As of 16:18 hrs 20 Jan 3.5 days

Wolfram Fischer 64 For Run 12 the PAC recommends the following (in order of priority): 5 weeks of running with polarized proton collisions at 200 GeV. 7 weeks of running with polarized proton collisions at 500 GeV. 5 weeks of running with Cu+Au collisions at 200 GeV. 3 weeks of running with U+U collisions at 193 GeV. For Run13 the PAC recommends the following (not in order of priority): 12 weeks of running with polarized proton collisions at 500 GeV. 5 week of running with polarized proton collisions at 200 GeV. 7 weeks of running with Au+Au collisions at full energy. Recommendations following the June 6-8, 2011 PAC

D.L. November 23, 2011 update Our helium supplier no longer able to meet our peek demand of 4 trailers in a one week period. They can give us one trailer a week starting on December 31st, so we expect to have all the helium we need, on time, but we will have to store most of it in the dewars outside 1006B. This will result in our 4K cooldown being a little less stable and predictable than it has been for the past few years when we received all of the helium at 1005R over a short period of time. Because of this, I expect the 4K cooldown will take a least one additional day. Cryo Issue

From Fischer et. al. “RHIC Collider Projections (FY 2012 – FY 2016)” 14 October 2011

Run 12 projection for √s = 500 GeV pp From Fischer et. Al. “RHIC Collider Projections (FY 2012 – FY 2016)” 14 October 2011

Run 12 projection for √s = 193 GeV/n UU From Fischer et. Al. “RHIC Collider Projections (FY 2012 – FY 2016)” 14 October 2011

Run 12 projection for √s = 200 GeV/n CuAu From Fischer et. Al. “RHIC Collider Projections (FY 2012 – FY 2016)” 14 October 2011