ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.

Slides:



Advertisements
Similar presentations
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Advertisements

1 RIC 2009 Construction Inspection Program Glenn M. Tracy, Director Division of Construction Inspection and Operational Programs March 11, 2009.
1 RIC 2009 Enforcement Discretion Policies in Fire Protection Doug Starkey Senior Enforcement Specialist Office of Enforcement March 12, 2009.
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
“RULES FOR INSERVICE INSPECTION OF NUCLEAR PLANT COMPONENTS”
Plant Vogtle 1&2 10 CFR Pilot Program NESCC Meeting
1 Extension of Construction Authorization for the Mixed Oxide Fuel Fabrication Facility David Tiktinsky Senior Project Manager Division of Fuel Cycle Safety,
10 CFR Part 26, Subpart I Managing Fatigue 10 CFR Part 26, Subpart I Managing Fatigue Kamishan O. Martin, Human Factors Engineer Office of Nuclear Reactor.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
Chapter 56 Workgroup Orientation Session The Road to Chapter 60 June 30, 2007.
Release of Patients Treated with I-131: An Update Michael Fuller Team Leader Medical Radiation Safety Team U.S. NRC.
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
Branch Technical Position on Concentration Averaging and Encapsulation
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
1 10 CFR Part 26 Subpart I Managing Fatigue Kamishan Martin Human Factors Engineering June 23, 2010 HPRCT conference.
ASME / NRC Management Meetings Kevin Ennis Director, Nuclear C&S Ryan Crane C&S Project Engineering Manager ASME 2 Park.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Fermi Case Study Flow Variance ≥ 2% Obtaining NRC relief to allow for use of a 2.78% total flow reference band for Fermi RHR Service Water Pumps ISTOG.
1 ISTOG Position on Pre-conditioning ISTOG Input on Interpretation and Clarification Of NUREG-1482 Sections 3.5 / 3.6.
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
NRC Endorsement of Standards
DECEMBER 2010 ISTOG MEETING NEW Q & A CARD DISCUSSION.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
11 Technical Session 3 – Rulemaking Process: NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a Raymond (Ray)
ACADs (08-006) Covered Keywords CFR policy, CFR violation, CFR enforcement Description Supporting Material
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
Summary of Rulemaking in California for the Forensic Alcohol Laboratories Regulation Review Committee Cathy L. Ruebusch, RN, MSN Office of Regulations.
UNITED STATES DEPARTMENT OF AGRICULTURE FOOD SAFETY AND INSPECTION SERVICE FSIS Directive PRIOR LABELING APPROVAL 1 District Correlation Meeting.
ISTOG Winter 2010 – Ed Cavey Fermi 2 1 ISTOG Issues - Code Inquiries / Proposed Code Cases ISTOG Issues from 2010 January meeting and subsequent telecons.
RIC 2008 Power Reactor Security Requirements Rule Bonnie Schnetzler Team Leader, Security Rulemaking Team Division of Security Policy Office of Nuclear.
1 Emerging Issues: Materials and Mechanical Michele G. Evans, Session Chair 2009 RIC.
1 Control Room Habitability Program James A. Carlson, Omaha Public Power District, Author Deep Ghosh, Southern Nuclear Operating Greg Holbrooks, PE, Duke.
Regulatory Framework for Uranium Production Facilities in the U.S.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
1 Update on Emergency Preparedness and Response Activities 2009/2010 NRC Region I/FEMA I, II & III Joint Emergency Preparedness Information Conference.
1 Impact of Revised 10 CFR 50.46(b) ECCS Acceptance Criteria 2009 Regulatory Information Conference Rockville, MD March 12, 2009 Mitch Nissley Westinghouse.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
ASME OM CODE CASES Presented by Jeff Neyhard for Ron Lippy Intro 101???
1 ISTOG QUESTIONS ISTOG QUESTIONS IST Program Plan Submittals to Regulators: Prior to OM-2001, and going back to ASME Section XI, there.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
Online Radiation Safety Training Programs Tomas Herrera FSME/MSSA/Licensing Branch OAS Annual Meeting Milwaukee, Wisconsin August 27-30, 2012.
Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61
NRC’s 10 CFR Part 37 Program Review of Radioactive Source Security
Recent Developments Regarding Control Room Habitability Assessment
Industry Guidance on Part 21 Evaluation and Reporting
Office of Nuclear Materials Safety and Safeguards
NRC’s LLW Regulatory Program: Update of Emerging Issues
Updating the NRC’s Alternative Disposal Request Guidance Document
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
Update on Category 3 Source Security and Accountability Initiatives
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
NRC’s LLW Regulatory Program: Update of Emerging Issues
Update on CTAC VCS Subcommittee
EPRI Development of Nuclear Power Plant Implementation Guide for NRC Branch Technical Position on Concentration Averaging and Encapsulation Presented.
NRC Cyber Security Regulatory Overview
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Research and Test Reactor Safety: The Regulatory Perspective
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
Decommissioning Rulemaking
NRC Update on Regulatory Activities Affecting Industrial Radiography
TRTR Briefing September 2013
RESOLUTION OF GENERIC SAFETY ISSUE 191
NRC Update on Regulatory Activities Affecting Industrial Radiography
Presentation transcript:

ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation December 6, 2010

2 Topics for Discussion Draft NUREG-1946 –Replacement for NUREG-1482, Rev. 1 –Inclusion of Updated Guidance on Preconditioning Use of Tech. Spec. Surveillance Reqs. Applicability for IST Pump and Valve Tests –Missed Excess Flow Check Valve Test at Clinton Dynamic Restraints (Snubbers) Other Issues –10 CFR 50.55a Rulemaking –10 CFR Alt. Treatment Inspection Procedure –ASME/NRC 2011 Symposium

3 Draft NUREG-1946 Reasons for Change to NUREG-1482, Rev. 1 –Update Document to Reflect Changes to the ASME OM Code –Remove Information that is not Accurate –Remove Guidance that is Available in Other Documents –Remove/Change Implied OM Code Reliefs –Update Other Information

4 Draft NUREG-1946 Much More Info. from NUREG-1482 should have been included in Draft NUREG-1946 Guidance on Acceptable and Unacceptable Preconditioning of Pumps and Valves will be Added Needs to Address Several New Reactor Issues

5 Draft NUREG-1946 Initial Public Comment Period Closes on January 20, 2011 There Will Likely Be Another Public Comment Period

6 Use of TS SR App. for IST Tests Background –TS SR allows licensees to extend the frequency of a missed TS Surveillance –Current interpretation from the NRC is that SR is only applicable to TS surveillances –This interpretation also likely impacts TS SR –The TS Administrative Controls Section for the IST Program states that SR is applicable to IST –NUREG-1482, Rev. 1 also notes that SR is applicable to the IST Program

7 Use of TS SR App. for IST Tests Current and Future Activities –Licensees that miss an IST test should perform an operability/functionality assess. & evaluate if a relief request is needed –NRC staff are preparing a generic communication to explain the operational impact of this current interpretation –NRC staff are working with the TS Task Force to develop revs. to TSs for IST Prgm. testing –NRC staff are also working with the ASME OM Code to develop Code Cases to address the requirements for IST frequency & grace periods & for missed tests

8 Dynamic Restraints (Snubbers) Background –NRC staff discovered that some licensees were not following the ISI & IST requirements for snubbers as specified in 10 CFR 50.55a –Licensees must submit a request for relief & receive NRC approval if they are not following the requirements in 10 CFR 50.55a –Requests for relief are only valid for the 10-year ISI/IST period in which relief was granted

9 Dynamic Restraints (Snubbers) RIS & EGM –Regulatory Issue Summary (RIS) reminded licensees of the NRC’s requirements for snubber inspection & testing –Enforcement Guidance Memorandum (EGM) provided enforcement discretion after issuance of RIS for violations of 10 CFR 50.55a associated with ISI & IST of snubbers

10 Dynamic Restraints (Snubbers) EGM Specifics & Expectations for Licensees –EGM allowed enforcement discretion for six months after the RIS was issued if: Licensees enter any snubber noncompliances into their corrective action program Implement adequate compensatory measures for noncompliances Appropriately evaluate any operability/functionality effects on SSCs –For licensees that meet the requirements for discretion described above, an additional 18-month period of discretion is allowed for: Correction of identified noncompliances Adequate compensatory measures must be maintained

11 Dynamic Restraints (Snubbers) Future NRC Activities –NRC plans to issue an inspection procedure to review the compliance of licensees’ snubber programs with 10 CFR 50.55a requirements

12 Other Issues 10 CFR 50.55a Rulemaking –New Rule will incorporate by Reference the 2005 & 2006 Addenda of the ASME OM Code –Final Rulemaking is scheduled for completion by May 1, 2011 –Reg. Guide 1.193, Rev. 3, “ASME Code Cases Not Approved for Use,” was issued in October 2010 –Proposed Rulemaking & Reg. Guides 1.192, Rev. 1, “O&M Code Case Acceptability, ASME OM Code” & 1.193, Rev. 4 should be issued for public comment in the Spring of 2011

13 Other Issues 10 CFR Alternative Treatment Inspection Procedure –Will be shared with the nuclear industry (via NEI) in early 2011 –Procedure focuses on the most risk significant aspects of implementation of 10 CFR –Inspections will be performance based –Final Inspection Procedure to be issued in the Summer of 2011

14 Other Issues ASME/NRC 2011 Symposium –Will take place in Rockville, MD on August 15 th & 16 th 2011 –Abstracts for papers due by December 17, 2010 –Includes discussion of issues related to IST of pumps and valves & ISI and IST of snubbers –Will also include info. exchange on new reactor IST issues –Final Papers due on May 13, 2011

15 QUESTIONS