Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Review of NTS entry charge setting arrangements - IA 1 July 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
GB Queue The GB Queue – Problems and possible solutions Mark Copley.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
TNSP Outputs for Use in Economic Benchmarking AER Economic Benchmarking Workshop #2 14 March 2013 Denis Lawrence and John Kain.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
M ICHIGAN P UBLIC S ERVICE C OMMISSION Transformation of the Electric Power Industry: Value of Regulatory Impact Assessments Greg R. White Commissioner.
The Australian Energy Regulator SA Electricity distribution determination 2015–2020 Consumer/stakeholder forum 3 September 2014.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
User Pays Funding – Potential Licence Mechanism Simon Trivella – January 21 st 2010 Governance Workstream.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Reactive Power Federal Energy Regulatory Commission Open Meeting December 15, 2004.
EHV generation charging methodology change Harvey Jones.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
2014 Reports to the Minister Markets Team Ken Michael Room, 25 September 2014 Ensuring quality services for a reasonable price 1 Workshop.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
ARODG - 2 An overview of transmission access arrangements Mark Copley & Colin Sausman 1 st and 2 nd February 2007.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
An update on the Market Development Program Phil Bishop New Zealand Electricity Commission Presentation to the EPOC Winter Workshop 3 September 2009.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
Commission For Energy Regulation Padraig Fleming Manager, Distribution & Retail 22 nd July 2004.
Managing Exceeded Capacity. 10 September The Issue of Exceeded Capacity DNO Connection Charging Methodologies: customers who increase Maximum Capacity.
Location, location, location FSR Executive Seminar Which network for which market design? Martin Crouch June 2014.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
Industry Dialogue on xoserve Services 14 th September 2007.
Demand Side Management Andy Pace 6 October | Energy Networks Association - DCMF.
Ofgem’s decision on UNC modification proposal 044 Sonia Brown.
Economic Benchmarking vs Financial Incentives – an alternative to incentivising performance in the gas industry? Ashley Muldrew, Gas Speak 2015.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Presentation at REEEP Regulatory Forum, 28 September 2004
Modification Proposal 0283 Update
User Pays Funding – Potential Licence Mechanism
SO Incentives from April 2010
Publication of Historical Gas Operational Data by National Grid NTS
PARCA Security and Termination Amounts
Consideration of issues raised by UNC Modification Proposal 0244
Joint Office Presentation for Modification 0678
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Entry Capacity Transfer and Trade
Consideration of issues raised by UNC Modification Proposal 0244
Options for the Development of a Demand Side Response Mechanism
Ofgem presentation to Gas Transmission Workstream
195AV “Future work” – system flexibility
Presentation transcript:

Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives

2 Environmental Incentives in RIIO-GD1 supporting distributed gas / biomethane Extract from “Decision on strategy for the next gas distribution price control - RIIO-GD1 Outputs and Incentives. Table 3.1 Summary of output measures and policies that contribute to environmental objectives”

3

4 Connection policy Connection and use of system charging for distributed gas  Deep vs shallowish connection charging policy  Gas – currently has deep connection charging i.e. network reinforcement funded by connecting producer  Electricity – have a shallowish connection boundary – therefore distributed generation incentive is used to incentivise network operators to undertake efficient reinforcement investment  Reflects benefits of losses reduction and potential voltage support  Not a volume driver  Any changes to the connection charging policy would need to reflect benefits to the network (and other users)  RIIO-GD1 sets out GDNs to review charging methodologies and propose modifications where there is an objective rationale (to be considered on their merits)

5 Connection policy Industry currently considering UNC Modification 0391 – Distributed Gas Charging Arrangements  Ofgem will consider in due course  Will also consider any evidence that distributed gas entering at distribution level provides benefits to the network to justify other network customers funding these connection costs  Argument for connection boundary to remain deep to encourage competition in provision of connection assets In event of a boundary change  GDNs would need to recover certain expenditure on entry connection through their allowed revenue  RIIO-GD1 provides a mechanism similar to that of DG to incentivise efficient investment  Initially log up efficient costs to be assessed at a later stage (re-opener triggered or end of price control)  Incentivised cost pass through mechanism could be implemented if there is sufficient information to assess efficient connection costs

6 Capacity issues Differences between electricity and gas networks affect ability to offer priority access and dispatch Gas  Technical aspects of connection still need to be resolved (e.g. gas quality, injection equipment)  Localised gas networks  Planning is done on peak capacity  Insufficient firm demand to offer firm contracts  Constraints on moving gas to where there may be demand - still to be resolved Any incentive to offer firm capacity contracts would have to be funded by all network customers  Insufficient information is currently available to demonstrate benefits to the network to justify other customers funding these costs RHI  Provides support for producers through payment for energy generated for use  Does not fund connection costs

7 Current position  A range of mechanisms are in place / being put in place to encourage bio- methane connections  There is currently insufficient information available on efficient costs associated with the connection of distributed gas to the grid to justify additional incentives at this time  There are differences between technical aspects of gas and electricity networks which mean that priority access and dispatch for distributed gas cannot be similarly incentivised as for electricity  We have a duty to balance the interests of all stakeholders

8 RIIO-GD1 – Environmental Impacts Process followed Policy consultation process for next price control (RIIO-GD1)  Environmental Working Group meetings  Discussions on proposed incentives / reporting requirements  Consultation (17 December 2010 – 4 February 2011)  Consideration of submissions Decision on RIIO-GD1 policy  Published 31 March

9