BIDDING PRIVATE AND PUBLIC WORK Major Differences between Private and Public How to determine whether a project is Public or Private: "Who owns the dirt"

Slides:



Advertisements
Similar presentations
A GIA is a contract between a surety company and a contractor (or subcontractor)/principal. A GIA is a standard, typical document in the construction.
Advertisements

Construction Contracting
Managing Construction Risks
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
Contract formation Review notes form Chapter 5 of the book Each contract carries a promise and performance expectation Legal enforcement promotes economic.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Commercial Law (Mgmt 348) Professor Charles H. Smith Bankruptcy Law (Chapter 30) Spring 2011.
CARLIN LAW GROUP, APC (619) Know Your Indemnity Obligation Know Your Risk Know Your Insurance Company by KEVIN R. CARLIN, ESQ.
Copyright (c) 2000 Vincent W. King, PA All Rights Reserved.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Subcontracting Construction Engineering 380. Subcontracts Owner doesn’t “recognize” subcontractors They are representatives of the contractor Prime usually.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Flexible Solicitation Formats in Public Competitive Procurement.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Open Records from the OAG Perspective Amanda Crawford Division Chief Open Records Division.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
The Islamic University of Gaza Engineering Faculty
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
PROCEDURES FOR SELECTING THE CONTRACTOR
The prime aim Make you acquainted to the contractual approach to agency problems.
Chapter 17 Construction Bonds Vanessa S. Werden
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
Risk, Responsibility and Dispute Avoidance Insurance Craig A. Wallace, P.Eng
INTRODUCTION TO PUBLIC PROCUREMENT
Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.
111 Con E 221 Review graded exams on Monday Review presentation guideline for term papers Finalize presentation schedule on Monday.
Performance of Contractor Agreements: Practical Issues Kyiv, September 2012 Kristina ARTEMENKO EU Project "Harmonisation of Competition and Public Procurement.
Construction Engineering 380 Contract Changes. Types of changes –Cardinal change- drastic change, either single direction or accumulated change in scope.
Demystifying Design-Build Virginia Association of Governmental Purchasing March 22, 2007 By: Thomas R. Folk Reed Smith LLP Phone:
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Construction Contracts What You Need to Know March 19, 2015.
DEVELOPMENTS IN THE LAW RELATING TO ‘CONSEQUENTIAL LOSS’ Anthony Jucha 30 March 2010.
© 2009 Gibbs, Giden, Locher & Turner LLP - All Rights Reserved 1 The Spearing Doctrine and Definitions of “Complete” Construction Documents Presented by.
Project risk and control. Tender risk Programme and method – Tightness of completion LAD’s Extent of change – Construction method Temporary works Change.
Copyright © 2008 Pearson Education Canada13-1 Chapter 13: Agency and Partnership.
CONSTFUNDAMENTALSCONSTFUNDAMENTALS Overview of the Construction Industry, Chapter 2.
Construction Contracts and Project Delivery Methods
Project Relationships Legal forms of business Sole proprietorship General Partnership/Joint Venture Limited partnership Corporations (incl S-Corp and closely.
Public Procurement Procedure – Bidding Documents
West Contra Costa Unified School District: CONTRACTOR DEBARMENT POLICY Facilities Sub-Committee October 9, 2012.
CONSTRUCTION CONTRACTS DOCUEMENTS
LECTURE 4 FORMULATION & PRESENTATION OF MONETARY CLAIMS  Recovery of Loss / Expenses / Damages  Notice of intention to claim  Particular and further.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
“Your Open Door to Bonding”. In 1971, the SBA launched a program to assist small, emerging and disadvantaged contractors to obtain surety bonds that were.
Competitive Bidding Construction Engineering 380 Engineering Law.
Issues in Professional Practice Certification AIC-PC, PMI-CPM Sick Building/Indoor Air Quality- energy efficiency requires airtight construction. This,
LEGALITIES. Independent Contractors vs. Employees ◦ Personal trainers working in clubs are: ◦ Independent Contractors ◦ Employees ◦ Personal trainers.
Highway to Hell or Strawberry Fields Forever Identifying and Dealing with Avoidable Project Risk.
Why Bond Forms Matter… A Practical Guide to Better Bonding Presenters: Joanne S. Brooks, Esq., Vice President and Counsel, The Surety and Fidelity Association.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
American Bar Association Forum on the Construction Industry 2005 Annual Fall Meeting Pitfalls Associated with the Mutual Waiver of Consequential.
© Hendrick, Phillips, Salzman & Flatt, P.C. – March 8, 2016 What Roofing Contractors Should Look Out For and Include in Contracts and Warranties March.
1 Risk Management Bonding & Insurance Jimmy Porter Risk Analyst City of Atlanta.
Corporate & Business Law (ENG). 2 Section D: The formation and constitution of business organisations Designed to give you knowledge and application of:
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Wisconsin Department of Health Services Purchase of Services Contract Guide Julie Anstett and Lucinda Champion Friday, May 6, 2016 Wisconsin Department.
Licensing Determinations and Contractor Licensing Responsibility Licensing Determinations The Housing Authority will specify the classification(s) of a.
Discussion of the Differences Public Works Law and Bid Law
Contracts A contract is an agreement between two or more parties which creates an obligation to do or not to do a particular thing. The document containing.
What Small and Emerging Contractors Need to Know Understanding the Basics of Contract Surety Bonds © Copyright 2016 NASBP.
ARI’S Services Contract Research & Consulting Engaging with industry
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Principles of contractual liability
Contract Changes Construction contracts are unique because owner can make unilateral changes to contract (with consideration)
Presentation transcript:

BIDDING PRIVATE AND PUBLIC WORK Major Differences between Private and Public How to determine whether a project is Public or Private: "Who owns the dirt" Major Differences between Private and Public How to determine whether a project is Public or Private: "Who owns the dirt"

Private Projects Basically no rules: "Freedom of Contract" "Doctrine of Promissory Estoppel" A subcontractor can get stuck with its bid to a general contractor even though it made a mistake Leading case: Drennan v. Star Paving Co. (p.72) –General contractor must show justifiable reliance on bid Promissory estoppel applies to material suppliers –Commercial Code Section 2205 (p.74) Basically no rules: "Freedom of Contract" "Doctrine of Promissory Estoppel" A subcontractor can get stuck with its bid to a general contractor even though it made a mistake Leading case: Drennan v. Star Paving Co. (p.72) –General contractor must show justifiable reliance on bid Promissory estoppel applies to material suppliers –Commercial Code Section 2205 (p.74)

Public Projects Generally, must be competitively bid and awarded to the lowest responsible and responsive bidder Why competitively bid? –Ensure lowest price for public entity –"Level" playing field for bidders Generally, must be competitively bid and awarded to the lowest responsible and responsive bidder Why competitively bid? –Ensure lowest price for public entity –"Level" playing field for bidders

Responsiveness (p.86) Generally, bid must conform to the material terms of the invitation of bids Agencies almost always reserve the right to waive " immaterial variances " What is material variance v. immaterial variance Key case: Menefee v. County of Fresno (p.87) –The Menefee doctrine If the variance (mistake) would allow the bidder the opportunity to withdraw its bid that, in and of itself makes the bid non- responsive Generally, bid must conform to the material terms of the invitation of bids Agencies almost always reserve the right to waive " immaterial variances " What is material variance v. immaterial variance Key case: Menefee v. County of Fresno (p.87) –The Menefee doctrine If the variance (mistake) would allow the bidder the opportunity to withdraw its bid that, in and of itself makes the bid non- responsive

Responsibility (p.88) Public contract code section 1103 (supplement p.35): defines responsible bidder as… –"responsible bidder " means a bidder that has demonstrated the attribute of trustworthiness as well as the quality, fitness, capacity and experience to satisfactorily perform the public works contract. Use of Prequalification process –Public contract code section (supplement p.32-33) Public contract code section 1103 (supplement p.35): defines responsible bidder as… –"responsible bidder " means a bidder that has demonstrated the attribute of trustworthiness as well as the quality, fitness, capacity and experience to satisfactorily perform the public works contract. Use of Prequalification process –Public contract code section (supplement p.32-33)

Other issues in public bidding Alternate bids (supplement p.35-36) Affirmative action/outreach programs (main text 91-94) And (supplement p.36-41) Bid withdrawals and mistakes (p.85-86) –Can't negotiate with public entity regarding price "either you're in or your out" –"Bidders remorse" doesn’t work –Mistake must be arithmetic not due to error in judgment –Written notice needs to be given within five days after bid opening Alternate bids (supplement p.35-36) Affirmative action/outreach programs (main text 91-94) And (supplement p.36-41) Bid withdrawals and mistakes (p.85-86) –Can't negotiate with public entity regarding price "either you're in or your out" –"Bidders remorse" doesn’t work –Mistake must be arithmetic not due to error in judgment –Written notice needs to be given within five days after bid opening

Subcontractor Listing Law (p.82) Designed to prevent bid shopping and bid peddling Only applies to public work Subcontractors who are going to perform more than one-half of 1% of the project must be listed on bid form If no subcontractor listed it is presumed general contractor will do the work itself Designed to prevent bid shopping and bid peddling Only applies to public work Subcontractors who are going to perform more than one-half of 1% of the project must be listed on bid form If no subcontractor listed it is presumed general contractor will do the work itself

Subcontractor Listing Law (p.82) Substitution of listed subcontractors –Grounds are listed on page 83 of main text and pages 24 –25 of supplement (2) Bankruptcy or insolvency -- Don’t rely on these (4) Failure to meet bonding requirements (5) Inadvertent clerical error –Short time fuse to make claim of inadvertent error – only 2 days after bid opening (1) Refusal to execute a written contract Substitution of listed subcontractors –Grounds are listed on page 83 of main text and pages 24 –25 of supplement (2) Bankruptcy or insolvency -- Don’t rely on these (4) Failure to meet bonding requirements (5) Inadvertent clerical error –Short time fuse to make claim of inadvertent error – only 2 days after bid opening (1) Refusal to execute a written contract

Subcontractor Listing Law (p.82) Public entity determination of substitution of subcontractor does not prevent subcontractor from seeking damages for wrongful termination from general contractor –Key case Southern California Acoustics v. C.V. Holder (p.84) Public entity determination of substitution of subcontractor does not prevent subcontractor from seeking damages for wrongful termination from general contractor –Key case Southern California Acoustics v. C.V. Holder (p.84)

Construction Contracts Many contractual relationships in a construction project –Owner/Lender –Owner/Architect –Owner/General Contractor –General Contractor/Subcontractor For owner and general contractor consistency and conduit effect is critical Contract essentially is risk allocation agreement –Example: differing site conditions clause Many contractual relationships in a construction project –Owner/Lender –Owner/Architect –Owner/General Contractor –General Contractor/Subcontractor For owner and general contractor consistency and conduit effect is critical Contract essentially is risk allocation agreement –Example: differing site conditions clause

Owner/Contractor Relationship Use of AIA documents Basic Owner/Contractor Agreement (p ) –Identity of the parties –Description of the work –Time for performance –Contract price –Payment terms General Conditions (p.104 – 117) –The good, the bad and the ugly Use of AIA documents Basic Owner/Contractor Agreement (p ) –Identity of the parties –Description of the work –Time for performance –Contract price –Payment terms General Conditions (p.104 – 117) –The good, the bad and the ugly

The Contractor shall not be liable to the Owner or Architect for damage resulting from errors, inconsistencies or omissions in the Contract Documents unless the Contractor recognized such error, inconsistency or omission and knowingly failed to report it to the Architect

Shall carefully study and Compare… …shall take field measurements … …shall observe any conditions at the site…

3.2.3 If the contractor believes that additional cost or time is involved because of clarifications or instructions issued by the Architect in response to the Contractor's notice or requests for information pursuant to Subparagraphs and 3.2.2, the Contractor shall make Claims as provided in Subparagraphs and If the Contractor fails to perform the obligations of Subparagraphs and 3.2.2, the contractor shall pay such costs and damages to the Owner as would have been avoided if the Contractor had performed such obligations.

1. Damages incurred by the Owner for the rental expenses, for losses of use, income, profit, financing, business and reputation, and for loss of the management or employee productivity or of the services of such persons; and 2. Damages incurred by the Contractor for principal office expenses including the compensation of personnel stationed there, for the losses of financing, business and reputation, and for the loss of profit arising directly from the work Nothing contained in this Subparagraph shall be deemed to preclude an award of liquidated direct damages

…along with reasonable overhead and profit on the work not executed.

General Conditions Other Key Provisions –Interpretation of contract documents(p.104) –Indemnity (p ) and insurance (p ) –Delays and time extensions (p.112) –No damages for delay (p.113) –Notice requirements (p.117) Other Key Provisions –Interpretation of contract documents(p.104) –Indemnity (p ) and insurance (p ) –Delays and time extensions (p.112) –No damages for delay (p.113) –Notice requirements (p.117)

Design-Build Contracts Perceived advantages of design-build method of project delivery –Faster than traditional Design-Bid-Build –Eliminates many claims based on "errors and omissions“ – No “Spearin” liability –Open exchange of ideas at every stage of the project –Choices are product of collective wisdom of team –Cost efficiency Perceived advantages of design-build method of project delivery –Faster than traditional Design-Bid-Build –Eliminates many claims based on "errors and omissions“ – No “Spearin” liability –Open exchange of ideas at every stage of the project –Choices are product of collective wisdom of team –Cost efficiency

Design-Build Contracts Perceived Disadvantages –Owner loss of control –Requires sophistication/experience –Are we building a "Chevy or Cadillac" ? –Aesthetic considerations How much information/detail should the owner give the design-build team pre- contract? Perceived Disadvantages –Owner loss of control –Requires sophistication/experience –Are we building a "Chevy or Cadillac" ? –Aesthetic considerations How much information/detail should the owner give the design-build team pre- contract?

General Contractor/Subcontractor Relationship Flow-down provisions Pay-if-Paid and Pay-when-Paid clauses (p ) Obligation to continue work clauses (p ) Flow-down provisions Pay-if-Paid and Pay-when-Paid clauses (p ) Obligation to continue work clauses (p )