1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.

Slides:



Advertisements
Similar presentations
Protection study options for HQ01e-3 Tiina Salmi QXF meeting, 27 Nov 2012.
Advertisements

Protection and Relay Schemes. Agenda  Introduction of Protective Relays  Electrical System Protection with Protective Relays  Conclusion.
1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
EGD ELECTRICAL ELECTRICAL SYMBOLS.
TE-MPE-CP, RD, 03-Dec Quench Detection and Energy Extraction Systems R. Denz (Quench Detection), K. Dahlerup-Petersen (Energy Extraction Systems),
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
TE-MPE-EP, RD, 26-Jul Quench Heater Supervision for MB Status of System Integration R. Denz TE-MPE Technical Meeting July 26 th Acknowledgements:
CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
Status of COBRA Magnet Wataru OOTANI MEG review meeting July 11 th, 2003 PSI Switzerland.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
TE-MPE-CP, RD, 23-Nov Summary of Radiation Induced QPS Events in LHC 2010 R. Denz TE-MPE-CP.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Changes in QPS R. Denz, TE-MPE-EP MPP workshop Acknowledgements: K. Dahlerup-Petersen, V. Froidbise, S. Georgakakis, B. Magnin, C. Martin, J.
LARP CM15 Magnet Testing Working Group SLAC, November 2 nd 2010.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
DQHDS Upgrade: Status of Hardware Design. Approach to implementation of the new heater measurement system. 08/06/2011V. Froidbise.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
TE-MPE-CP, RD, 09-June Enhanced Diagnostics & Supervision for Quench Heater Circuits R. Denz TE-MPE-CP.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
For more info:
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
TE-MPE-EP, RD, 26-Aug Workshop on QPS Software Layer Hardware / Agents R. Denz, TE-MPE-EP.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
Recent cross-wiring issue and implication for circuits protection Bozhidar Panev TE-MPE-CP
QPS R2E Status R2E Internal Meeting, October 24 th 2013Discussion 1 LS1 developments Digital Quench Protection insertion region magnets Delivery/installation.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
TE-MPE-CP, RD, 06-Oct Radiation Induced Faults in QPS Systems during LHC run 2011 R. Denz TE-MPE Technical Meeting October 6 th.
Grounding.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
TE-MPE-EP New DQLPU type A Production of 1300 new protection units TE-MPE-EP, VF, 23-Nov-2012.
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
TE-MPE-CP, RD, LHC Performance Workshop - Chamonix Feb R. Denz TE-MPE-CP on behalf of the QPS team QPS Upgrade and Re-commissioning.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
QPS high level controls LabView tools, an overview.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
TE-MPE-CP, RD, 12-Dec QPS - analysis of main problems, areas to target, possible improvements R. Denz, TE-MPE-CP Evian 2011.
CERN TE-MPE-EP, RD, 09-April Quench Protection Systems (QPS) for the LHC R. Denz, TE-MPE-EP Acknowledgements: K. Dahlerup-Petersen, A. Siemko, J.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
S. Feher MICE Magnet Readiness Review RAL, June 28th, 2016
ABT-EC EYETS Activities 2nd reports
D1 and D2 powering and protection
ELQA Electrical Quality Assurance
Acknowledgements: H.Milcent, R.Denz, R.Schmidt, M.Zerlauth
Ideas and design concepts, and challenges
Powering the LHC Magnets
MPE main activities planned for LS2
Status of ELQA equipment and related software
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Detailed global view on protection and detection of the circuits
Quench detection electronics for the HL-LHC magnet circuits of the LHC
Remote setting of LHC BLM thresholds?
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Presentation transcript:

1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals

2 J. Mourao (TE/MPE/CP) Status for 2011  Based on 2010 experience the following improvements will be implemented for the 2011 run –Replacement of main switches as many as feasible during Xmas break –Additional software interlock creating a warning message followed by a slow abort after a certain delay when we lose: One DQHDS of an IPQ, IPD, IT or MQ magnet Two DQHDS of a MB magnet –Firmware upgrade for the local protection data acquisition boards (DQAMC) installed in hot zones (P3, P7,L2,R8 ) Only 3 out of 4 dipole DQHDS required for QPS_OK Secondary Pm trigger on DQHDS voltage – discharge curves as well recorded in case only symmetric quench detection is triggering DQHDS (useful during commissioning / no current in the circuit)

3 J. Mourao (TE/MPE/CP) Increase Magnet diagnostic capabilities –Present system monitors quench heater voltage – sufficient for healthy heater circuits –Some dipole magnets are equipped with quench heaters which may show problems during LHC exploitation  Magnet experts are asking us if we can increase diagnostic capabilities for qualification and possible fault detection of the LHC main dipole quench heater circuits –Their wish list: Perform discharge tests with lower energy Monitor discharge current Check electrical continuity of quench heater after discharge Check quench heater sanity (if possible) Check for eventual earth faults

4 J. Mourao (TE/MPE/CP) Our proposals  Magnet expert wish list to be very carefully looked with respect to additional risks and feasibility: –Perform discharge tests with lower energy Feasible with existing hardware during DQHDS recharge (switch-on campaign after a shutdown) by using a new dedicated software tool  to be tested for IPQ already this shutdown –Monitor discharge current Feasible with additional hardware (shunt resistor or current sensor) in combination with new version of DQAMC type data acquisition system (additional analog inputs including connections plus higher sampling rates required) Additional risks due to modification of the 6076 discharge circuits Not excluded but not for free either –Check electrical continuity of quench heater after discharge Fault normally revealed by PM files A software trigger of a low voltage discharge after each Quench (full power discharge) can be easily implemented.

5 J. Mourao (TE/MPE/CP) Our proposals (continued) –Check quench heater sanity (testing for partly broken heaters) Discussions with several experts led to the conclusion that a possible solution will require a sophisticated data acquisition system allowing to record HF signals during test discharges Very expansive solution for 6076 devices, which may require in addition a new physical fieldbus layer for data transmission Development of a radiation tolerant version of such a device not straightforward (if feasible at all) Proposal is to use mobile devices and test to be integrated into ELQA procedures –Heaters Earth faults check We think the best way, is to make an insulation test with a mobile tester (eg: during the ELQA MIC test)

6 J. Mourao (TE/MPE/CP)