DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) 263-0653 March 3, 2008.

Slides:



Advertisements
Similar presentations
Ancillary Services and SCED Jeff Gilbertson Market Analyst Congestion Management Working Group 9/4/2013.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
Concerns with RUC Capacity Short Charge and Energy Trades.
DSWG Update to WMS May 17, DSWG Goals Update.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
1 Project Update and Summary of Project Priority List (PPL) Activity September 10, 2015.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
August 2012 QMWG DAM Clearing Behavior for Fixed Quantity Blocks Carrie Tucker Supervisor, Day-Ahead Market.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
1 Impact Assessment of Parking Deck NPRRs/SCRs/NOGRRs Phase 1 March 2011.
1 Impact Assessment of Parking Deck and New NPRRs/SCRs Phase 1 February 2011.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Market Credit Working Group Update to WMS Wed. Nov 18, 2009.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Lead from the front Texas Nodal 1 Reduction of MMS Vendor Effort for TPTF January 8, 2008 Murray Nixon Sai Moorty.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
TAC 2012 Meetings Update (March & April) to Commercial Operations Subcommittee Harika Basaran 5/8/2012.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Protocol Revision Subcommittee
Ancillary Service Trades and Ancillary Service Settlement
Congestion Management and Ramp Rate for Delivering Ancillary Services
Settlement Update Austin Rosel ERCOT October 11, 2017.
Real-Time Co-optimization of Energy & Ancillary Services
Vendor Definition of DAM Commitment
Presentation transcript:

DAM Self-Commitment Issues & Solutions Shams Siddiqi, Ph.D. (512) March 3, 2008

Background  Current implementation does not allow Self- Committed Resources (SCRs) to offer Ancillary Services and co-optimize energy and AS offers from available capacity as required by Protocols : (d) An Ancillary Service Offer linked to a Three-Part Supply Offer from a Resource designated to be Off-Line for the offer period in its COP may only be struck if the Three-Part Supply Offer is struck. The total capacity struck must be within limits as defined in item (4)(c)(iii) of Section 4.5.1, DAM Clearing Process. (e) An Ancillary Service Offer linked to other Ancillary Service offers or an Energy Offer Curve from a Resource designated to be On-Line for the offer period in its COP may only be struck if the total capacity struck is within limits as defined in item (4)(c)(iii) of Section February 21, 20082

Background  The other problem is not a SCR issue, but rather corrects co-optimization for all Resource offers – linked (or “Inclusive”) AS and Energy offers may be struck in a way that does not account for the opportunity cost February 21, 20083

4 Solution Pieces to Correct Problem 1.Ignore temporal constraints for Generation Resources with Online AS offers only for some or all hours of the DAM (i.e. no Three-Part Offer or Offline AS is submitted for the day). Such Resources will be allowed to enter an EOC in the adjustment period (no EOC was submitted in the DAM anyway) with a new reason code “DAM Self-Committed”. This allows SCRs to offer AS in DAM 2.Correct the co-optimization of “Inclusive” AS and Three-Part Offer to limit AS and/or energy award to the maximum quantity of the Energy Offer Curve. This is not an SCR issue but rather corrects co-optimization for all Resource offers.

February 21, Solution Pieces to Correct Problem 3.Ignore temporal constraints for Generation Resources with EOC-only and/or Online AS offers only for some or all hours of the DAM (i.e. no Three-Part Offer or Offline AS is submitted for the day). Such Resources will be allowed to enter an EOC in the adjustment period with the reason code “DAM Self-Committed”. This allows SCRs to take advantage of co-optimization in DAM as long as they are self-committed for the entire day. 4.Full implementation of co-optimization for all Resources including those that may be self-committed for only part of the day.

February 21, Implementing the Solution Pieces  May be possible to implement the relatively minor changes in items 1 and 2 (and possibly 3 – the group didn’t have enough time to redline the Req. doc for 3) prior to the 168- hour test.  Items 1, 2 and 3 likely impact only the DAM engine and have no impact on other systems (e.g. Settlements).  ACTION: Approve redline DAM Requirements document implementing items 1 (highlighted) and 2.

WMS Action  WMS endorses the work and proposed solution of the TPTF Subgroup on Self- Committed Resources in the DAM, and recommends that ERCOT allocate resources to calculate the cost and effort needed to bring online proposed changes 1, 2 and 3 February 21, 20087

8 Next Step: Implementing Item 3  DAM Subgroup redlined the Req. doc for implementing Item 3 with following changes: Ignore temporal constraints (MinUp, MinDn,MaxUp, MaxNumStarts) for generation resources with online AS offers only (RegUp, RegDn, RRS, Online Non-Spin) and/or EOC-only offers for some or all hours of the DAM The QSE submitting an EOC-only to offer excess energy of a self-committed Resource must set the LSL for the Resource at zero for the corresponding hours in their COP submitted for the DAM and should set the quantity of the first price-quantity pair of the EOC at 0 MW.

February 21, Action Needed for Item 3  Comment on changes to Req. doc to implement Item 3  Approve changes to the DAM and SASM Requirements document to implement Item 3 at next TPTF meeting  Set a high priority on resolving these issues preferably by market open so that implementation is in compliance with the Protocols (higher than any of the currently listed deferred items)

February 21, Other issues  Work on full implementation (Item 4) for implementation after go-live  The following issues are potential changes to the Protocols that were brought to the Subgroup: Limitations on updating EOC once Three-Part Offer is awarded in the DAM Ability to Block Offer Offline NonSpin AS Offers from DAM to SASM