1 Run7 startup M. Sullivan MAC Review Nov. 15-17, 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

1 PEP Status M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 6 Summary.
2E34 Meeting and MCC News IR2 Vacuum Studies (Mike Sullivan) Plans for Lattice and Optics Work (Yunhai Cai)
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Longitudinal motion: The basic synchrotron equations. What is Transition ? RF systems. Motion of low & high energy particles. Acceleration. What are Adiabatic.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 IR Vacuum M. Sullivan MAC Review Jan , 2006 M. Sullivan for the Machine Advisory Committee Review January 18-20, 2006 IR Vacuum.
MAC Review December 13-15, 2004 IR Upgrade M. Sullivan 1 Interaction Region Upgrade M. Sullivan for the Machine Advisory Committee meeting December 13-15,
IR2 Vacuum Status M. Sullivan for S. Ecklund, A Fisher, S. Novokhatski, F-J Decker, A. Kulikov, S. DeBarger, U. Wienands, S. Gierman, M. Petree, many BaBarians.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Topics from this weeks 2E34 meeting M. Weaver Jan 6, 2006.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
IR 2 Vacuum Update M. Sullivan for PEP-II team For the 2e34 meeting of Feb. 15, 2006.
PEP- II Linac Accelerator Systems Department The PEP-II Overview John Seeman SLAC Particle and Particle-Astrophysics Directorate PEP-II MAC Review January.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
SLAC Accelerator Department The PEP-II Accelerator Status and General Plans John T. Seeman Assistant Director of the Technical Division Head of the Accelerator.
1 IR NEG heating M. Sullivan MAC Review Dec , 2004 M. Sullivan Machine Advisory Committee Review December 13-15, 2004 IR NEG Heating and Upgrade.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
LAPPD status report. 6cm system status  System up and running since July –Temperature profile carefully mapped out in sealing and deposition chambers.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
Commissioning Plan of BEPCII Storage Rings J.Q. Wang April 26, 2006.
10 October 2003S. DeBarger PEP-II Vacuum Failures PEP-II Machine Advisory Committee.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
J. Turner 02/07/05 SLAC PEPII Accelerator Physics LER WIGGLER PLAN J. Turner, M. Donald, M. Sullivan, U. Wienands, J. Yocky Motivation and Concerns Details.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
26-October-2006 PEP-II MAC Session HOM measurement and analysis S. Weathersby, A. Novokhatski HOMs in LER region 4: overview, history Collimator wake fields.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
1 IR Vacuum M. Sullivan MAC Review Oct , 2006 M. Sullivan for the PEP-II team Machine Advisory Committee Review October 25-27, 2006 IR Vacuum Update.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
U. Wienands, Y. Cai, F.-J. Decker, M. Donald, W. Kozanecki, Yu. Nosochkov, T. Raubenheimer, J. Safranek, D. Sagan., A. Seryi, K. Sonnad, C. Steier, P.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
IR Heating Issues Stan Ecklund 4 August PEP-II Run 4 Post Mortem IR Heating Issues2 Overview of IR Heating Issues Vertex Bellows –Cooling added.
August 4-5, 2004 PEP-II Post Run 4 Review 1 M. Sullivan PEP-II Post Run 4 Review August 4-5, 2004 IR Summary and Issues.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
November 16-18, 2004 Belle High Luminosity Workshop 1 M. Sullivan High Luminosity workshop (HL6) November 16-18, 2004 IR Vacuum Summary and Issues.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
PEP- II Linac Accelerator Systems Department Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
M. Sullivan Apr 27, 2017 MDI meeting
Machine Coordinators: G. Arduini, J. Wenninger
The Interaction Region
Design Fabrication and Processing Group H. Padamsee
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
The PEP-II Interaction e+e- Factories Workshop
Weekend Summary Squirted N2 at 3027 under various conditions
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
PEP-II Status and Plans e+e- Factories Workshop
Interaction Region Design Options e+e- Factories Workshop
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
To Do list, open items as of 10-Feb \ Study threshold dependence on bunch length (Just changed Vrf to 4.5.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
JLEIC Main Parameters with Strong Electron Cooling
Saturday 26 November 2011.
Some of the Points Raised During my JLAB Visit
IR/MDI requirements for the EIC
Presentation transcript:

1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup Plans

2 Run7 startup M. Sullivan MAC Review Nov , 2007 Run 7 Startup Start up with the machine we turned off on Sept 4 –60 deg lattice Scrub rings until we can deliver –RF processing as we increase currents Run through the holiday break Deliver and scrub until we reach 1.6 A HER and 2.3 A LER and L  8x10 33 –Unknowns How does the HER behave? What is the abort rate?

3 Run7 startup M. Sullivan MAC Review Nov , 2007 Startup (2) Once we have a machine that is close in performance to what we had last summer –Install the 90 deg lattice for the HER Expect to try this the first full week of Jan (7-8) Start with currents of 1 A HER and 1.7 A LER –Look for temperature problems Gradually increase currents to 1.6 A HER and 2.5 A LER –Watch specific lumi –Watch abort rate Can we get back to the same luminosity? –If we are making progress and are close then keep the change –If we are far from previous lumi after several days of trying and not making significant progress then back out lattice change

4 Run7 startup M. Sullivan MAC Review Nov , 2007 Startup (3) 90 deg lattice stays in (first time) –Previous beam currents achieved and perhaps even more current Luminosity at least as good as before –Temperature issues are under control Headroom to go up in current Lower HER beta y* –Detector backgrounds ok? –Luminosity increase?

5 Run7 startup M. Sullivan MAC Review Nov , 2007 Startup (4) If HER 90 deg lattice taken out –Increase HER RF voltage from 16.5 MV to 17.0 mV Temperatures ok? Abort rate ok? –Lower HER beta y* Detector backgrounds ok? Luminosity increase?

6 Run7 startup M. Sullivan MAC Review Nov , 2007 Startup (5) In parallel with HER effort…. –Increase LER RF voltage to 5 MV Temperature issues under control? Headroom to go to higher currents? –Lower LER beta y* Detector backgrounds ok? Luminosity increase? Also in parallel, emittance control... –Construct correction for LER coupling –Implement correction (MD)

7 Run7 startup M. Sullivan MAC Review Nov , 2007 Startup (7) If 90 deg lattice fails on the first attempt… –Try to implement again if we have some understanding of why it didn’t work –This step not done if heating that can’t be fixed is what removed the 90 deg lattice We still might be able to increase the HER RF voltage to gain some bunch shortening Work would still continue in reducing the coupling and improving the emittance Raising RF voltages –These steps stop as soon as we hit temperature problems we can’t fix or if the RF abort rate is too high (after some amount of processing time)

8 Run7 startup M. Sullivan MAC Review Nov , 2007 Things we know we need to watch –IP bellows –Upstream of the detector NEG pumps HER LER –HER bpms –Ceramic chambers for kicker magnets LER HER –IR2 vacuum valves 2 have been removed 2 remain –LER abort spoiler? Should be ok now. Overheated in the by 4 bunch pattern

9 Run7 startup M. Sullivan MAC Review Nov , 2007 More things we need to watch –HER flex flange RF seals? Should be ok now. Have to watch. –LFB kickers Cables Filters Circulators –TFB kickers Cables Filters Plates –LER photon stops –Bellows at ends of support tube –Whatever we have not thought of…

10 Run7 startup M. Sullivan MAC Review Nov , 2007 Summary The decision making is difficult to fully describe. We will put together a sort of the rolling 2 week plan that will be modified as we find out things We will be exploring the limits of this machine We will need to have a nimble response when we happen to hit a particular limit Higher beam currents and shorter bunch lengths tend to push the machine limits in the same direction Careful monitoring is a must as we push up the performance of this machine

11 Run7 startup M. Sullivan MAC Review Nov , 2007 Backup

12 Run7 startup M. Sullivan MAC Review Nov , 2007 LER RF 4.5 MV HER RF 16.5 MV Delivery starts as soon as we get to about 4 x with high but acceptable backgrounds Lumi goal of 8 x10 33

13 Run7 startup M. Sullivan MAC Review Nov , 2007 Put in 90 deg lattice and try very hard to make it stick Raise LER RF to 5 MV Lower β y *s Raise HER RF to 17 MV if the above did not stick Emittance tuning Lumi goal of 11 x10 33

14 Run7 startup M. Sullivan MAC Review Nov , 2007 Try to get in the HER 90 deg lattice again Continue to raise beam currents Raise HER RF to 17.5 MV Lumi goal of 13 x10 33 Raise LER RF to 5.5 MV? Lower β y *s

15 Run7 startup M. Sullivan MAC Review Nov , 2007 Continue to raise beam currents Raise HER RF to 18.0 MV? Lumi goal of 15 x10 33 Lower β y *s Emittance tuning Continue optics studies