14/1/2011 LHC Lumi days - J. Wenninger 1 IP positions and angles, knowledge and correction Acknowledgments: W. White, E. Calvo J. Wenninger BE-OP-LHC.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
Chamonix 03 / Presentation 5.5 / J. Wenninger1 Orbit control for machine operation and protection Orbit control requirements Feedback performance.
S. White, LBS 17 May Van Der Meer Scans: Preliminary Observations.
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
Energy calibration at LHC J. Wenninger. Motivation In general there is not much interest for accurate knowledge of the momentum in hadron machines. 
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
02/02/ S. Baron RF-Experiments Timing Meeting - Feb RF CMS ATLAS ALICE LHCb BTPX Status.
Beam Commissioning WG, 10 August Luminosity Scans in the LHC S. White.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
LHC Collimation Working Group Monday, 21 March 2016 Analysis of collimator BPMs in the 2015 run A.Valloni, G. Valentino with input from R. Bruce, A. Mereghetti,
How low can we go? Getting below β*=3.5m R. Bruce, R.W. Assmann Acknowledgment: T. Baer, W. Bartmann, C. Bracco, S. Fartoukh, M. Giovannozzi, B. Goddard,W.
G. Trad on the behalf of the BSRT team Emittance meeting 04/11/2015.
Luminosity Scans at the LHC
Fabio Follin Delphine Jacquet For the LHC operation team
Luminosity monitor and LHC operation
LHC Wire Scanner Calibration
Wednesday
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
LHC Emittance Measurements and Preservation
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Tuesday TOTEM and transverse loss map (1) OK
Lost at 12:05 to power converter (RTQX2.R1) problem
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Friday morning 10:30 Optics measurements and corrections.
Tuesday 9th November 10:02 Fill beams dumped
Yesterday morning Held 1647 for a while – SPS kicker problem
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Collimation margins and *
Summary Thursday h21: Stable beams fill #1303.
Machine Tolerances in Cleaning Insertions
Monday 24 October hours of 25ns MD
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
LHC beam orbit and collision position determination & control – performance and issues, prospects for Run 3 Orbit in collision - Luminosity WS - J. Wenninger.
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

14/1/2011 LHC Lumi days - J. Wenninger 1 IP positions and angles, knowledge and correction Acknowledgments: W. White, E. Calvo J. Wenninger BE-OP-LHC

Orbit at LHC 14/1/2011 LHC Lumi days - J. Wenninger was the first year of real operation, with a significant learning curve along the year.  Orbit handling and orbit data quality improved along the run, sometimes hampered by ‘legacy’ effects (and lack of time to do fresh setups). Orbit handling in 2011 (in 2010 only for part of the year):  Define base reference orbit at injection with a flat machine. o Corrected orbit rms ~0.4 mm which is much better than design. Results an in aperture gain of ~ ±2 mm (>>  * reach). o (so far) no special treatment of IRs (zero crossing angle).  The same orbit is kept through the cycle, changing only the amplitudes of separation, crossing and lumi scan bumps.

LHC orbit – no bumps 14/1/2011 LHC Lumi days - J. Wenninger 3 ±4 mm Beam 1 Beam 2 H V H V

Orbit at LHC (2) 14/1/2011 LHC Lumi days - J. Wenninger 4  Define base reference orbit at injection with a flat machine.  The same orbit is kept through the cycle, changing only the amplitudes of separation, crossing and lumi scan bumps. o The bumps are ‘added’ on top of the base orbit. o Imperfections of the bumps (leakage outside the bump area from optics errors etc) are corrected experimentally. o Rough check of the measured crossing angle/separation (10%) o The residual variations (bumps excluded) through the cycle are at the level of mm rms. >> maintain identical orbits in IR3/7 for collimation to minimize the setup time.

Intensity effects 14/1/2011 LHC Lumi days - J. Wenninger 5  The LHC BPM has a sensitivity switch (auto-trigger threshold). o Low sensitivity range: ≥ 5-6e10 p. o High sensitivity range: < 5e10 p. o Residual intensity dependence.  The base orbit is defined for bunches with a charge of ≥6e10 p. o The rms difference of orbit readings for a low intensity bunch (1e10p) and a nominal bunch (1e11p) injected one right after the other is ~150  m.

IP positions - BPMs 14/1/2011 LHC Lumi days - J. Wenninger 6 Q1.L Q1.R 21.5 m  BPMSW position monitors (strip line) can be used to interpolate the IP beam positions and angles. Independent readouts for b1 and b2  increased syst. errors.  In IR1and IR5 there is an additional button monitor BPMWF (21.7 m) with common readout for b1 and b2. Requires timing information to disentangle the beams. Usable only with large bunch separation. BPMSW

Spectrometer bumps 14/1/2011 LHC Lumi days - J. Wenninger 7 Q1.L Q1.R The internal crossing angles due to the spectrometer bumps (ALICE & LHCb) cannot be measured with machine BPMs. We (machine) are effectively blind. We can only deduce it from the magnet settings and the external crossing angle bumps. Requires measurements with beam-gas events a la LHCb… BPMSW

Eva Calvo (BE-BI)7 December 20108/18 BPM issues : temperature  Long term stability limited by ambient temperature dependence  Systematic offset in the position measurement  Average value: 2.2 ADC bins/deg C (ARC BPM = ~50 um/deg C).  ∆Temp in 24h varies from day to day but can be up to 6 ⁰ C. E. Calvo – Evian WS Systematic shifts of up to ~300  m have been observed

Temperature drift mitigation  Calibration procedure in place for the temperature coefficient. o Temperature changes induced by reducing fan speed of VME crate while sending calibration pulses.  In 2011 we plan to systematically calibrate the BPMs (not the T coefficient) at the start of each fill (not done in 2010). o Minimize accumulated temperature errors.  Proper solution with temperature regulated racks in preparation (long shutdown). 14/1/ LHC Lumi days - J. Wenninger

Eva Calvo (BE-BI)7 December /18 BPM issues: ‘Missing’ channels (3%) Strip line monitor issues with low bunch charge (< 4e10):  Beam directivity smaller than sensitivity of electronics (~20 dB vs 35dB).  With I beam >2e10 p/bunch, B1 bunches can trigger B2 channels and vice versa. (LHC BPM front-end electronics auto-triggered, no timing signals in tunnel).  During 2011 commission Synchronous orbit mode (bunch mask) will reduce this problem.  75% correspond to BPMs close to the IR  Long coaxial cables (deported electronics)  Coupled noise and/or ground loops  Cable adapters will be installed this XMAS stop  Expect to reduce RMS noise in many channels E. Calvo – Evian WS The IR BPMs are not out best BPMs – situation expected to improve in 2011 (lower noise and bunch mask for orbit acquisition).

IP position/angle from BPMSW 14/1/2011 LHC Lumi days - J. Wenninger 11 For the collision orbit (where by definition we know that we collide), interpolations from the BPMSW:  Beam offsets: according to the interpolations the beams should miss each other in 3 out of 4 IPs, with offsets of up to 500  m. Large systematic errors (they are rather constant). Rely on luminosity scans to determine optimum beam overlap. LHC-OP never uses the BPMs to optimize beam overlap (except when desperate !). The offsets can be measured using so-called K-modulation – tested, but not done systematically (lack of time/interest).  The measured external crossing angles agree with expectations within some  rad. Matches the expected accuracy of ~20  rad (from observed BPM errors).

IP crossing angle from BPMWF 14/1/2011 LHC Lumi days - J. Wenninger 12  For the crossing angle much lower systematic errors should be achievable because both beams are handled by the same readout. BPMWF only work with fillings based on isolated bunches (OK for 90+ m  * running & VdM configurations).  BPMWF are not part of normal orbit data.  In 2010 the BPMWF were used occasionally in ‘expert’ mode.  In 2011 bunch-by-bunch orbits will become available 0.1 Hz), it is planned to include the BPMWF. o BPMWF information will be available for tuning and diagnostics (not for trains). o Systematic uncertainties to be estimated in 2011 (TOTEM & ALFA). It should be possible to reach the  rad scale.

Reproducibility & stability 14/1/2011 LHC Lumi days - J. Wenninger 13  Beam position changes due to: o Ground motion (random walk). o Earth tides (radial beam movement). o Magnet reproducibility. o Position measurement errors (  wrong corrections).  Changes counteracted by: o Orbit and radial position feedback (ramp & squeeze). We are considering extending this into the stable beams period. o Manual luminosity scans to optimize the beam overlap. At high intensity the OP crews have instructions to stick as closely as possible the reference orbit – machine protection. Beams are dumped in case of excessive excursion (even if no beam loss !)

Stability fill-to-fill 14/1/2011 LHC Lumi days - J. Wenninger 14 Global orbit rms change during 150 ns operation (wrt first fill). Residual AFTER correction (5 mins into a fill). Uncorrected orbit change would have been ~0.5 – 1.5 mm rms. 100  m Beam 1 H V

Stability in a fill 14/1/2011 LHC Lumi days - J. Wenninger 15 Beam 1 Beam 2 A rather typical example… 10 hours 30  m H V H V In stable beams Earth tides are often the dominant perturbation !

Reproducibility of beam overlap corrections 16 Amplitude of the corrections (B1-B2) applied. Fills since 10A/s ramp:  Fill-to-fill reproducibility: in general within +/- 60  m. Sufficient to find collision point with actual beam parameters (  ~ 60  m).  Horizontal plane worse than vertical plane.  IP2: large differences due to offset collisions.  x rms 41  m  x max 180  m  y rms 21  m  y max 90  m Statistics over all fills excluding IP2  S. White – Evian WS 14/1/2011 LHC Lumi days - J. Wenninger

/1/2011 LHC Lumi days - J. Wenninger 17  In 2011 a new base orbit will be defined. o The machine will be bootstrapped from that base.  We hope to see improvements in several areas. o BPM data quality: temperature correction, calibration procedure. o BPM offset determination using K-modulation (matter of priority…). o Fine tuning of the correction strategy. o Smoother switching between low and high intensity bunches.  We will also start to investigate more systematically the (non-) reproducibility of the machine orbit, in particular collision offsets.  A large amount of work ahead to understand systematic effects for total cross-section measurements by TOTEM/ALFA.