Imperial Valley Study Group Transmission Planning Collaborative 2005 California Geothermal Summit June 9, 2005 California Geothermal Energy Collaborative.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

CPUC Vision for Transmission Planning in the West Dian M. Grueneich, Commissioner California Public Utilities Commission Western Electricity Coordinating.
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
California Interconnection 101 An Update on Reform: What’s Happening and Why it is Important March 16, 2011 Sky C. Stanfield
CPUC Procurement Policies Robert L. Strauss California Public Utilities Commission Energy Division - Procurement Section.
Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
(c) 2011 San Diego Gas & Electric Company. All copyright and trademark rights reserved.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
An Overview of Arizona’s Renewable Transmission Planning Process Southwest Renewable Energy Transmission Conference Amanda Ormond – Ormond Group LLC Brian.
Arizona Corporation Commission 2010 Biennial Transmission Assessment Workshop June 3 & 4, 2010 Brian K. Keel Manager, Transmission System Planning Salt.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Implementing one of the most ambitious renewable energy standards in the country CALIFORNIA’S Implementing one of the most ambitious renewable energy standards.
Geothermal Collaborative Summit Transmission Session June 9, 2005 Ronald Davis Davis Power Consultants.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
California Energy Action Plan Tim Tutt California Energy Commission Dan Adler California Public Utilities Commission June 24, 2004 Goal II – Accelerate.
1 STEP Southwest Transmission Expansion Plan. 2 Southwest Transmission Expansion Plan (STEP) Subregional planning group formed in November of 2002 Coordinates.
ISO Grid Planning Presentation to CREPC October 1, 2002
Charles Hosken, General Manager Imperial Irrigation District
Presentation to San Diego Sierra Club Richard Caputo 12 Nov 07 Renewable Energy Parks.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
1 Transmission Line Projects in Maryland – an Overview Sandra S. Patty PPRP - Manager, Transmission Projects PPRAC Meeting Country Inn & Suites, Annapolis,
CVFPB Executive Committee Meeting – Agenda Item No. 8A Central Valley Flood Protection Board.
Transmission Planning at the California ISO September 10, 2015.
R / I Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code :15pm.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Rob Oglesby Executive Director California Energy Commission C ALIFORNIA E NERGY P OLICY G OING F ORWARD.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
California Transmission Planning Group Collaborative approach to State-wide Transmission Planning.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM IEPR Workshop Southern California Reliability: Transmission System Additions.
California’s Renewable Energy Transmission Initiative Anne Gillette Renewable Energy Policy Analyst California Public Utilities Commission August 12, 2008.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
© 2005 San Diego Gas and Electric Company and Southern California Gas Company. All copyright and trademark rights reserved Senate Energy Committee Hearing.
Governor’s Clean Energy GREEN TEAM Annual Statewide Air Quality Conference May 10, 2001.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
California Energy Commission An Overview of the Renewable Energy Transmission Initiative (RETI 1.0) Joint Agency Workshop to Introduce the Renewable Energy.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Cooperation on Regional Siting: How Is It Working - A California Perspective Dian M. Grueneich, Commissioner California Public Utilities Commission National.
1 Entergy Transmission Planning Summit Transmission Planning & Budget Process Doug Powell New Orleans, LA July 10, 2003.
CALIFORNIA ENERGY COMMISSION Renewable Energy Transmission Initiative (RETI)
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Renewables Portfolio Standard Status Report California Public Utilities Commission February 26 th, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
RMR Exit Strategies Update TAC November 6, RMR UNITS.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
AES HUNTINGTON BEACH ENERGY PROJECT
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Recent Activities for LIEE and CARE November 2007 Proposed decision submission (R ) Proposed decision submission (R ) IOU reporting.
Renewable & Alternative Power Implementation of the California Renewables Portfolio Standard February 6, 2007 Senate Energy, Utilities, and Communications.
LNBA Subgroup: Avoided Transmission Value
Presentation transcript:

Imperial Valley Study Group Transmission Planning Collaborative 2005 California Geothermal Summit June 9, 2005 California Geothermal Energy Collaborative Dave Olsen

2 Study Group Mission/Purpose Specify transmission upgrades for export of 2,000 MW geothermal power –Phased development plan –Consolidated permitting for entire project Consensus recommendation of stakeholders Create support sufficient to get upgrades built, overcome local opposition

3 Study Group Outcomes Detailed plan for entire build-out –Ensures reliability; least-cost/impact –Proposes triggers for each construction phase –Permitting strategy covering entire build-out –CPCN filing(s) for IOUs –Proposals to public power Boards of Directors –Financing/cost allocation-cost recovery plan –Possible joint public/IOU ownership/operation Advocacy for final approval/construction

4 Stakeholder/Participants Transmission owners/operators Potential power purchasers Generators/power project developers Counties/landowners; affected agencies CEC, CPUC for jurisdictional utilities Environmental groups/public; open to all

5 Study Group Structure Steering Committee –Recommends plan for phasing development, permitting, ownership/operation, funding Technical Work Group –Power flow, dynamic studies, production simulations Permitting Work Group –Plan to consolidate approvals for all phases of generation and transmission development

6 Technical Work Group IID, SDG&E, CA ISO, SCE, APS, WAPA, MWD, CFE, CalEnergy –Border fossil generators also participate Coordinated with SDG&E 500 kV study Regular reports to STEP (Southwest Transmission Expansion Project) –Facilitate study of regional impacts

7 Study Schedule Routing alternatives identified--Nov 04 Base cases developed for 2014, Heavy Summer and Light Autumn--Jan-Mar 05 Power flow studies--Mar-Apr 05 –Determine impacts at key delivery points vs. base case –Narrow study alternatives Dynamic studies--May 05 Production simulations--Jun-Jul 05 –Develop cost estimates; rank by ratepayer benefit/cost Report/recommended transmission plan 9/30/05

8 For More Information Next IVSG meeting: June 30, 2005 at SANDAG, San Diego