LHCb Data Challenge in 2002 A.Tsaregorodtsev, CPPM, Marseille DataGRID France meeting, Lyon, 18 April 2002.

Slides:



Advertisements
Similar presentations
LHCb Bologna Workshop Glenn Patrick1 Backbone Analysis Grid A Skeleton for LHCb? LHCb Grid Meeting Bologna, 14th June 2001 Glenn Patrick (RAL)
Advertisements

LHCb(UK) Meeting Glenn Patrick1 LHCb Grid Activities in UK LHCb(UK) Meeting Cambridge, 10th January 2001 Glenn Patrick (RAL)
LHCb Computing Activities in UK Current activities UK GRID activities RICH s/w activities.
NIKHEF Testbed 1 Plans for the coming three months.
Production Planning Eric van Herwijnen Thursday, 20 june 2002.
Current Monte Carlo calculation activities in ATLAS (ATLAS Data Challenges) Oxana Smirnova LCG/ATLAS, Lund University SWEGRID Seminar (April 9, 2003, Uppsala)
K.Harrison CERN, 23rd October 2002 HOW TO COMMISSION A NEW CENTRE FOR LHCb PRODUCTION - Overview of LHCb distributed production system - Configuration.
11 Dec 2000F Harris Datagrid Testbed meeting at Milan 1 LHCb ‘use-case’ - distributed MC production
Exploiting the Grid to Simulate and Design the LHCb Experiment K Harrison 1, N Brook 2, G Patrick 3, E van Herwijnen 4, on behalf of the LHCb Grid Group.
Large scale data flow in local and GRID environment V.Kolosov, I.Korolko, S.Makarychev ITEP Moscow.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
LCG-France, 22 July 2004, CERN1 LHCb Data Challenge 2004 A.Tsaregorodtsev, CPPM, Marseille LCG-France Meeting, 22 July 2004, CERN.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
3 Sept 2001F HARRIS CHEP, Beijing 1 Moving the LHCb Monte Carlo production system to the GRID D.Galli,U.Marconi,V.Vagnoni INFN Bologna N Brook Bristol.
LHCb Applications and GRID Integration Domenico Galli Catania, April 9, st INFN-GRID Workshop.
November 7, 2001Dutch Datagrid SARA 1 DØ Monte Carlo Challenge A HEP Application.
Computing Infrastructure Status. LHCb Computing Status LHCb LHCC mini-review, February The LHCb Computing Model: a reminder m Simulation is using.
SLICE Simulation for LHCb and Integrated Control Environment Gennady Kuznetsov & Glenn Patrick (RAL) Cosener’s House Workshop 23 rd May 2002.
Status of LHCb-INFN Computing CSN1, Catania, September 18, 2002 Domenico Galli, Bologna.
Jean-Yves Nief CC-IN2P3, Lyon HEPiX-HEPNT, Fermilab October 22nd – 25th, 2002.
Cosener’s House – 30 th Jan’031 LHCb Progress & Plans Nick Brook University of Bristol News & User Plans Technical Progress Review of deliverables.
8th November 2002Tim Adye1 BaBar Grid Tim Adye Particle Physics Department Rutherford Appleton Laboratory PP Grid Team Coseners House 8 th November 2002.
Nick Brook Current status Future Collaboration Plans Future UK plans.
1 DIRAC – LHCb MC production system A.Tsaregorodtsev, CPPM, Marseille For the LHCb Data Management team CHEP, La Jolla 25 March 2003.
LHCb and DataGRID - the workplan for 2001 Eric van Herwijnen Wednesday, 28 march 2001.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
ATLAS and GridPP GridPP Collaboration Meeting, Edinburgh, 5 th November 2001 RWL Jones, Lancaster University.
Results of the LHCb experiment Data Challenge 2004 Joël Closier CERN / LHCb CHEP’ 04.
MAGDA Roger Jones UCL 16 th December RWL Jones, Lancaster University MAGDA  Main authors: Wensheng Deng, Torre Wenaus Wensheng DengTorre WenausWensheng.
Status of the LHCb MC production system Andrei Tsaregorodtsev, CPPM, Marseille DataGRID France workshop, Marseille, 24 September 2002.
LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.
29 May 2002Joint EDG/WP8-EDT/WP4 MeetingClaudio Grandi INFN Bologna LHC Experiments Grid Integration Plans C.Grandi INFN - Bologna.
The ALICE short-term use case DataGrid WP6 Meeting Milano, 11 Dec 2000Piergiorgio Cerello 1 Physics Performance Report (PPR) production starting in Feb2001.
WP8 Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid WP8 Meeting, 16th November 2000 Glenn Patrick (RAL)
1 LCG-France sites contribution to the LHC activities in 2007 A.Tsaregorodtsev, CPPM, Marseille 14 January 2008, LCG-France Direction.
…building the next IT revolution From Web to Grid…
Author: Andrew C. Smith Abstract: LHCb's participation in LCG's Service Challenge 3 involves testing the bulk data transfer infrastructure developed to.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
LHCb-ATLAS GANGA Workshop, 21 April 2004, CERN 1 DIRAC Software distribution A.Tsaregorodtsev, CPPM, Marseille LHCb-ATLAS GANGA Workshop, 21 April 2004.
UK Grid Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid Prototype and Globus Technical Meeting QMW, 22nd November 2000 Glenn Patrick (RAL)
Grid Glasgow Outline LHC Computing at a Glance Glasgow Starting Point LHC Computing Challenge CPU Intensive Applications Timeline ScotGRID.
Computing R&D and Milestones LHCb Plenary June 18th, 1998 These slides are on WWW at:
BaBar and the GRID Tim Adye CLRC PP GRID Team Meeting 3rd May 2000.
2 Sep 2002F Harris EDG/WP6 meeeting at Budapest LHC experiments use of EDG Testbed F Harris (Oxford/CERN)
Large scale data flow in local and GRID environment Viktor Kolosov (ITEP Moscow) Ivan Korolko (ITEP Moscow)
W.A.Wojcik/CCIN2P3, Nov 1, CCIN2P3 Site report Wojciech A. Wojcik IN2P3 Computing Center URL:
DIRAC Project A.Tsaregorodtsev (CPPM) on behalf of the LHCb DIRAC team A Community Grid Solution The DIRAC (Distributed Infrastructure with Remote Agent.
1 LHCb computing for the analysis : a naive user point of view Workshop analyse cc-in2p3 17 avril 2008 Marie-Hélène Schune, LAL-Orsay for LHCb-France Framework,
CLRC Grid Team Glenn Patrick LHCb GRID Plans Glenn Patrick LHCb has formed a GRID technical working group to co-ordinate practical Grid.
ALICE RRB-T ALICE Computing – an update F.Carminati 23 October 2001.
GAG meeting, 5 July 2004, CERN1 LHCb Data Challenge 2004 A.Tsaregorodtsev, Marseille N. Brook, Bristol/CERN GAG Meeting, 5 July 2004, CERN.
L. Perini DATAGRID WP8 Use-cases 19 Dec ATLAS short term grid use-cases The “production” activities foreseen till mid-2001 and the tools to be used.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
BaBar & Grid Eleonora Luppi for the BaBarGrid Group TB GRID Bologna 15 febbraio 2005.
Grid Computing at NIKHEF Shipping High-Energy Physics data, be it simulated or measured, required strong national and trans-Atlantic.
LHCb computing model and the planned exploitation of the GRID Eric van Herwijnen, Frank Harris Monday, 17 July 2000.
Moving the LHCb Monte Carlo production system to the GRID
SAM at CCIN2P3 configuration issues
LHCb Computing Model and Data Handling Angelo Carbone 5° workshop italiano sulla fisica p-p ad LHC 31st January 2008.
Dagmar Adamova (NPI AS CR Prague/Rez) and Maarten Litmaath (CERN)
D. Galli, U. Marconi, V. Vagnoni INFN Bologna N. Brook Bristol
LHCb Distributed Computing and the Grid V. Vagnoni (INFN Bologna)
LHC Data Analysis using a worldwide computing grid
Gridifying the LHCb Monte Carlo production system
Status and plans for bookkeeping system and production tools
Short to middle term GRID deployment plan for LHCb
Production client status
The LHCb Computing Data Challenge DC06
Presentation transcript:

LHCb Data Challenge in 2002 A.Tsaregorodtsev, CPPM, Marseille DataGRID France meeting, Lyon, 18 April 2002

LHCb – experiment to study CP violation in the beauty system : One of the LHC experiments at CERN ; ~450 participants from ~50 labs and institutes ; ~1 PB of data per year ; ~5 Tier1 Centers, ~10 Tier2 centers LHCb

LHCb DC 2002 Dates: 2 periods 3-30 June and 26 Aug – 22 Sep ; ~ CPU dedicated at CERN ; ~ CPU will be available outside CERN ; Sites participating: CC/IN2P3, Bologna, RAL, Oxford, Bristol, Edinburgh, NIKHEF, … CC/IN2P3 alone: ~50 Linux CPU’s ; ~3-4 TB of data to be produced.

LHCb DC 2002(cont’d) Program : New data model validation with high volume data new event model; persistancy format (ZEBRA  Root) ; Production : simulation (FORTRAN) + reconstruction(C++/Gaudi) in one job; various event types (physical background, special channels, etc) ; Volume : ~15 TB of data ; Data are to be shipped to CERN.

LHCb DC 2002(cont’d) Tools to be used : Setting LHCb software environment at various sites ; Software installation toolkits with precompiled binaries ; A set of interconnected servlets to capture job information and to submit jobs remotely ; Monitor job status using PVSS based tools ; Prototypes of new data management databases ; bbftp for data transfer to CERN/Castor store ; Data quality checking tools based on the LHCb Analysis framework.

DC vs DataGRID This are not DataGRID tests ! Nevertheless - there are DataGRID components that can be used: remote job submission to some centres (CC/IN2P3, RAL, …) data moving with GDMP : e.g. CC/IN2P3  CERN ; GDMP tests are in progress ; direct GDMP/GRIDFTP access to HPSS and Castor is necessary: SE’s are limited; efficiency matters. bookkeeping with Spitfire service.