X>2 & SRC May 3rd – May 10th, 2011 Xiaohui Zhan Argonne National Lab.

Slides:



Advertisements
Similar presentations
Preparing the Big Bite Hadron Detector Package Gordon Lott, Virginia Tech Mentor: Douglas Higinbotham All the signals from the PMTs are sent via cable.
Advertisements

Run Plan Document E04-007: Threshold Pion Production.
Navaphon Muangma (Tai) “SRC Weekly Meeting”, June 19, 2011 SRC Weekly Meeting June 19, 2012  Revisit Optics for LHRS,  LHRS Timing, RHRS Timing  BigBite.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
/3024/ SUN MON TUE WED THU FRI SAT JANUARY 2011 February 2011 SMTWTFS
Short Range Correlations E07006 Run coordinator report SRC-E07006.pdf SRC-E07006.pptx.
Jin Huang M.I.T. For Transversity Collaboration Meeting Sept 24, JLab.
Yi Qiang May 11,  The last week of E and E  Finished the productions with 3-pass and 2- pass beam with abundant statistics.  BigBite.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
K0 meeting 2007/10/17 Taito Kawasaki. ~ 10/8 (Mon) : Prepare for experiment 10/9 (Tue) : Beam on (1.0 GeV mode) | 9 days, 18 shifts | Normal run : 31.
Overview of also works.
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
Run Coordinator Report February 5 to 8 Stepan Stepanyan JLAB 1.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
5 Day Forecast Mon Tues Wed Thu Fri.
GANTT CHARTS Example Example Example Example text Tasks Example 1
Summary of Traffic Conditions I210-E
Mon – 2Tue – 3Wed – 4Thu - 5Fri - 6Sat - 7Sun - 8 Mon – 9Tue – 10Wed – 11Thu - 12Fri – 13Sat – 14Sun -15 Mon – 16Tue – 17Wed – 18Thu - 19Fri – 20Sat –
Time Revision.
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
MON TUE WED THU
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST SEPTEMBER
Logo Calendar – January 2012 TO DO LIST 01/04/2012 Example TO DO LIST
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
2017 Jan Sun Mon Tue Wed Thu Fri Sat
ANNUAL CALENDAR HOLIDAYS JANUARY FEBRUARY MARCH APRIL MAY JUNE
HOLIDAYS ANNUAL CALENDAR JANUARY FEBRUARY MARCH APRIL MAY JUNE
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Jan Sun Mon Tue Wed Thu Fri Sat
HOLIDAYS ANNUAL CALENDAR JANUARY FEBRUARY MARCH APRIL MAY JUNE
2008 Calendar.
S M T W F S M T W F
June 2018 Seahawk Cross Country SUMMER RUNNING Sun Mon Tue Wed Thu Fri
Gep/SANE this week – quick overview
January MON TUE WED THU FRI SAT SUN
Sun Mon Tue Wed Thu Fri Sat
2 0 X X s c h e d u l e 1 MON TUE WED THU JANUARY 20XX FRI SAT SUN MEMO.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Calendar
Calendar – 2010 (October, November & December)
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
Sun Mon Tue Wed Thu Fri Sat
1/○~1/○ weekly schedule MON TUE WED THU FRI SAT SUN MEMO
January MON TUE WED THU FRI SAT SUN
S M T W F S M T W F
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
June 2017 Seahawk Cross Country SUMMER RUNNING Sun Mon Tue Wed Thu Fri
Sun Mon Tue Wed Thu Fri Sat
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
WEB PAGES: Tables Welcome Back !.
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
June 2019 Seahawk Cross Country SUMMER RUNNING Sun Mon Tue Wed Thu Fri
Run Coordinator Report for PVDIS (E08-011)
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
Thursday 30th September De-bunching test
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
2008 Calendar.
S M T W F S M T W F
S M T W F S M T W F
1 January MON TUE WED THU FRI SAT SUN MEMO 2 February MON TUE WED THU FRI SAT SUN.
Presentation transcript:

X>2 & SRC May 3rd – May 10th, 2011 Xiaohui Zhan Argonne National Lab

 May 3 rd (Tue.): ◦ Continue production at Kin 3.1 (L) and Kin 6.5 (R). ◦ Proceed to Kin 4.2 after beam study, smooth production. ◦ CODA crash, right Q1 tripped once but recovered soon. ◦ Network problem for LeCroy HV IOC. ◦ Fixed the R-HRS movement issue.  May 4 th (Wed.): ◦ Production at Kin 4.2. ◦ Bull’s eye scan, proceed to Kin 4.1. ◦ Change to Kin 5.05 ◦ IOC values & Dipole NMR problem.

 May 5 th (Thu.): ◦ Beam study, access to move BB spectrometer for the prepare of SRC. ◦ Change to Kin 5.0, put sieve in for optics. Preliminary analysis shows sieve hole on right arm (distorted optics due to Q3) ◦ Sieve out and continue production at Kin 5.2. ◦ No major issues.  May 6 th (Fri.): ◦ Finish production at Kin 5.2. ◦ Change to Kin 3.1 and finish. ◦ Change to Kin 6.5 (last setting). ◦ HRS magnet control frozen. ◦ NMR lock issue.

 May 7 th – 8 th (Sat. – Sun.): ◦ Continue production at Kin 6.5 ◦ CODA rate issue due to loose trigger cable.

 May 8 th (Sun.): ◦ Switch over to SRC from 10am. ◦ Beam pass change: 3->4 ◦ Target warm/Configuration change ◦ HAND/BB cosmics tests ◦ Slanted Carbon run to check doubles ◦ Low current BPM/BCM test over night (ALEX) ◦ Target Vacuum problem.

 May 9 th (Mon.): ◦ Beam study ◦ Target change/cool down (4He/LD). ◦ Set kinematics L-HRS 3.61GeV/c, R-HRS GeV/c ◦ Left Q1 polarity stuck when trying to ramp it up after the target cool down. ◦ R-HRS timing shifts by 60ns, investigation on going…  May 10 th (Tue.): ◦ MCC shifts Thursday’s beam study to today (9am – 1pm), both halls have magnets problem. ◦ Controlled access for techs to fix left Q1 ◦ R-HRS timing investigation continues(?)

 Spectrometer pointing with optics ~0.5 hr.  More carbon data ~1hr to check detectors.  20 cm 4He with 4uA: check and production. Many thanks to: Howard, Heidi, Jack, Dave, Alex, Bob, …