Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, 2006 1 EVLA Front-End CDR On the Sky Tests.

Slides:



Advertisements
Similar presentations
May 22/ SAGE Meeting1 EVLA Hardware Systems: Status and Prognosis Rick Perley.
Advertisements

14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
Calibration Ron Maddalena NRAO – Green Bank November 2012.
Rick PerleyEVLA Advisory Committee Meeting December 14-15, EVLA Hardware Testing Rick Perley With much essential help from Barry Clark, Ken Sowinski,
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Integrated Receivers.
Lisa LockeEVLA Front-End CDR – S, X & Ku-Band Receivers April 24, EVLA Front-End CDR Plans for S (2-4), X (8-12) & Ku (12-18 GHz) Receiver Bands.
The WVR at Effelsberg Alan RoyReinhard Keller Ute TeuberDave Graham Helge RottmannWalter Alef Thomas Krichbaum.
BDT Radio – 1b – CMV 2009/09/04 Basic Detection Techniques 1b (2009/09/04): Single pixel feeds Theory: Brightness function Beam properties Sensitivity,
BDT Radio – 2b – CMV 2009/10/09 Basic Detection Techniques 2b (2009/10/09): Focal Plane Arrays Case study: WSRT System overview Receiver and.
Rick PerleyEVLA Advisory Panel Meeting May , EVLA Technical Performance Rick Perley With much essential help from Barry Clark, Ken Sowinski,
ATA Antennas Feeds and Systems NSF Review 8/05/08 Jack Welch.
Prospects for High-Frequency Calibration with the SMA Dual-IF/Receiver System Todd R. Hunter, Jun-Hui Zhao (CfA) Sheng-Yuan Liu, Yu-Nung Su, Vivien Chen.
Ninth Synthesis Imaging Summer School Socorro, June 15-22, 2004 Cross Correlators Walter Brisken.
Offset Quadruple-Ridge Orthomode Transducer, Mode Splitter/Combiner
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
AuthorMeeting Title Date 1 EVLA Systems PDR Receivers/Feeds Daniel (Mert) MertelyEVLA System PDR:Receivers/Feeds 28 November, 2001.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
Chuck KutzEVLA Front-End CDR – Low Frequency Receivers April 24, EVLA Front-End CDR EVLA Low Frequency Receiver Capability.
Rick PerleyNSF Mid-Project Review May , EVLA Technical Performance Rick Perley With much essential help from Barry Clark, Ken Sowinski, Vivek.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Emmanuel Momjian (NRAO)
Raman Research Institute, Bangalore, India Ravi Subrahmanyan (RRI, Bangalore) Ron Ekers & Aaron Chippendale (CAS) A Raghunathan & Nipanjana Patra (RRI,
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 9/25/2012Prototype Review Meeting.
Tenth Summer Synthesis Imaging Workshop University of New Mexico, June 13-20, 2006 Antennas in Radio Astronomy Peter Napier.
EVLA Overall System Specifications Rick Perley EVLA Project Scientist.
R. HaywardEVLA Feeds CDR - System Requirements 17 Feb EVLA Feeds CDR System Requirements.
Background and Status of the Water-Vapour Radiometer at Effelsberg A. Roy U. Teuber R. Keller.
R. HaywardEVLA Front-End CDR - System Requirements 24 April EVLA Front-End CDR Overview & System Requirements.
Paul HardenEVLA LO-IF CDR May 17, IF Subsystem Specs & Measured Test Data.
Introducing the EVLA NRAO Postdoctoral Symposium, 29 April-1 May 2009 Michael P. Rupen Project Scientist for WIDAR.
April 19, 2007 EVLA Update1 The EVLA Project An Update Rick Perley National Radio Astronomy Observatory.
Jim RuffAntennas & Feeds PDR 2/12/02 1 Antennas & Feeds Mechanical Design Feed Cone Feed Mounting Horn Fabrication.
1 SAGE Committee Meeting – December 19 & 20, 2008 National Radio Astronomy Observatory EVLA Goals, Progress, Status, and Projections Rick Perley Mark McKinnon.
1 EVLA System Commissioning Results EVLA Advisory Committee Meeting, March 19-20, 2009 Rick Perley EVLA Project Scientist.
Rick PerleyEVLA Advisory Committee Meeting September 6-7, 2007 EVLA Antenna and Array Performance Rick Perley.
Dan MertelyEVLA Front-End CDR – C-Band Receiver April 24, EVLA Front-End CDR C-Band (4-8 GHz) EVLA Receiver.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Q, Ka, K, Ku & X-Band Receivers Backup Slides.
Sanjay BhatnagarEVLA Advisory Committee Meeting May 8-9, EVLA Algorithm Research & Development Progress & Plans Sanjay Bhatnagar CASA/EVLA.
Thoughts on the Design of a WVR for Alan Roy (MPIfR) the Twin Telescope at Wettzell.
Observing Strategies at cm wavelengths Making good decisions Jessica Chapman Synthesis Workshop May 2003.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
2005 October 17East Coast Geodetic VLBI Meeting1 Instrumental effects in geodetic VLBI Brian Corey (with copious cribbing from Alan Rogers’s 1991 Chapman.
Paul Harden VLA Veteran EVLA LO-IF PDR 22 January EVLA IF/LO EVLA “LOW BAND” CONVERTERS For 4/P/L/S/C and Ku Bands.
Author EVLA Feed & FE PDR 12/13 Feb, EVLA Receivers PDR (4m, P,) L, S, C BAND RECEIVERS Daniel (Mert) Mertely.
Atmospheric phase correction at the Plateau de Bure interferometer IRAM interferometry school 2006 Aris Karastergiou.
Q, Ka, K, Ku & X-Band Receivers
R. HaywardEVLA Feeds CDR – Project Budget & Schedule 17 Feb EVLA Feeds CDR Project Schedule & Budget.
Rick PerleyEVLA Advisory Committee Meeting December 14 – 15, EVLA `Descoping’ Options Rick Perley.
Chuck KutzEVLA Front-End CDR – LO/IF System April 24, EVLA Front-End CDR EVLA Front-Ends and the EVLA LO/IF System.
Rick PerleyEVLA Phase II Definition Meeting Aug 23 – 25, The Expanded Very Large Array Phase II Baseline Plan and Constraints.
Rick PerleyEVLA Feeds CDR 17 February Performance of the L-Band Feed Rick Perley.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
10 January 2006AAS EVLA Town Hall Meeting1 The EVLA: A North American Partnership The EVLA Project on the Web
Transition Observing and Science EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
ngVLA Receiver/Feed Options: Overview
Imaging issues Full beam, full bandwidth, full Stokes noise limited imaging Algorithmic Requirements: –PB corrections: Rotation, Freq. & Poln. dependence,
C-Band Feed Design and Prototype Tests
EVLA Availability - or - When Can I Use It?
Polarization Calibration
Rick Perley National Radio Astronomy Observatory
EVLA M/C Software PDR, 14 May 2002
EVLA Advisory Committee Meeting
Terry Cotter LO/IF Group Leader
Science Commissioning
EVLA Advisory Committee Meeting System Status
Prototype Correlator Testing
Feed & Front End PDR—Sys. Reqts
System Specifications Lab Tests
EVLA Technical Performance
Presentation transcript:

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, EVLA Front-End CDR On the Sky Tests

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, Proof of the Pudding … Engineering can’t rest until the scientists are happy! To have happy scientists, the telescope performance must meet the basic requirements. Extensive testing is ongoing to test on-the- sky performance.

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, System Temperatures Hot/Cold load tests done at L, C, K, and Q bands. For L and C, cold load was on sky – requires spillover assumption. For K and Q, liquid nitrogen cold load permits full calibration. For all bands, sky dips from 90 to 8 degrees done to measure spillover contribution.

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, Tsys Results: L and C Bands L-Band (antenna 13,with prototype horn). C-Band (antenna 14, using VLBA polarizer) –At 4850 MHz, Tsys = 23K Freq (MHz)Tsys

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, C-Band Variation with Elevation C-Band Tip Results Spillover contribution varies very little for elevations above 20 degrees. EVLA spillover below 20 degrees greater than narrowband VLA feed.

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, L-Band Elevation Dependence EVLA L-Band system has greatly superior elevation performance!

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, System Temperatures K and Q Bands On antenna 14, a complete set of measurements were possible. Tsys is for the zenith, under dry conditions. Freq.TrTsys

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, L-Band Polarization Requirements are set to give a spurious linear polarization of <5% The major spurious polarization contribution is due to the sum of two complex `D’ terms: R rl = I(D r1 + D* l2 ) The `D’ value is due to amplitude and phase imbalances. The sum can be made close to zero with good design. (But small |D| is better!)

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, L-Band Results Antennas with VLA OMT. Red = on-sky measurements Blue = Prediction from Lab measurements Spike near 1450 MHz due to ‘suck- outs’ in VLA OMT.

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, More Results Antennas 14 x 16. Higher polarization on-sky is expected, as contribution of antenna itself is not in lab measurements. High values near 1460 MHz due to VLA polarizer, and will be eliminated with new design

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, Bandpass Stability Requirements are that bandpass amplitude be stable to.01% over timescales of 1 hour, on frequency scales < 0.1% of the RF frequency. Bandpass phase stability better than degrees on same scales.

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, VLA Amplitude Differential Hourly Snapshots VLA antenna 17 amplitude. Ripple due to waveguide reflections. Magnitude ~ 0.5% Typical for all VLA antennas. RCP LCP

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, VLA Phase Showing VLA ripple in phase. Magnitude ~ 0.5 degrees.

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, EVLA Antenna 18 Amplitude Results Amplitude stability excellent. No sign of VLA’s 3 MHz ripple. Full range is 0.4%. Away from baseband edge, range is ~.05%. Variation likely due to VLA baseband filter.

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, EVLA Antenna 18 Phase Hourly observations of bandpass at X-band. Mean bandpass removed. BW is ~10 MHz Phase peak range 0.2 degrees. Away from baseband edge, phase range is 0.04 degrees. Instability origin unclear, but unlikely to be FE. RCP LCP

Rick PerleyEVLA Front-End CDR – On the Sky Tests April 24, Some Conclusions Tsys meeting (or beating!) specs at all bands. L-band elevation performance superior to VLA. –Other bands elevation performance acceptable. L-band cross-polarization from hybrid looks good – but full frequency range tests needed with new OMT in place. Bandpass shape/stability much better than VLA, but not at spec level yet. –Limiting factor likely VLA’s baseband filters. Final tests must wait for WIDAR correlator. Scientists are (or will be) happy!