SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011.

Slides:



Advertisements
Similar presentations
M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
Advertisements

Lattice Status SuperB Project Workshop SLAC, October 6-9, 2009 Yuri Nosochkov for the SuperB Lattice Team Major recent updates by P. Raimondi and S. Sinyatkin.
SuperB Damping Rings M. Biagini, LNF-INFN P. Raimondi, SLAC/INFN A. Wolski, Cockroft Institute, UK SuperB III Workshop, SLAC, June 2006.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Super B-Factory Workshop, Hawaii, April 20-22, 2005 Lattice studies for low momentum compaction in LER M.E. Biagini LNF-INFN, Frascati.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
IR summary M. Sullivan Nov. 3, 2011 JLAB MEIC IR workshop.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility EIC Collaboration Meeting, Hampton University, May 19-23,
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
SuperB Lattice Studies M. Biagini LNF-INFN ILCDR07 Workshop, LNF-Frascati Mar. 5-7, 2007.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
D. Trbojevic, N. Tsoupas, S. Tepikian, B. Parker, E. Pozdeyev, Y. Hao, D. Kayran, J. Beebe-Wang, C. Montag, V. Ptitsyn, and V. Litvinenko eRHIC and MeRHIC.
1 M. Sullivan IR update IR Update M. Sullivan for the 3 rd SuperB workshop SLAC June14-16, 2006.
Joint Belle SuperB Background Meeting Feb 9 – 10, 2012 SuperB SR bkgds 1 SR Backgrounds in SuperB M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni,
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Compensation of Detector Solenoid G.H. Wei, V.S. Morozov, Fanglei Lin JLEIC Collaboration Meeting Spring, 2016.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Initial Study of Synchrotron Radiation Issues for the CEPC Interaction Region M. Sullivan SLAC National Accelerator Laboratory for the CEPC14 Workshop.
SuperB Meeting XVII May 28 – June 2, 2011 IR design status 1 IR Design Status and Update M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni,
MDI and head-on collision option for electron-positron Higgs factories
M. Sullivan for the SLAC SuperB Workshop Jan , 2009
The Interaction Region
SuperB General Meeting XI
Accelerator R&D for the Super-B Factory
Large Booster and Collider Ring
E. Paloni, S. Bettoni, R. Pantaleo, M Biagini, et al.
First Look at Nonlinear Dynamics in the Electron Collider Ring
The PEP-II Interaction e+e- Factories Workshop
Electron Polarization In MEIC
Compensation of Detector Solenoid with Large Crossing Angle
The design of interaction region
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
LHC (SSC) Byung Yunn CASA.
Interaction Region Design Options e+e- Factories Workshop
SuperB CDR Machine P. Raimondi for the SuperB Team Paris, May 9, 2007.
Accelerator R&D Results from the B-factory
EIC Accelerator Collaboration Meeting
Summary of Washington DOE Review
IR Lattice with Detector Solenoid
Beam-Beam Effects in High-Energy Colliders:
SuperB IRC Meeting Frascati, Nov. 13th 2007
BINP Tau-Charm Project Update E.Levichev, BINP, Novosibirsk
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
SuperB Accelerator Overview
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Electron Collider Ring Magnets Preliminary Summary
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Update on JLEIC Electron Ring Design
Some of the Points Raised During my JLAB Visit
Compensation of Detector Solenoids
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
Progress Update on the Electron Polarization Study in the JLEIC
IR/MDI requirements for the EIC
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Upgrade on Compensation of Detector Solenoid effects
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

SLAC Accelerator Development Program: SuperB Mike Sullivan OHEP Accelerator Development Review January 24-26, 2011

Outline The SuperB design Where SLAC expertise has and can contribute Summary SLAC Accelerator Development Program Page 2

SuperB Design SuperB is an e+e- collider running at the Upsilon 4S resonance The design luminosity is 1  cm -2 s -1 (50 times higher) This is achieved through: –Ultra low-emittance beams –Very small  y * values –Beam currents and bunch charge very similar to PEP-II and KEKB –Bunch length similar to present day B-factories (very important for HOM issues) –Magnetic crabbed waist at the IP Can also run at the Tau/Charm region with luminosity Electron beam is polarized

e+e- Colliders

IP 66 mrad RF HER arc LER arc HER arc LER arc e- e+ Circ = 1254 m SuperB Layout & Geometry

Projected peak and integrated luminosity

Superb Parameters

SLAC Contributions Interaction Region design –SLAC people have been involved in the design of the interaction region of SuperB since This has been with close cooperation from people at INFN Pisa and INFN Frascati as well as groups from the detector community. Lattice –Some of the lattice topics we have studied are dynamic aperture, spin rotator insertions, geometric constraints and detector solenoid compensation. RF parameters, HOM studies and stability –We have studied the RF parameters needed to sustain the required beam currents. They have also looked into how we can use the PEP-II RF systems in the SuperB design. Polarization –We have put together a detailed design for the polarimeter needed to measure the longitudinal polarization of the stored electron beam.

Interaction Region The design of the Interaction Region is one of the most difficult and crucial aspects of the collider A close association with the accelerator and the detector teams is a vital part of putting together a design that will work In close collaboration with INFN Frascati and INFN Pisa we have evolved an Interaction Region design that satisfies the accelerator and detector requirements

SuperB Interaction Region Note the expanded left-hand scale m

Interaction Region: Details One of the most challenging aspects of the SuperB IR design is the very low beta functions at the IP –  X * is 2.6 and 3.2 cm (PEP-II was cm)  10 –  Y * is 0.25 and 0.21 mm (PEP-II was 8-12 mm)  50 –Light source rings never squeeze the beam down this much –The ILC design has similar values (2 cm and 0.4 mm) but that is a single pass machine These very low values force the final focusing magnets to be as close as possible to the collision point –This puts all of the final focus magnets inside the detector

Interaction Region: Details Other design constraints –The detector needs as much total solid angle as the accelerator can give it (300 mrad cones – same as PEP-II) –The detector beam pipe must be no larger than 10 mm radius in order to maximize the physics We have incorporated a special dual quadrupole design in order to meet the design requirements –These magnets are super-conducting In addition, we have permanent magnets in the small region between the primary magnets and the junction of the beam pipes

Some of the Main IR Design Issues Control of the SR backgrounds –This drives much of the design as background rates can vary by orders of magnitude with seemingly small changes in design Control of the local HOM power Developing a cryostat design compatible with detector acceptance and magnet requirements Developing magnet designs that can perform to the demanding specs of the accelerator Developing a complete assembly and access plan

Some IR Related Operational Issues Vibration control of the final focus elements –It is vital to understand this issue and adopt adequate correction mechanisms. –We have already started work on this issue and, in particular, with related aspects to the ILC IR design. –Some present light source experience will help but we have to bring two very small beams into steady, reliable collision Luminosity measurement and maximization through beam position control –SuperB will need a fast, accurate luminosity detector –We have developed a preliminary design for a fast luminosity feedback (ala PEP-II system) to keep the beams in collision

Lattice Work We have worked closely with the Italians (INFN Frascati) to develop a working lattice for the SuperB accelerator (2 examples) –Spin rotator sections The spin rotator sections are an integral piece of the lattice and are also lose to the IP. The matching of the spin rotator sections with the other constraints concerning the lattice near the IP (crab waist, chromaticity correction, etc.) has been a complicated balancing act. Together we have developed a realistic lattice for this area. –Solenoid compensation The compensation of the detector field is another complicated issue. The low emittance of the beams and the low coupling (The final focusing elements in the SuperB design are permanent magnets that are too close the IP to allow the detector field to be canceled by compensating solenoids. We have developed a scheme for solenoid compensation that involves rotating the PMs as well as compensating the detector field as much as possible and including skew quads and compensating solenoids located outside of the detector.

Spin Rotator Section Similar layout as in HER except that matching section is shorter to provide space for spin rotator optics. IP Y-sext X-sext V12 Match & spin rotation Crab

Solenoid compensation QS1QS3QS2QSDYQS4QSDPY Skew quads in one half-IR QS1,QS2,QS3,QS4 – at zero dispersion QSDY,QSDPY – at non-zero dispersion [  x  y ] 1/2 CCXCCYROT IP Detector solenoid QS1 V1 H1 H2 V2 Anti- solen QD0 LER HER Correctors within ±7.5 m of IP (symmetric relative to IP) QF1 QS1 V1 H1 Anti- solen H2 V2 IP QD0P

RF, HOMs, beam stability A lot of work has gone into finding the RF parameters needed to support the 1-2A beam currents of the SuperB The RF systems of PEP-II have been selected by the SuperB project. These stations delivered half of the wall plug power to the beam, one of the most efficient high- current RF systems ever built. Minimizing the ring impedence and maximizing the cavity coupling are just a couple of the constraints used to optimize the design

Phase transient We have also completed a very careful study of the phase transient induced by the ion gap in the ring current –PEP-II experience has told us that an ion gap of at least 1-2% is necessary The phase transient is now an important issue since the collision has a large crossing angle (60-66 mrad) Control of the transient difference between the two beams has become an added constraint to the selection of beam current values and number of RF stations needed for each ring

Polarization The SuperB design calls for a polarized electron beam This will significantly increase the physics potential of this accelerator We have found that the beam lifetime is too short for natural polarization to build up However, we can fill the ring from a polarized source and the beam will stay polarized as long as the depolarizing time is long enough One therefore has to stay away from depolarizing resonances

Polarization vs Beam energy With a 90% polarized injected beam and a 3.5 min. ring lifetime we can have nearly 80% polarization if we stay near the peak

Polarization Measurement Because we are constantly injecting polarized beam into the ring the measurement of the polarization of the beam becomes an interesting challenge We need to measure the polarization of each of the 978 beam bunches on a sub-minute time scale (the bunch frequency rate is over 200 MHz) The polarization measurement accuracy must be below 0.5% (at least as good as if not better than the measurement used for the SLC/SLD experiment) No one has done this

Polarimeter We will use the bend magnets in the lattice as an energy spectrometer for the compton scattered electrons By adding a port in the beam pipe, we can also capture the gammas from the compton scatter The laser crosses the beam in a shallow vertical angle

Workshops/collaborations The SuperB team has four workshops each year and this has been of enormous benefit to the design effort We are able to meet with our collaborators in Italy, exchange notes concerning design progress and brainstorm ideas to overcome newly uncovered issues Eight papers have come out of this effort over the last two years We have also been a main contributor to the writing up of the accelerator for the CDR in 2007 and for the update to the CDR (CDR2) completed last summer (2010)

Summary of what has been done The SuperB accelerator concept is quite exciting –Making a collider using very low-emittance beams, very small  * values, and high-currents (Similar to PEP-II currents) –The crab waist concept is what gives this collider the ability to achieve nearly 100 times the luminosity of present day B-factories The simultaneous control of the low-emittance beams and the high-current effects on these beams will move accelerator technology into new territory The Interaction Region – one of the crucial aspects of the design – is an interesting balancing act of conflicting requirements. The design must cleanly mesh in order to maximize the chances of success.

Conclusion SLAC and other US laboratories can make significant and lasting contributions to the SuperB accelerator while enriching and improving the accelerator program here in the U.S. The knowledge gained from getting this collider designed, built and operational will be invaluable for future accelerators Finally, the physics that will come from this collider is quite exciting!