RD’s Report Sakue Yamada May 23, 2011 2011/05/231 Sakue

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
ILD Resource Survey 2014/9/9 Y. Sugimoto 1. Committee under MEXT ILC Task Force in MEXT Academic experts committee Particle-Nuclear physics WG Members.
Keynote Workshop Charge Akiya Miyamoto, KEK 16-April-2009 ILD Software Workshop.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
Slides for Project Review 15 Dec ILD Future Colliders ILC, ILC-CLIC & Detectors ILD  VTX,LCTPC,CALICE.
J. Brau ALCPG Workshop at Snowmass August 27, Concluding Remarks 2005 ILC Physics and Detectors Workshop at Snowmass.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
State of Kansas Statewide Financial Management System Pre-Implementation Project Steering Committee Meeting January 11, 2008.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
Charge to the SiD Workshop Andy White University of Texas at Arlington.
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
ILD workshop 119 participants (including last minute registrations which are not on the WEB) 2 days of contributions lively discussions, which had to be.
WWSWWS Next steps for Detectors by F. Richard LAL/Orsay TILC08 TILC08 Joint ACFA Physics and Detector Workshop and GDE meeting on ILC, 3-6 March 2008,
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CLIC-ILC WG Oxford, Jan 10 Slide 1 CLIC – ILC General Issues WG, Update BackgroundChargeStatusPlans.
Status of the ILC Detector activities Project Advisory Committee October 20, 2008 LPNHE,Paris Sakue Yamada 1.
WWSWWS David J. Miller for WWS to ILCSC at Frankfurt, 10 May from the WorldWide Study on Physics and Detectors for ILC 1. LCWS at Stanford
World Wide Study of Physics and Detectors for a future e + e - Linear Collider David J. Miller; towards a WWS response to ILCSC/ICFA How do we propose.
Report from ILCSC Shin-ichi Kurokawa KEK ILCSC Chair GDE meeting at Frascati December 7, 2005.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
Software Common Task Group Meeting Akiya Miyamoto 6-June-2011.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
© Nano Time Limited – October 2008 Source Planning What –Analytical process that for creating procurement and supply strategies for key categories Wh y.
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Eugene October
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
Recent Development of Detector Activities for ILC CCAST07 Nov Introduction Call for LOI & mechanism of selection IDAG Benchmarks Common.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
J. Brau SiD Workshop (RAL) April 14, Recent Developments on Global Detector Coordination.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
BU610 Applied Business Research 2016 Section A (Waterloo Part-time MBA) Faculty Advisors: Mitali De Shelly Jha Kalyani Menon
Proposal for a Global Network for Beam Instrumentation [BIGNET] BI Group Meeting – 08/06/2012 J-J Gras CERN-BE-BI.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
WORKSHOP CHARGE ACFA Physics and Detector Workshop Tsukuba, Apr 17, 2009 Hitoshi Yamamoto Tohoku University.
Philip Burrows SiD Workshop, SLAC 2/03/091 Status of the SiD LoI Philip Burrows John Adams Institute Oxford University Hiro Aihara, Mark Oreglia.
Americas comments on Linear Collider organization after 2012 P. Grannis, for LCSGA – Aug. 24, 2011 ILCSC GDE.
Detector Cooperation with CLIC PAC Pohang meeting November 3, 2009 F. Richard LAL/Orsay 11/03/20091.
CLIC - CDR Status (Volume 2) Hermann Schmickler, ILCW2010.
ECFA - European Commitee for Future Accelerators Tatsuya Nakada – EPFL, Switzerland– prepared for CERN September Council presented by.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
European Agency for Development in Special Needs Education Project updates Marcella Turner-Cmuchal.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
The SiD LOI Proposed Milestones and Schedules SiD Collaboration Phone Meeting September 6, 2007 John Jaros.
ILD Technical Coordination
Brief summary of discussion at LCWS2010 and draft short term plan
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
The DBD: Outline and Scope
Update of the Detector Program for ILC Sakue Yamada March
Workshop charge F. Richard for the WWS-OC
Presentation transcript:

RD’s Report Sakue Yamada May 23, /05/231 Sakue

Outline Introduction Interim Report The detector groups IDAG monitoring Common Task groups Benchmark task force Common costing working group Cooperation with CLIC detector Plan for post2012 activity 2011/05/232Sakue

Oct. 2007: Call for LOIs was made by ILCSC Jan. 2008: Detector management was formed IDAG Mar.2008: IDAG formed, 3 LOI groups known Mar.2009: 3 LOIs submitted IDAG Summer 09: IDAG recommendation for validation and ILCSC’s approval Oct 2009: Work plan of the validated groups IDAG Mar:2009: IDAG began monitoring the progress End 2010: Interim report(being completed) End 2012: Detailed Baseline Design Report and updated physics case for ILC Now RDR 2011/05/233Sakue Time line of the LOI process How to continue

Sakue Yamada4 The European regional contact changed end January 2011 from F. Richard (LAL) to Juan Fuster (Valencia).

Interim Report The interim report is being finalized to be published in a similar form like the GDE’s interim report. It is a good time to make such a report. Readers:  ILCSC: to report the status of the detector activity  Colleague physicists and funding agencies  Ourselves: to review where we are in each activity Many people contributed in making drafts. It will be passed to the communicators. Delayed a bit. 2011/05/235Sakue

Contents of IR Physics prospect as seen at present General introduction including the history of the LOI process and on organization of the activity Activity of the validated groups on R&D and the status of preparation towards DBD Update of physics simulation since RDR (Many simulations were made for LOIs.) Activity of each common task groups Activity of SB2009 working group CLIC-ILC cooperation The length will be ~100 pages. 2011/05/236Sakue

Detector groups Both ILD and SiD groups are continuing detector R&D, design work and preparation for new simulations in view of the 9 items to be considered. E.g. R&D for critical components to demonstrate feasibility, Define baseline design including realistic support structure, holes, I/O cables, etc. Settle Push-Pull scheme Study new benchmarks Improved cost estimation 2011/05/237Sakue I understand you meet now to settle many questions to complete these works for DBD.

IDAG monitoring IDAG keeps monitoring the activities of detector groups and CTGs twice a year. IDAG met during ALCPG11 in Eugene last March. 1.discussed with the management, 2. made interviews with the detector groups, and Engineering tool CTG, 3. examined the planning of the detector groups towards DBD. (This was the major aim of the Eugene meeting.) 4. Suggested about the costing methods of the two groups. 2011/05/23Sakue

IDAG Monitoring(continued) ILD and SiD presented detailed plans for BDB. ILD described its plan and policy not to exclude possible options, while the baseline detector design for physics simulation will be fixed by Summer It was accepted by IDAG. SiD described their detailed plan for DBD contents. There was some uncertainty left about the degree of completion for each item. (They continue the effort.) 2011/05/23Sakue

General difficulty about resources Both groups stated that human resources are limited. The yet-unknown resource situation makes precise planning difficult at present. Under such environment, the both groups made their best effort for planning. 2011/05/23Sakue

IDAG recommendation on Costing Last year IDAG recommended that the two groups use a common costing method. A small working group on costing was formed, members from ILD, SiD, management,+ advisor. CLIC detectors impose another and similar boundary condition for the costing of the two detectors. GDE is much advanced about how to coordinate different costing methods in different regions. We can follow successful ideas. It is also meaningful to compare with the accelerator cost. 2011/05/23Sakue

IDAG’s comment on Cost (continued) IDAG discussed the difference of M&S costs listed in the LOIs and recommended to watch updated cost estimates in early stage. The LOI costs were premature and were not fully coordinated between the groups. Under the presently agreed method, there will be better numbers to be compared. The difference reflects the difference of the size and detector components. Interesting to see if this affects performance. There was a discussion in PAC last week, too. (How precise the cost in DBD will be ? The effect of many options in the cost ?) 2011/05/23Sakue

Quick view of the Common Task Groups MDI: They have been working on push-pull to reach a common solution between ILD and SiD. In Eugene, the final agreement was obtained that both groups will use platforms. CLIC-push-pull team will participate officially in the push- pull study. (Outcome of the request to ILCSC.) Engineering Tools: The agreement was to use EDMS, which is used by the accelerator people. More practical question was how to maintain the system and was solved. The group met with IDAG in Eugene and IDAG was happy about its activity. Sakue Yamada13

Common task groups (continued) Detector R&D: The group was interviewed by IDAG last October, where the status of R&D of the most of the major components was presented. IDAG was content with the presented progress. There are a number of spin-off of ILC originating detector R&D found in other fields and experiments. IDAG recognized this important and suggested to make a complete list of spin-off cases. This was reported to PAC by the IDAG chair, and to ILCSC by me. The same recognition was made by both PAC and ILCSC. The group is working on the report, to be ready by Summer. 2011/05/2314Sakue

Common Task Groups (continued) Software Group: This group also was interviewed by IDAG last October. The group is working effectively and IDAG was content. The group played an important role in the discussing for new benchmarks and is now preparing various tools for their simulations. It also communicates with the CLIC simulation team. Physics Group: The group lead the discussion to finalize new benchmark reactions and volunteered to make the physics chapter of DBD. (more details in later slides for new benchmark task force) The group made a significant contribution for the interim report. 2011/05/2315Sakue

Common Task Groups (continued) Next role of the physics CTG : The group will further play a major role to make the physics chapter of the DBD, which is common to the both detectors, by sharing efforts with the detector groups. (Michael Peskin volunteered to coordinate the writing of the chapter during the PEB meeting in Geneva.) The physics chapter includes update of ILC physics case from the physics volume of RDR, taking into account of the studies for LOI and the new information from LHC. The group organized a team of subject conveners, inviting more members, and preparation works will start in earnest this Summer. It will be a center of focus at the Granada LC meeting in September. The current plan can be found at: People who are interested to contribute, please contact Michael Peskin or an appropriate subject convener. 2011/05/2316Sakue

The task force for new benchmarks Member: Mikael Berggren(ILD), Tim Barklow(SiD), Akiya Miyamoto, Norman Graf (Software CTG) Michael Peskin (convener), Keisuke Fujii, Georg Weiglein (Physics CTG) Revisit the new benchmarks in view of the developing physics prospect, the resource of the detector groups and suggestion by IDAG Report was made January 2011 (can be accessed through Web.) 2011/05/23Sakue

Conclusion of the task force The two groups and the CTGs agreed: Three new process to be studied: e+e- > νν̄H, W+W-, 1 TeV Each group repeats one of the LOI GeV with the final detector configuration, and with the same event sample Beam polarization taken into account All relevant physics back grounds to be included How to produce machine background 2011/05/23Sakue

Preparation started. Various software tools are being prepared by the software CTG. T. Barklow, M. Berggren, A. Miyamoto (of the Software CTG) will generate common sample of physics events and BG events. Hope: when the detector baselines are fixed, simulation can be started with these tools. 2011/05/23Sakue

Common costing WG Following the IDAG’s suggestion, the costing WG was formed last year with experts of the both groups and an experienced advisor. Members: Henri Videau, Tomoyuki Sanuki (ILD) Marty Breidenbach, Kurt Krempetz(SiD) Sakue Yamada (management) Peter Garbincius (Advisor) Basic agreement confirmed: to use the same way of presentation as the accelerator costing, i.e. material and manpower are listed separately. For more precise details, consideration is under way. 2011/05/23Sakue

Agreements at present 1.what to include in the cost, 2.to list material cost and man-power separately, 3.to use FY2012 ILCU (like the accelerator cost), 4.to use the same unit costs for several materials. (CLIC-detectors do the same.) (So far they are Si-det, W, Iron, Stainless steel. These cover a large fraction of the cost.) 2011/05/23Sakue

Cooperation with CLIC Cooperation with CLIC detector is increasing, in view of CLIC CDR. Several members participate in the CLIC-CDR preparation. Many common efforts on going. They are essentially grass-root cooperation. Through the joint WG, we surveyed them and identified further possibilities for cooperation, e.g. a workshop of experts is being organized on pulse-powering. It is hoped that once CLIC-CDR is completed, there will be more participation from the CLIC side for ILC DBDs. (Proposition for possible items was sent from CLIC group to each ILC group.) 2011/05/2322Sakue

Plan for post 2012 phase ILCSC began planning the post 2012 phase last Summer. We welcome this. ILCSC chair, Jon Bagger, invited the detector community to comment on the CPDG document. Comments were sent by some individuals, WWS, SiD group and the detector management. We strongly wished to participate in the coming discussions to polish its content. During the last ILCSC, February 2011, more detailed discussion started. 2011/05/2323Sakue

Plan for Post 2012 (continued) ILCSC will discuss further the possibility of international consortium for the scheme after 2012 at the next meeting in Mumbai. Possibility and difficulties will be studied in each region by relevant ILCSC members by that time. Consideration for the scheme will be made after the Mumbai meeting by including members from the user community. 2011/05/23Sakue

What’s needed for us It is crucial that the detector community remain actively participating in the discussions, so that we can continue R&D/physics studies after 2012, reduce the difficulties which we have now and prepare for the project realization. Also it may be the time for us to start thinking concrete plans for our own activity after How we wish to continue ? What need to be done further ? Design of the detector with more engineering studies? 2011/05/23Sakue