ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

F. BORGNOLUTTI Oct. 16 th 2012 Winding Test plan for the MQXF Cable.
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Simona Bettoni and Remo Maccaferri, CERN Wiggler modeling Double-helix like option.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Optimisation of Roebel cable for HTS accelerator magnets
Structural design of EuCARD2 magnets
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Superconducting Large Bore Sextupole for ILC
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
EuCARD2 Magnet Status and action plan
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
FCC Week 2015Design Options for 16 T LTS Dipoles – G. Sabbi 1 Overview of Magnet Design Options for LTS Dipoles in the 16 T Range GianLuca Sabbi, LBNL.
Magnets for muon collider ring and interaction regions V.V. Kashikhin, FNAL December 03, 2009.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
Design optimization of the protection heaters for the LARP high-field Nb 3 Sn quadrupoles M. Marchevsky, D. W. Cheng, H. Felice, G. Sabbi, Lawrence Berkeley.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
ASC 2014Nb 3 Sn Block Coil Dipoles for a 100 TeV Hadron Collider – G. Sabbi 1 Performance characteristics of Nb 3 Sn block-coil dipoles for a 100 TeV hadron.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
G.A.Kirby 4th Nov.08 High Field Magnet Fresca 2 Introduction Existing strand designs, PIT and OST’s RRP are being used in the conceptual designs for two.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
D. Schoerling FCC Week Washington L. Bottura, J. van Nugteren, M. Karppinen 26/03/
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
WP6 status Paolo Fessia. Summary Status of the WP6 and change of WP coordinator Lowβ quadrupole status Corrector status Cryostat status.
SIS 300 Magnet Design Options. Cos n  magnets; cooling with supercritical Helium GSI 001 existing magnet built at BNG measured in our test facility 6.
D. Smekens. 2 Coil ID  CableCu DUMMY Cu DUMMY WST DUMMY RRP 54/61 DUMMY RRP 108/127 RRP 108/127 RRP 108/127 RRP 132/169.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
LARP Collaboration Meeting, April 26-28, 2006Gian Luca Sabbi HQ Design Study (WBS ) LARP Collaboration Meeting April 26-28, 2006 N. Andreev, E.
New options for the new D1 magnet Qingjin Xu
CERN Accelerator School Superconductivity for Accelerators Case study 3 Paolo Ferracin ( ) European Organization for Nuclear Research.
16 T Dipole Design Options: Input Parameters and Evaluation Criteria F. Toral - CIEMAT CIEMAT-VC, Sept. 4th, 2015.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
Davide Tommasini EuroCirCol WP5 : Work Distribution June 3 rd, 2015.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
Cosine-theta configurations for S.C. Dipole Massimo Sorbi on behalf of: INFN LASA & Genova Team Giovanni Bellomo, Pasquale Fabbricarore, Stefania Farinon,
HTS insert magnet design: Stack Cable Johnny Himbele, Arnaud Badel, Pascal Tixador 1.
Report from Session 2 Main Dipoles. P. McIntyre 2005 – 24T ss Tripler, a lot of Bi-2212, Je = 800 A/mm2 E. Todesco T, 80% ss 30% NbTi 55 %NbSn.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 Quench Protection of Long Nb 3 Sn Quads Giorgio Ambrosio Fermilab.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Preliminary analysis of a 16 T sc dipole with cos-theta lay-out INFN team October 2015.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Ranko Ostojic AT/MEL 1.Beam heat loads 2.Magnet design issues related to heat loads.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
Massimo Sorbi on behalf of INFN team:
WORK IN PROGRESS F C C Main Quadrupoles FCC week 2017
Winding tests on Roebel cables
16 T Cosq DIPOLE Mechanical Analysis
Development of the Canted Cosine Theta Superconducting Magnet
Segreti, Lorin, Durante 11 July 2017
16 T Nb3Sn block dipole EuroCirCol
CERN-INFN, 23 Febbraio 2017 Stato del programma 16 T Davide Tommasini.
Q0 magnet, cooling, support ideas
11 T dipole coil features and dimensions
DS11 T Transfer function, integral field and coil length
Mechanical stability and QXF coil winding
Block design status EuroCirCol
MQXF cable with RRP wires for Q2
11T Dipole for the LHC Collimation upgrade
MQXF coil cross-section status
Cross-section of the 150 mm aperture case
Presentation transcript:

ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team

Foundations Context: 16 T dipole – 4.5 K – ~10% LL margin – Nb 3 Sn – 50 mm aperture No-grading leads to too much conductors: >20,000 tons (4800 dip, 15 m, d = 8.7) Preliminary graded cos-theta designs: ~12,000 tons (not protectable!) Grading needed for block (as well!) An efficient grading: extremes strand dimensions (1.1 mm – 0.7 mm) Number of coils (manufacturing): large current, big cable (40 strands) Cables: 1.1 mm, 26 strands, 15 mm, 2 mm (~125 tons per turn) 0.7 mm, 40 strands, 15 mm, 1.25 mm (~75 tons per turn) Mechanical support: 6 mm Fresca2 = 8 mm, K not optimized Fresca2

Grading 1 – (reference) Splice room = Large cable thickness (>2.3 mm) Cu/nonCu = 1.0 both cable Protectable (50 ms, hotspot < 300 K) 19/146 turns -> 13,600 tons (217 cm²) Iop = 8395 A Gap closed 15/148 turns -> 13,300 tons (212 cm²) FCC quad remark [Ezio]: 1% less dipole field is 8 outer turns (~quantity of conductors needed for the FCC quad)

Grading 2 – (Cu/nonCu reduction 0.6) Splice room = Large cable thickness (>2.3 mm) Cu/nonCu = 0.6 inner 1.0 outer Protectable (50 ms, hotspot < 300 K) 17/122 turns -> 11,500 tons (184 cm²) Iop = 9700 A Gain ~2000 tons (~3 times the quantity of conductors for the quadrupoles!)

Grading 3 – (Cu/nonCu str. 0.5 mm) No splice room Cable 1.1 mm, 22 strands, 12.7 mm, 2 mm 0.5 mm, 48 strands, 12.7 mm, 0.9 mm Cu/nonCu = 0.6 inner 1.4 outer ms, hotspot ~ 350 K 45/98 turns -> 9,300 tons (149 cm²) Iop = 8840 A About the same quantity of conductor as GL Sabbi, same time to react* *Design study of a 16 T block-dipole for FCC» to be published in IEEE TAS

Grading 4 – (Cu/nonCu str. 0.6 mm) No splice room Cable 1.1 mm, 22 strands, 12.7 mm, 2 mm 0.6 mm, 40 strands, 12.7 mm, 1.1 mm Cu/nonCu = 0.6 inner 1.5 outer ms, hotspot ~ 300 K 37/108 turns -> 9,999 tons (159 cm²) Iop = 8760 A

Grading 5 – (Cu/nonCu str. 0.7 mm) No splice room Cable 1.1 mm, 22 strands, 12.7 mm, 2 mm 0.7 mm, 40 strands, 12.7 mm, 1.25 mm Cu/nonCu = 0.6 inner 1.5 outer ms, hotspot < 300 K 33/116 turns -> 11,000 tons (177 cm²) Iop = 8620 A

Magnet ID12345 Cables [mm]26x1.1 ; 40x0.7 22x1.1 ; 48x0.522x1.1 ; 40x0.622x1.1 ; 34x0.7 Cu/nonCu [-]1 ; 10.6 ; 10.6 ; ; 1.5 Turns [-]19 ; ; ; 9837 ; ; 116 Iop [A] Time [ms] HotSpot [K]< 300 ~350~300< 300 Weight [tons]13,60011,5009,3009,99911,000 Area 2 ap. [cm²] Is a ‘perfect’ cable the better solution for a ‘perfect’ magnet? -Why do we operate at 4.5 K instead of 4.2 K? -Where do we make the splices? And how?

From FRESCA2 No specific feedback about grading from FRESCA2 Ungraded coils No Grading options from the beginning Feedback on use of 40 strands, 1 mm in diameter : no special issues for winding (R min 45 mm) to be confirmed by coil/magnet test… Feedback on coil and tools design: Preliminary winding tests with special tools to study/define head configuration (length, angle, …), layer jump -- > Cable behavior studies relative to heat treatment : to be done as soon as possible with final cable, bare and insulated FRESCA2 splices: 2 mm thick copper box (U + wedge)

Splice requirements Min splice length = cable twist pitch Need space on each side of cables pair for: Copper stabilizer U shape + wedge Insulation Need supports to: Guide the cables to splice position Block the cables ends during winding (and reaction?) Support replaced after reaction by copper stabilizer, insulation and soldering tools 10

Splice options In the straight section Gap between the two conductors blocks (4 x cable thickness?) Gap between layers In the heads Experience on bended splices ? Small radius  short length  need for longer (flared) heads  bigger outer diameter External splices/connections

Extra – Fresca2

Extra – D20

Extra – HD2