2004/06/0 2 Market Operations Standing Committee of the IMO1 Small Facilities - Technical Requirements Rhonda Wright.

Slides:



Advertisements
Similar presentations
Market Operations Standing Committee Change Management – Market Rule Amendment Update John MacKenzie, Supervisor Market Rules 19 Oct 2005.
Advertisements

Brookfield Renewable Energy Group. Focusing on Renewable Power Generation and Transmission Conceptual discussion how to integrate renewable resources under.
JANUARY 14-15, 2014 | NEPOOL MARKETS COMMITTEE Matthew Brewster MARKET DEVELOPMENT | Conceptual design.
Distributed Generation (DG)
Revenue Metering. 2 The Settlements Process Transfer Funds $ $ Invoice Participants Reconcile Markets Gather and Process Metering Data.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Special Protection Systems - Market Rule Amendment Submission Presentation to: Market Operations Standing Committee Barbara Reuber, Regulatory Affairs.
LOGO Ho Chi Minh - November Developments in Energy Sector And Target I. Power Development Plan (Master Plan VII) approved by Vietnam.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures
1 Adjusting the “Dispatch Instructions” to the Defined Metering Point (DMP). “Functional Deferral 6 (FD-06)” Market Operations Standing Committee (MOSC)
Information Dissemination Strategy An Update Presenter: Bruce Locke.
Small Generator Interconnection Workshop Goals and Potential Midwest Interconnection Strategy Carmel, Indiana June 15, 2006 Presented by Brad Johnson ACN.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
LPGRR044 Distributed Generation (DG) Profile Segment Implementation Plan.
8 Halswell St PO Box Thorndon WELLINGTON New Zealand While Strata Energy.
1 Communication Plan for Change in DG Registration Threshold DG Registration Threshold > 1 MW –ERCOT Market Participant –Non-modeled RARF Aggregated unregistered.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
CMSC Rules Changes under Consideration Market Operations Standing Committee December 3, 2003 PUBLIC.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Distributed Generation Registration Threshold Protocols Section 16.5 (5) ERCOT Staff DER Workshop June 18, ERCOT Public.
Public Market Surveillance Panel Consultation on CMSC Issues Related to Constrained off Payments to Generators and Imports Market Operations Standing Committee.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
California Independent System Operator Joint Agency Energy Action Plan Meeting Generation Interconnection Queuing & Streamlining Dennis Peters, Lead Interconnection.
DG Toronto Hydro’s Perspective Task Force on Distributed Generation Richard Lü VP, Environment, Health & Safety March 5, 2003.
Market Operations Standing Committee of the IMO Market Operations Standing Committee April 23, 2003.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Market Operations Standing Committee of the IMO Market Operations Standing Committee September 22, 2003.
1 Confidential The information contained in this presentation is for the exclusive and confidential use of the recipient. Any other distribution, use,
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
PJM © 2006 The Institute for Regulatory Policy Studies Illinois State University Conference May 12, 2006 Jeff Bladen PJM Interconnection.
Task XI Time of Use Pricing and Energy Use for Demand Management Delivery Task Status Report April 2006 Richard Formby.
Demand Response as Capacity in New York National Association of Regulatory Utility Commissioners Winter Committee Meetings Washington, DC February 17,
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
14 Jan 2004Market Operations Standing Committee1 Special Protection Systems: Operational and Compensation Issues.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
EXAMINING NEW BUSINESS MODELS WITH LOCAL NETWORK CHARGES AND VIRTUAL NET METERING Ed Langham, Research Principal 15 th September 2015.
Sep 22, 2003Market Operations Standing Committee of the IMO1 Change Management: Market Rules Update John MacKenzie, IMO.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Jun 18, 2003Market Operations Standing Committee of the IMO1 Market Pricing Integrated Proposal: Consequences, Trade-Offs & Implementation.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
RMS Update to TAC October 5, RMS Activity Summary 2008 Test Flight Schedule Update on TAC directive relating to identifying issues with net metering.
Distributed Generation Registration June 30, 2008.
Market Operations Standing Committee of the IMO Market Operations Standing Committee October 22, 2003.
Revisions to the Information Confidentiality Catalogue Presentation to the Market Operations Standing Committee April 23, 2003.
Market Operations Standing Committee of the IMO Market Operations Standing Committee June 3, 2003.
Market Operations Standing Committee March 5, 2003.
Market Operations Standing Committee MOSC October 19, 2005 Pat Doran.
Market Evolution Program. 2 Topics Overview of the Market Evolution Program Consultation Plan for Phase 1 Overview of the Market Evolution Program Consultation.
15 Jul 2003Market Operations Standing Committee of the IMO1 Treatment of Combined Cycle Generation and Related Aggregation Issues (MR-00121) John MacKenzie.
Market Operations Standing Committee of the IMO Market Operations Standing Committee July 23, 2003.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
3 Dec 2003Market Operations Standing Committee1 Change Management: Market Rules Update John MacKenzie.
RMS Update to TAC June 7, RMS Activity Summary RMGRR052 File Naming Convention for Customer Billing Contact Information URGENT (Vote) RMS Procedures:
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Overview of the NYISO Demand Response Programs
TAC Report to the ERCOT Board
Asia-Pacific Energy Regulatory Forum
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Flexible Forward Contracts for Renewable Energy Generators
DISTRIBUTED GENERATION (DG) MODELING CRITERIA SWEDE 2016
Narragansett Rate Settlement
DISTRIBUTED GENERATION in Massachusetts
Market Pricing Issues: Update
Presentation transcript:

2004/06/0 2 Market Operations Standing Committee of the IMO1 Small Facilities - Technical Requirements Rhonda Wright

2004/06/0 2 Market Operations Standing Committee of the IMO2 Goal of Consultation Review market rule barriers to small facilities which have been identified by proponents who are expected to respond to government Requests for Proposals Discuss potential solutions and obtain comments from the MOSC on them

2004/06/0 2 Market Operations Standing Committee of the IMO3 Small Facilities What Are They Why Are They Not in the Wholesale Market Now Why is Wholesale Market Participation an Issue What Barriers Exist to Discourage Market Entry

2004/06/0 2 Market Operations Standing Committee of the IMO4 Small Facilities What Solutions are Available to Lower These Barriers What Issues May the Market Have With Lowering These Barriers What is the IMO’s Plan Going Forward

2004/06/0 2 Market Operations Standing Committee of the IMO5 Small Facilities - What Are They? Small generation or load facilities Examples are Distributed generation (DG), demand response facilities, small wind Combination of small size (<2 to 5 MW) and low capacity factor (<500 hours per year) Typically embedded within an LDC

2004/06/0 2 Market Operations Standing Committee of the IMO6 Why are they not in the market now? Revenues do not likely justify the cost of becoming an MP Threshold of 1 MW for facility registration for dispatchable facilities Typically embedded - no obligation to participate in IAM

2004/06/0 2 Market Operations Standing Committee of the IMO7 Why is This an Issue? DG proponents are approaching IMO about participating in IAM Government Renewables RFP minimum size is 500 kW, requires participation in IAM 2500 MW RFP - demand response, DG Future initiatives?

2004/06/0 2 Market Operations Standing Committee of the IMO8 What Barriers May Exist? Facility Registration - 1 MW minimum Telemetry - distributed control solutions introduce latency in data Main/Alt requirement for each revenue metering installation Voice Communication requirements

2004/06/0 2 Market Operations Standing Committee of the IMO9 Possible Solutions Creating new minimum standards for these facilities - need criteria Exemptions - uncertainty for proponent, additional work for MP and IMO, lacks necessary transparency, may be needed for early entrants

2004/06/0 2 Market Operations Standing Committee of the IMO10 Solutions - Issues Potential reliability impacts Impact on settlements for other MPs potentially affected by lower standard for these facilities (e.g. host distributor) Others?

2004/06/0 2 Market Operations Standing Committee of the IMO11 Small Facilities What is the IMO’s plan going forward? –Consultation with Technical Panel, MOSC, and the Ministry of Energy - June 2004 –Develop strawman to facilitate entry of small facilities into IMO markets - June 2004 –Stakeholder strawman with MPs - June 2004

2004/06/0 2 Market Operations Standing Committee of the IMO12 Small Facilities What is the IMO’s plan going forward? –Stakeholder strawman with Ministry of Energy and RFP Proponents - June/July 2004 –Finalize strawman - July 2004 –Development of market rules - Aug/Sept 2004 –Ensure market rules are in place to meet Ministry of Energy RFP schedule