Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.

Slides:



Advertisements
Similar presentations
Liverpool Accelerator Physics Group International Linear Collider (ILC) R&D The Cockcroft Institute The University of Liverpool is the lead organisation.
Advertisements

Energy spectrometer cavity BPM Royal Holloway, University of London S. Boogert, G. Boorman University of Cambridge M. Slater, M. Thomson & D. Ward University.
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Myriam Newman April 13, 2007 Laser-Wire 1 Myriam Newman LC-ABD Meeting University of Oxford Thursday, April 13 Lens Performance Review Laser-Wire Team.
ATF2 Interaction Point Beam Size Monitor (Shintake Monitor) Status T. Yamanaka, M. Oroku, Y. Yamaguchi, S. Komamiya ( Univ. of Tokyo ), T. Suehara, Y.
Nick Walker KEK-DESY meeting 7 th March 2005.
Latest laser-wire results ● How does a Laser-Wire work? ● Latest ATF results ● Focusing optics ● Latest PETRA results University of Oxford: Nicolas Delerue,
Accelerator and Beam Delivery The LC-ABD (Linear Collider: Accelerator and Beam Delivery) consortium is a group of UK institutes aiming to develop new.
Mon 03 July 06Laserwire Mini-Workshop1 Using Laserwires to Measure Emittance at the ILC Leo Jenner, Daresbury Labs.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
NanoBPM schedule California Institute of Technology Toyoko Orimoto Cornell University Robert Meller DESY Vladimir Vogel KEK Hitoshi Hayano, Yosuke Honda,
The ILC Laser-wire system Sudhir Dixit The John Adams Institute University of Oxford.
AS Diagnostic Collaboration Mark Boland
1 ATF Status LCPAC K.KUBO Introduction Emittance Single bunch and multi-bunch in DR Extracted beam Wiggler study Other experiment, Instrumentation.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
What’s already existing?What’s already existing? Laser system & impacts on Optics TransportLaser system & impacts on Optics Transport –Laser power –Focusing.
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Philip Burrows LCUK Meeting, Oxford 29/01/04 UK LC-ABD Collaboration UK Beam Delivery System Plans Philip Burrows Queen Mary, University of London.
European Plans for ATF2 G.A. Blair LCPAC, KEK 24 th March 2006 Overview CERN + LAPP EUROTeV UK France DESY.
Laser-wire Measurement Precision Grahame Blair Beijing- BILCW07, 6 th February 2007 Introduction Overview of errors Ongoing technical work in this area.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Laser Wire: :LBPM G A Blair EUROTeV Scientific Workshop, Uppsala 27 th August 2008 Introduction Emittance extraction Experimental programme Laser R&D Summary.
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
12/12/04 1 Stewart Boogert (UCL) Second Mini-workshop Nano project at ATF LBBD-collaboration Laserwire update Adams Institute (Oxford/Royal Holloway) G.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
Special Lecture- ATF The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK ILC School at KEK History and Machine.
4 th Meeting of the ATF Technical Board and System/Group Coordinators Cockcroft Institute Daresbury, UK May, 2007.
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
Laser-wire at ATF2 and PETRA Grahame Blair CERN, 18 th October 2007 Introduction Overview of errors Ongoing technical work in this area Plans for the future.
27 MAY 2008NANOBEAM A laser-wire scanner for the ATF extraction line Alexander Aryshev, Stewart Boogert, Grahame Blair, Gary Boorman a Lawrence.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Laser system for ILC diagnostics Sudhir Dixit: The John Adams Institute (Oxford)
5 Nov. 07 CCAST, IHEP Global Design Effort 1 ILC accelerator related R&D in Japan K. Yokoya KEK CCAST ILC Accelerator Workshop, IHEP, Beijing, Nov
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
L ASER - WIRE U PDATE Commissioning of the PETRA3 Laser-wire Summary of first ATF-ext laser-wire Installation of ATF2 laser wire Grahame Blair CLIC Technical.
Diagnostics Workpackage G A Blair EUROTeV Final Meeting, DESY, Hamburg 30 th January 2009 Tasks Summary.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
Accelerator Physics Topics REPORT Philip Bambade LAL-Orsay LCWS 2005 Stanford, 22 March 2005.
FP7: EuCARD after a year of preparation… A.Jeremie.
1 RTML Emittance Measurement Station Yuri Kubyshin (1), Robert Apsimon (2), Hector García (1,2) (1) Technical University of Catalonia (UPC) (2) CERN CLIC.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
3rd September 2004 G. Blair, RHUL1 Laser Wire Update G. A. Blair Royal Holloway Univ. London ECFA LC Workshop Durham 2 nd September 2004 Laser-wire at.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
ILC-Americas Regional Team Review
at Royal Holloway Univ. London
Fast scanning systems for Laser-wires
Testbeam plans for LEP instrumentation
Plans for Laser-wire System Grahame Blair 30th May 2005
Oversea collaborators
Laserwire: high resolution non-invasive beam profiling
Beam Size Monitor Model
Diagnostics Summary G. Blair RHUL 23rd June 2005
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
Background study plans : from to ILC
Junji Urakawa ( for collaborators ) March KEK at LNF
Laser-wire Measurement Precision
Presentation transcript:

Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2

Laser-wire People BESSY T. Kamps DESY H. C. Lewin, S. Schreiber, K. Wittenburg, K. Balewski Oxford R. Bingham, S. Dixit,B. Foster, N. Delerue, D. Howell, A. Reichold Royal Holloway (UL) A.Agapov, G. Blair, G. Boorman, A. Bosco, J. Carter, L. Deacon, F. Poirier, M. Price, C. Driouichi University College London (UL) S. Boogert, S. Malton CCLRC Daresbury L. Jenner KEK A.Aryshev, H. Hayano, P. Karataev, K. Kubo, N. Terunuma, J. Urakawa Kyoto N. Sasao SLAC A. Brachmann, J. Frisch, M. Ross Project web page:

Laserwire - PETRA + UCL RHUL UCL DESY CERN Oxford Progressing really well

PETRA laser-wire – 2d system 2-d scanning system Mechanics designed + built at Oxford Optics + electronics on order Final construction at RHUL with UCL + Oxford Will be shipped to DESY in summer 2005

Laser-wire Future Major new laser lab now set up at Oxford Building international group in advanced lasers for accelerators; mode-locked system planned. Install micron laser wire in ATF extraction line Build expertise in ultra-fast EO scanning Improve PETRA LW performance Plan move to PETRAIII location + new optics Build ATF2 micron-scale laser-wire Multiple IP systems ATF2 proposal for LW “Shintake” systems with Tokyo Uni./ KEK (ATF2 proposal in preparation)

At ATF, we will aim to measure micron-scale electron spot-sizes with green (532 nm) light. Aim at intra-rain (fast) scan for 300ns bunch spacing. The final spot-size measurable at ILC will have implications for the length and layout of the BDS diagnostics section. The ATF/ATF2 results will be crucial to determine the technical boundaries. ATF Laser-wire Motivation

pulsed laser-wire location

This year’s activity for the ATF extraction line laser-wire March 2005: “study trip”: Understand the possible setup [optics/infrastructure], prepare our DAQ. May 2005: Laser measurements, study the laser beam optics. Plan DAQ. Electron beam optics. Lens design. September 2005: Install laser transport and beam delivery (Optics, Scanning, electronics), install vacuum vessel and build final focusing lens. First installation of DAQ. November/December 2005: Laser-wire run.

This year’s activity for the PETRA laser-wire March-June 2005: Improve our DAQ, data taking and analysis. July 2005 (?): Purchase and install new Q-switched, injection seeded laser (EUROTeV). Complete measurements on 2-d system at RHUL. September 2005: Ship 2-d system to DESY, install and make first tests. Continue planning of PETRAIII system. October/December 2005: Laser-wire run with new system.

Other issues Multiple IPs: How many laser-wires will we need for ATF2 / ILC? Synergy with “Shintake” system. Laser transport: Multiple IPs – how do we distribute the laser light; fibers ? Local laser amplifiers ? Timing issues ? Compton Detectors: How best to detect – electrons/photons (both?). Speed, resolution, location. Also EUROTeV input here. Optics design of beam diagnostics region Still lots to do; intrinsic part of our programme.

Complementary Strategy PETRA aims: Turn-key diagnostic, reliability, speed, resolution. 2-d system. Workhorse diagnostic for PETRA III and foundation for ILC. Will use identical DAQ for ATF. ATF2 aims: Micron spot-sizes in ILC-like conditions. Critical LW specs for CDR. Both: excellent training ground for the people who will actually build the ILC

Mode Locked Laser UK laser lab: Dedicated laser lab now complete at Oxford. We will start to build a mode-locked system this autumn. Aim at 300ns bunch spacing High stability Compatibility with ultra-fast scanning

Summary PETRA and ATF/ATF2 complementary laser-wire systems Strong international team growing around ATF/ATF2 Major new laser project about to grow in UK. Collaboration continues with DESY on detector technology Continuing to explore ILC performance requirements Full simulations in progress towards Snowmass.