Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
DCS aspects of TDAQ racks in USA15 and SDX1 Y. Ermoline et al. ATLAS Week, CERN, 15 February 2005.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
TRT DCS overview Elzbieta Banas Zbigniew Hajduk Jolanta Olszowska (INP PAS Cracow) ID Week /TRT Operation1.
Active Dividers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Michel Crouau (Now retired) Dominique.
18/7/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  How to power the electronics of TILECAL ? Power supply as close as possible to electronics ?  Positives.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Satoshi Mihara ICEPP, Univ. of Tokyo Feb MEG Review Meeting 1 CEX beam test at piE1 Satoshi Mihara.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Status of NA62 straw electronics Webs Covers Services Readout.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Detector Cooling CERN, September 28, 2006 Jaak Lippmaa HIP, University of Helsinki.
Pending mechanics issues for electronics/services (updated 18/08/05 by Ana) Fixation/shielding for 2 LV PS (no fingers):  - Clermont worked out a proposal.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
A System Sensitivity Example Friday 19 Sept 2014 EE 401: Control Systems Analysis and Design Example #2:  Nominally, K = 5 and H =  Determine the.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
10/09/10FV 1 News and observations from Brussels' meeting.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
R&D status of the very front end ASIC Tilecal week (7 October 2011) François Vazeille Jacques Lecoq, Nicolas Pillet, Laurent Royer and Irakli Minashvili.
DOM Thermal Test Sept X.Bai, D.Swarnkar,. 26”(L) X 28(1/4)”(W) X 20”(H) blue board box filled with fiber glass insulation blue board insulation.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
ELENA installation progress F. Butin / ELENA collaboration.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
"Drawer Mechanics - MiniDrawer"
Upgrade activities at Clermont-Ferrand
RICH Status from last RICH meeting
Status of upgrade works at Clermont-Ferrand
352MHz Klystron Control for the 3MeV Linac test stand
Pierluigi Paolucci - I.N.F.N. Naples
RPC Detector Control System
RPC Detector Control System
Presentation transcript:

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling performances and tests during the September 2001 calibration period Fernando Varela / Philippe Grenier (CERN) ATLAS week, CERN October 2001

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling system in H8 water tank output pipes fridge unit control box return pipes

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Monitoring of the cooling system cooling unit informations (ELMBs) - input/output temp on each drawer - water output temp - water flow drawer informations (HV program) - also, HV on the PMTs - 7 temp probes located in the drawers Monitoring PVSSII application Database (web interface)

Philippe Grenier (CERN) ATLAS week, CERN October 2001

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Low voltages control Drawer temperatures trends PMTs HVs

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Stability of the system normal working conditions: T=18 o C, Flow=60 l/h

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Stability of the system during data taking Tout =19.7  0.1 o C =19.6  0.1 o C =18.3  0.1 o C =18.4  0.1 o C =18.3  0.1 o C Tin

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Increase of the water temperature in the drawers ( o C)

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Stability of the temperature inside drawer

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling tests 1- variation of the water input temperature (16 o C  22 o C) (180 GeV electrons shooting in cell A14)  PMT gain variation measured with particules  drawer temperatures variations 2- variation of the water flow (10 l/h  60 l/h)  drawer temperatures variations

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Water flow variations Cooling Temperature = 18 o C  optimal flow: 60 l/h

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Drawer temperatures variations Flow = 60 l/h 6 o C 3 o C  T(PMT) = 1/2  T(cooling)

Philippe Grenier (CERN) ATLAS week, CERN October 2001 PMT gain variation versus temperature  E/E = 0.2 % / o C(PMT)   E/E = 0.1 % / o C(cooling) resolution total energy deposited versus temperature in PMT# GeV electrons

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Conclusions - optimal flow: 60 l/h (without LV in fingers) -  T(output - input) = 1.3 o C, for a flow of 60l/h -  Gain(PMT) = 0.2% / o C(PMT) = 0.1% / o C(cooling) - cooling water temperature stability: 18.3  0.1 o C

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Still to be done - Effect of room temperature variation with non-isolated pipes (using foreseen tubes) - ( not yet operating: cooling unit for Cs calibration in blg 185 ready) - Next year: re-optimize flow with finger LV power supplies - Pilot Project (see next slide)

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling pilot project in blg budget approved last week (50% financed by EP div JCOV committee) - real size test (ATLAS): note - Schedule (Sept Sept 2002): - 15m high scaffolding available - components just ordered - start mounting/piping, until end of the year - tests to be done: Jan 02  Sept 02

Philippe Grenier (CERN) ATLAS week, CERN October 2001 Cooling pilot project in blg 185: Scaffolding installation