NToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET.

Slides:



Advertisements
Similar presentations
Simulations des niveaux de radiations en arrêt machine M. Brugger, D. Forkel-Wirth, S. Roesler (SC/RP)
Advertisements

Preliminary studies for T2 primary target for the NA61 fragmentation beam run 11 th October 2010 – NA61 Collaboration Meeting M. Calviani on behalf of.
HZDR FLUKA activities in support of the MYRRHA Project Short summary with a focus on activation problems Anna Ferrari, Stefan Müller, Jörg Konheiser.
1 Activation problems S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2) (1) Politecnico di Milano; (2) CERN.
Induced Activity Calculations in Support of D&D Activities at SLAC Joachim Vollaire, Radiation Protection Department.
Shutdown Constraints and Radiation and Activation effects ECFA - Aix Les Bains S. Bally, O. Beltramello, I. Bergstrom, N. De Bortoli, H.Vincke,
HSE Preliminary General Requirements for FCC layout and air management A. Henriques & M. Widorski on behalf of the HSE Unit 17/12/2014 FCC I&O Meeting.
First Considerations on CLIC Cooling System Ch. Martel, J. Inigo-Golfin TS/CV.
1 Induced radioactivity in the target station and in the decay tunnel from a 4 MW proton beam S.Agosteo (1), M.Magistris (1,2), Th.Otto (2), M.Silari (2)
1 Radiation Safety Aspects of the Linear Collider B. Racky, A. Leuschner, N. Tesch Radiation Protection Group TeV Superconducting Linear Accelerator.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
Neutronics & RP Issues Neutronics & RP Issues nToF Review 14 th February 2008 CERN AB/ATB/EET n_TOF Team.
What need to be done to restart n_TOF (in 2007?) 4 Short description of the Facility 4 Old Target removal in the provisional Storage place (Service Gallery).
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Highlights of RP activities in support of ISOLDE operation and projects Joachim Vollaire, Alexandre Dorsival and Christelle Saury with material from others.
General RP guidelines for CENF CENF secondary beam study group H. Vincke07/05/
1 Safety Issues for the n-TOF target Thomas OTTO, Radiation Protection Group, SC-RP, CERN.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Radiation Protection during design, operation and dismantling of target areas Thomas Otto based on material from RP group.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
Managed by UT-Battelle for the Department of Energy Residual Does Rate Analyses for the SNS Accelerator Facility I. Popova, J. Galambos HB2008 August 25-29,
Towards a modified n_TOF Facility and Increased Radiation Safety Towards a modified n_TOF Facility and Increased Radiation Safety ATC/ABOC Days, 21 st.
N_TOF Technical Report INTC, CERN 21 May 2007 P. Cennini AB-ATB n_TOF Technical Coordinator Status of the old Target Removal Status of the old Target Removal.
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 27.
Status of the new Target Design n_TOF Collaboration meeting, Paris 4-5 December 2006 P. Cennini AB-ATB Status of the old Target Removal Status of the old.
Status of Radiation Protection Studies for the Linac4 beam dumps Joachim Vollaire DGS/RP.
Beam loads & dump concepts T. Kramer, B. Goddard, M. Benedikt, Hel. Vincke.
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Status Report by the n_TOF Technical Coordinator P. Cennini AB-ATB on behalf of the n_TOF Team  The n_TOF Facility  Where are we standing  Resume of.
Considerations for an SPL-Beamdump Thomas Otto CERN in collaboration with Elias Lebbos, Vasilis Vlachoudis (CERN) and Ekaterina Kozlova (GSI) Partly supported.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Containment and.
HTS Tl-based coatings for FCC beam screens - Radiation Protection Aspects - Markus WIDORSKI, DGS-RP Information on ActiWiz: Courtesy of Chris Theis, DGS-RP.
Radiation Protection at the LHC Lessons Learned D. Forkel-Wirth, D. Perrin, S. Roesler, C. Theis, Heinz Vincke, Helmut Vincke, J. Vollaire CERN-SC-RP-SL.
Radiation Protection in J-PARC neutrino beam line Sep Yuichi Oyama (KEK) for T2K neutrino beam line construction group Happy birthday.
Application of FLUKA to fixed- target programs at CERN: a short, not exhaustive selection M. Calviani (CERN) With contributions from: M. Brugger, F. Cerutti,
New SPS scraping system: preliminary RP remarks Helmut Vincke DGS-RP.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
WP2 progress on safety E. Baussan EUROnu CB Meeting Monday 10th & Tuesday 11th June 2011 CERN, Geneva, Switzerland.
Status of the Design Study Richard Catherall EN-STI-RBS.
Radiation protection and radiation safety issues for HIE-ISOLDE. FLUKA calculations Y. Romanets ISOLDE Workshop and Users meeting 2010 CERN, 8 December.
Radiation Protection Considerations for the CDR Helmut Vincke DGS-RP.
Status of n_TOF Facility
Characterization of the nTOF Radioactive Waste M. Brugger, P. Cennini, A. Ferrari, V. Vlachoudis CERN AB/ATB/EET.
R ADIATION P ROTECTION ASPECTS LSS1 LHC f RE - INSTALLATION Cristina Adorisio (CERN - DGS/RP) LTEX Meeting – May 10 th, 2012.
1 July 2004 Radiation Protection Issues 1 M.Brugger, D.Forkel-Wirth, S.Roesler, H.Vincke SC/RP Review of the LHC Collimation Project 30 June – 2 July 2004.
LIEBE Target Design Review. Schedule This comment is no longer valid as the schedule has been postponed and the beam permit will be requested for Q
Ma zhongjian Ding yadong Wang qingbin Wu qingbiao Radiation Protection Group/IHEP.
EURISOL DS Task meeting Orsay, 07 Janvier Preliminary shielding assessment of EURISOL Post Accelerator D. Ene, D. Ridikas. B. Rapp.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
The target handling concept of the pbar- separator at FAIR M. Helmecke, V. Gostishchev, R. Hettinger, K. Knie 6th High Power Targetry Workshop Oxford.
Status of the FAIR pbar target: Target handling study (M. Helmecke)
Safety & Radioprotection 8 Jul. 2005, Liverpool, UK WP 5: Safety & Radioprotection Participants:role 1. GANIL, France - sub-task D 2.
KEK Radiation Related Topics neutrino beam construction subgroup Yuichi Oyama (KEK) and target monitor subgroup for.
S. Roesler (on behalf of DGS-RP)
The n_TOF Facility Today
Beam Loss and Radiation Working Group: Conclusions
Radiation protection of Linac4 M. Silari Radiation Protection Group
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
Van Wert, OH Water and Wastewater Element Training
Preliminary Study – Radiation induced activity in a SB Target
Ventilation efficiency for Horn cooling
C. Adorisio Extracted from the presentation given at
PAPER NUMBER 98 Disposal project for LLW and VLLW generated from research facilities in Japan: A feasibility study for the near surface disposal of VLLW.
CEPC Radiation and Shielding
Presentation transcript:

nToF - Radiation Protection M. Brugger, P. Cennini, A. Ferrari, E. Lebbos, V. Vlachoudis CERN AB/ATB/EET

The Safest of all Operations is no Operation! BUT…

nToF Collaboration Meeting - Radioprotection Constraints 3 Installation/Operation  Shielding & Access  Monitoring  Activation of Air  Cooling (Activation, Contamination) Handling & Related Procedures  Residual Dose Rates  Contamination Waste Disposal, Transport  Specific & Total Activity  Residual Dose Rates  Contamination Radio-Protection Issues Planification & Design

nToF Collaboration Meeting - Radioprotection Constraints 4 Installation/Operation Installation/Operation  Shielding & Access  Monitoring  Activation of Air  Cooling (Activation, Contamination) Handling & Related Procedures Handling & Related Procedures  Residual Dose Rates  Contamination Waste Disposal, Transport Waste Disposal, Transport  Specific & Total Activity  Residual Dose Rates  Contamination Radio-Protection Issues

nToF Collaboration Meeting - Radioprotection Constraints 5 FLUKA Calculations Handling – Residual Dose Rates Intervnetion Procedures & Doses

nToF Collaboration Meeting - Radioprotection Constraints 6 Detailed geometry Detailed geometry  (1) Target only, (2) as well as with the surrounding structure  (3) Including the downstream tunnel structure Residual dose rates Residual dose rates  two methods: single-step & two-step (well benchmarked)  detailed 3D dose rate maps  various cooling times: 1y 8m, 2y, 2y 5m, 3y, 10y  Individual & collective dose estimates Activation of air Activation of air  folding of particle fluences with production cross sections Activation of target Activation of target  specific activity and expression as multiple of the respective exemption limits FLUKA Calculations

nToF Collaboration Meeting - Radioprotection Constraints 7 Geometry Details

nToF Collaboration Meeting - Radioprotection Constraints 8 Target in the Pit Target Earth Pit filled (concrete) Beam Pipe Concrete Marble Beam

nToF Collaboration Meeting - Radioprotection Constraints 9 Evaluation of calculated DR  Different levels of details Geometry (target only, in the pit, chemical properties)  Comparison with performed measurements Preparation of the intervention  Calculation of residual dose rates (DR)  3D DR maps for dose planning  Planning, procedures, optimization Inspection, Interventions  Visual control, taking pictures from various angles  Taking samples for analysis Calculation of Residual Dose Rates

nToF Collaboration Meeting - Radioprotection Constraints 10 Calculation of Residual Dose Rates Evaluation of calculated DR Evaluation of calculated DR  Different levels of details Geometry (target only, in the pit, chemical properties) Geometry (target only, in the pit, chemical properties)  Comparison with performed measurements Preparation of the intervention  Calculation of residual dose rates (DR)  3D DR maps for dose planning  Planning, procedures, optimization Inspection  Visual control, taking pictures from various angles  Taking samples for analysis

nToF Collaboration Meeting - Radioprotection Constraints 11 Measurement Location Calculation of Residual Dose Rates 0% Co 0.01% Co

nToF Collaboration Meeting - Radioprotection Constraints 12 Calculation of Residual Dose Rates Measured Dose Rate: ~15mSv/h Considered Cobald Content: 0.01%

nToF Collaboration Meeting - Radioprotection Constraints 13 Calculation of Residual Dose Rates Evaluation of calculated DR  Different levels of details Geometry (target only, in the pit, chemical properties)  Comparison with performed measurements Preparation Preparation  Calculation of residual dose rates (DR)  3D DR maps for dose planning  Planning, Procedures, Optimization Inspection  Visual, pictures from various angles  Taking samples for analysis

nToF Collaboration Meeting - Radioprotection Constraints 14 Residual Dose Rate Maps

nToF Collaboration Meeting - Radioprotection Constraints 15 Removal of Sand

nToF Collaboration Meeting - Radioprotection Constraints 16 Position for Sand Removal

nToF Collaboration Meeting - Radioprotection Constraints 17 Taking Samples for Material Studies

nToF Collaboration Meeting - Radioprotection Constraints 18 Estimates are available for all expected scenarios  Target Displacement  Sand Removal  Taking Pictures  Sample Taking Low Individual and Collective Doses  20 – 80  Sv Collective dose Optimized Procedures Well Planned Interventions Good News: no problem - straight foreward! Good News: no problem - straight foreward! Intervention Scenarios

nToF Collaboration Meeting - Radioprotection Constraints 19 Air Activation Ventilation

nToF Collaboration Meeting - Radioprotection Constraints 20 Installation layout (air flow, release point(s)) FLUKA simulation  Isotope production yield (particle fluences folded with respective isotope production cross sections) Possible ventilation layout Release values Dose calculations  Direct exposure (personnel)  Long/Short-term exposure (public: critical group) Air Activation & Ventilation

nToF Collaboration Meeting - Radioprotection Constraints 21 Take a Look from Above nToF ALARA: As Low As Reasonably Possible Problem: The public often isn’t very reasonable

nToF Collaboration Meeting - Radioprotection Constraints 22 Air Activation & Ventilation Critical Group: Border Guards

nToF Collaboration Meeting - Radioprotection Constraints 23 FLUKA isotope production yield FLUKA simulation in order to calculate the isotope production yield (39 different isotopes considered) Exposure of personnel  Dose conversion coefficients  Dose conversion coefficients based on the Swiss and French legislation Dose to the public Dose to the public  Definition of critical groups (border guards)  Calculation of dose conversion coefficients based on environmental models different ventilation scenarios Study of different ventilation scenarios and their impact on the respective dose estimate Dose Estimation

nToF Collaboration Meeting - Radioprotection Constraints 24 Production term – depends on tunnel layout: 1) no additional shielding closest to reality 2) eight meter shielding (closest to reality) 3) fourteen meter shielding Ventilation Flow (critical parameters)  Laminar (continuous) assumed volumes: active region, decay ventilation speed operation time  Enclosed Case (Flush before Access) ventilation speed waiting time Calculation Parameters

nToF Collaboration Meeting - Radioprotection Constraints 25 Dose to Personnel & Critical Group Direct Exposure (Person inhaling the Air) Dose to public (critical group)

nToF Collaboration Meeting - Radioprotection Constraints 26 Different Configurations Case 1 Dose to public: minimal (< 0.2  Sv) – Ar 41 /Be 7 Dose to personnel:  ~130  Sv/h (laminar flow, continuous ventilation) - Ar 41  ~500  Sv (enclosed configuration, per flush) - Be 7, P 32 No Ventilation “Natural Flow” 5 exch./day

nToF Collaboration Meeting - Radioprotection Constraints 27 Different Configurations Case 2 Dose to public: ~1  Sv (laminar), <0.1  Sv (enclosed) Dose to personnel:  ~86  Sv/h (laminar flow, continuous ventilation)  ~15  Sv (enclosed configuration, per flush) - Be 7 Standard Ventilation

nToF Collaboration Meeting - Radioprotection Constraints 28 Estimate for ‘dose to personnel’ is a very conservative assumption (Safety Report #19: unknown situation  a factor of ¼, usually  dilution>100)  usual goal: be better than 1  sv/h additional dilution Enclosed scenario is conservative as air will mix before release (additional dilution) filters Be7 and P-32 capture very well on filters Enclosed case Enclosed case has to be favored, ideally including an installed filter unit (in operation before flush) To be discussed together with RP and evaluated with respect to costs involved and maximum efficiency Good News: solution seems to be straight forward What Ventilation System? Fortunately we don’t need a crane for this!

nToF Collaboration Meeting - Radioprotection Constraints 29 How Could it Look Like Continuous operation in order to filter Be7 and P32 Flush before access with highest possible speed

nToF Collaboration Meeting - Radioprotection Constraints 30 Nuclide Vector Waste Disposal

nToF Collaboration Meeting - Radioprotection Constraints 31 Target Disposal – Waste Study Specific actifity (Bq/g) Specific actifity (Multiples of LE) Nuclide Vector

nToF Collaboration Meeting - Radioprotection Constraints 32 The FLUKA study is based on the entire period of nToF operation ( ) Several cooling times were calculated, results shown refer to Mai 2006 Preliminary as target assumed to be pure lead Nuclide Vector Stainless Steel Frame Lead Target (pure Pb)

nToF Collaboration Meeting - Radioprotection Constraints 33 Characterization of the nuclide vector Characterization of the nuclide vector, specific activities, total activity, residual dose rate (for different cooling times)  a too high concentration of  -emitters can be a show stopper (~1MBq/200l of ‘treated’ volume) – to be investigated! Storage possibilities (coordinated by NAGRA)  PSI (now, soon)  Final Swiss depository (not yet built/decided) CERN (temporary) Transport Class-A  can be well shielded, thus transport will be Class-A  most probably no CASTOR like overkill (to be verified) Costs  ~100kCHF per cubic meter  7kCHF for the container  XXX CHF for transport Study needs to be refined with proper the chemical composition Good News: disposal seems to become feasible with PSI Good News: disposal seems to become feasible with PSI Target Disposal – Waste Study Question of Money

nToF Collaboration Meeting - Radioprotection Constraints 34 and…

nToF Collaboration Meeting - Radioprotection Constraints 35 Old Target: ventilation layout/filtering/monitoring  Decision on the ventilation layout/filtering/monitoring new calculations most probably not needed!  Inspection of the target  Inspection of the target -> otherwise we risk a lot final preparation of the intervention FLUKA calculations for the nuclide vector  Refined FLUKA calculations for the nuclide vector waste disposal  Decision on waste disposal New Target:  Final design material constraints, size additional shielding needed?  Handling  Handling (Residual Dose Rates)  Effect on air activation  Waste characterization Big question mark  Contamination of cooling circuit – show stopper for operation? What’s Missing (for RP) Question of Time