Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
LHC Wed 16 Sept 2015 Struggling with cryo o-night Tuesday - Wednesday 07:11 Injecting again 09:00 Dump on injection of train of 144 bunches, losses IP7.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Friday 2 nd November 08:45 Stable beams Fill 3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband.
LHC status Wednesday 15 th July 2015 Coordination: Wolfgang Hofle, Mike Lamont.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
LHC status Friday 11 th September 2015 Coordination: Mike Lamont, Jorg Wenninger.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Barbara Holzer, Jorg Wenninger
LHC Morning Meeting - G. Arduini
Coordination: Gianluigi Arduini & Jan Uythoven
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Friday March 4th 08h32: Access for beam dump system.
LHC Morning Meeting - G. Arduini
Chromaticity can make a difference…
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tue/Wed 12/ :00 Probe beam back again
Cold compressor speed S45
Friday morning 08:00 Stable beams with 840b.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam dump LHCb on injection. Reduce satellites in PS. 10:30 Transverse damper module H2B2 down and RF lines tripped. 13:24 ADT problem fixed. Injecting for physics. 13:52 Start ramp. 13:55 Cryo problem in point 4. Cryo ok will be lost in few minutes. 14:05 Beam dumped due to cryogenics point 4. Cryo recovery. 06:30 Cryogenics back – pre-cycle. 08:00 Injecting pilots. LHC 8:30 meeting 13/11/2012

Injection Second injection 144 b beams dumped by LHCb Decide to stop the satellite enhancement in PS to check difference  Reduces the losses at injection by factor 2 – 3.  Not seen injection sequencer that green for a while  Average slot population about 0.1 % LHC 8:30 meeting 13/11/2012

LDM for 144 bunches These bunches, before and after the 144 bunches, can be kicked out by the injection kicker and cause losses in LHCb… LHC 8:30 meeting 13/11/2012

Cryogenics Point 4 LHC 8:30 meeting 13/11/2012

Cryogenics problem Point 4 Monday 12Nov’12 13h56: (1st part of ramp for physic) Cold compressors stopped at P4-S34, “fault” of magnetic bearings for CC1 15h: Access in cavern and strange error message Similar “signature” as previous SEU for such HW, but this time <1TeV…… For info: HiRadMat this week!!! 16h: Test to restore LHe level sensor (negative!) 17h: CC4 bearings fault needed recalibration (close to end of life?) 19h: restart of cold compressors (pump-down algorithm not as expected!) 24h: Full flow dedicated to sector cooling Tuesday 13Nov’12 6:30h: Cryo conditions back Repair: 5h - Prepare for cooling: 5h - Cooling: 6:30h Cryo down-time: 16:30h LHC 8:30 meeting 13/11/2012

This fill Tune split in a bit earlier  Goes in after tune-shift in the squeeze. 3e-3 B1V. Philippe looking at the RF  Fourth injection in batch has longer bunch length  Check bbb blow-up settings Reduced damper gain B2 as still without gated BBQ. Increase damper when gated BBQ operational Gated BBQ B2 (this fill?) LHC 8:30 meeting 13/11/2012

Miscellaneous Access DONE:  ATLAS, CMS, ALICE, EPC RQF.A67, BI Compensator IP8 back in operation  LHCb ramped down and up Test of ndiv beams from SPS (own cycle) Outstanding  TL TCDI scraping test to check tails coming from SPS (1 inj)  Gated BBQ B2 (this fill?)  Injection cleaning and damper tests Access  PM32 : CV to check / remove sand.  Access system LHC 8:30 meeting 13/11/2012