Doc.: IEEE 802.11-05/0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE 802.11, San Francisco, California, July 18.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1424r1 Submission Nov 14-19, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Antonio, Texas, Nov 14-19, 2004.
Advertisements

Doc.: IEEE /0803r1 Submission July 2005 TK Tan, Philips Slide 1 WNG SC Closing Report Notice: This document has been prepared to assist IEEE
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
Doc.: IEEE /1451r1 Submission September 2006 T. K. Tan, Philips Slide 1 WNG SC Report Notice: This document has been prepared to assist IEEE
Doc.: IEEE /0747r0 Submission May 2006 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp May Opening Presentation Notice: This document has.
Doc.: IEEE /0913r1 Submission Sep 19-23, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Orange County, California, September.
Doc.: IEEE /0054r0 Submission January 2005 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc Agenda Notice: This document has been prepared to.
February 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0258r0 Submission 11k Brisbane 2 Agendas Notice: This document has been prepared to assist.
Doc.: IEEE /0646r0 Submission July 2005 Richard Paine, BoeingSlide 1 11k Cairns Agendas Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /0755r0 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
Siemens, Roke Manor (Recording Secretary )
Siemens, Roke Manor (Recording Secretary )
TGu Timeline Date: Authors: March 2006 March 2006
11k Seattle 3 Agendas Date: Authors: September 2005
11k Vancouver Ad Hoc Agenda
11k Vancouver Ad Hoc Agenda
[ Interim Meetings 2006] Date: Authors: July 2005
11k Vancouver Ad Hoc Agenda
WNG SC Agenda Date: Authors: Name Company Address Phone
WNG SC Agenda Date: Authors: Name Company Address Phone
WNG SC Committee Report IEEE , Berlin, Germany, Sep 13-17, 2004
WNG SC Agenda Date: Authors: Name Company Address Phone
WNG SC Opening Report Date: Authors: Name Company Address
ADS Study Group Agenda Date: Authors: January 2005
WNG SC Agenda Date: Authors: Name Company Address Phone
Siemens, Roke Manor (Recording Secretary )
TGu Timeline Date: Authors: March 2006 March 2006
TGu Agenda Date: Authors: January 2007 January 2007
TGu Ad Hoc Agenda Date: Authors: February 2007
TGu Agenda Date: Authors: March 2006 March 2006
TGu Timeline Date: Authors: January 2005 January 2005
TGu Closing Report Date: Authors: September 2005
Siemens, Roke Manor (Recording Secretary )
TGu Agenda Date: Authors: January 2006 January 2006
TGu Timeline Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
Wireless Next Generation (WNG) Agenda
Liaison Report From wng
TGu Motions Date: Authors: July 2006 July 2006
March 2005 Opening Report Date: Authors: March 2005
TGu Ad Hoc Agenda Date: Authors: February 2007
IEEE r: Fast BSS Transition TG Agenda
TGu Agenda Date: Authors: March 2007 March 2007
Siemens, Roke Manor (Recording Secretary )
July 2005 Opening Report Date: Authors: July 2005 July 2005
TGu Agenda Date: Authors: March 2006 March 2006
TGu Ad Hoc Agenda Date: Authors: April 2007 April 2007
TGu Motions Date: Authors: May 2006 May 2006
TGu Agenda Date: Authors: January 2006 January 2006
Report of TGv – September 2006
Siemens, Roke Manor (Recording Secretary )
TGu Ad Hoc Agenda Date: Authors: February 2007
TGu Timeline Date: Authors: May 2006 May 2006
IEEE r: Fast BSS Transition TG Agenda
IEEE r: Fast BSS Transition TG Agenda
TGu Agenda Date: Authors: March 2006 March 2006
IEEE IPR Policy Date: Authors: March 2006 March 2006
WNG SC Closing Report Date: Authors: Name Company Address
TGu Timeline Date: Authors: January 2005 January 2005
TGu Motions Date: Authors: May 2006 May 2006
TGu Agenda Date: Authors: May 2006 May 2006
Stephen McCann (Chair)
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
IEEE r: Fast BSS Transition TG Agenda
WNG SC Opening Report Date: Authors: Name Company Address
TGu Timeline Date: Authors: July 2005 July 2005
WNG SC Closing Report Date: Authors: July 2006 July 2006
Presentation transcript:

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Francisco, California, July , 2005 TK Tan, Philips (Chair) Stephen McCann, Siemens, Roke Manor (Recording Secretary )

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 2 WNG SC Opening Report Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Name Company Address Phone TK Tan Philips 1151 McKay Drive M/S SJ48A San Jose CA USA Authors:

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 3 Objectives for July 2005, San Francisco, California Issues related to 802.1AM Architecture Update on TGu and impact on other TGs Prepare for Sep Interim meeting

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 4 Relevant docs wng-wng-sc-report.ppt wng-response-in-support-802-1am.ppt wng-wireless-wg-response-to-proposed am-par-and-5-criteria.ppt wng-tgu-overview.ppt wng high-data-rate-multimedia- transmission.ppt wng scope.ppt wng-minutes-july-2005.doc

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 5 Straw Poll 1 Recommendation from IEEE WNG SC to IEEE WG that the IEEE 802.1AM PAR approval is postponed. It would like to see a study group created within IEEE 802.1, with the intention of revising this PAR to address the RF management issue, ensuring that stakeholders within the wireless groups are invited. Such meetings should be collocated with the IEEE 802 wireless interims. IEEE should therefore invite IEEE to participate in their interims. Straw poll result : 23, 4, 2

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 6 Straw Poll 2 Recommendation from IEEE WNG SC to IEEE WG that it would like to see a study group created within IEEE 802.1, with the intention of revising the approved IEEE 802.1AM PAR to address the RF management issue, ensuring that stakeholders within the wireless groups are invited. Such meetings should be collocated with the IEEE 802 wireless interims. IEEE should therefore invite IEEE to participate in their interims. Straw poll result: 7, 13, 7

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 7 Motion Resolved: This group believes that standardisation of AP to AP protocols should not be excluded from the scope of

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 8 Objectives for Sep 2005, Orange County, California Updates Prepare for Nov Plenary meeting CFP – Future Directions CFP – Cognitive Radio

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 9 6. Patents IEEE standards may include the known use of essential patents and patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either: a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Approved by IEEE-SA Standards Board – May 2004 IEEE-SA Standards Board Bylaws on Patents in Standards 1.

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 10 Inappropriate Topics for IEEE WG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at Approved by IEEE-SA Standards Board – March

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 11 Attendance Recording A sign-in sheet will be located at the Registration desk Each member must sign-in “once” (1) per day, between the hours of 0800 and 1800 local time Participants must “sign” their name in the appropriate place and state % of attendance that day in Attendance will be checked against other 802 groups. Those found abusing the honor system will loose ALL credit for that day. These sheets are provided daily. If you don’t sign up during the “regular sign-in” hours, you will NOT be given credit for that day.

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 12 ftp://server/ IP Address: Will NOT be used for this Session!

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 13 Upload ALL Submissions Into the INCOMING Documents folder ftp://server/802-11/

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 14

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 15

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 16

doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 17 Agenda Overview Monday July 1816:00 – 18: Administration/Minutes/Agenda 2 – Update on Tgu- McCann 3 – 802.1AM Discussion- Myles 4 – 802.1AM Discussion- Durand 5 – Architecture- Moreton Tuesday July 198:00 – 10:00 AM