A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,

Slides:



Advertisements
Similar presentations
ENE 428 Microwave Engineering
Advertisements

PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Cavity BPM for Spectromety: progress and plans A. Lyapin.
EKT 441 MICROWAVE Communications
R&D Plan on Clearing Electrode using the KEKB LER Y. Suetsugu and H. Fukuma, KEKB M. Pivi and L. Wang, SLAC at KEK.
Circuit Simulation Some humbling thoughts… Manfred Wendt Fermilab.
1 KEK Cavity BPM Hitoshi Hayano Development of Cavity BPM for Q-magnet attachment, Aiming; compact design, 0.2µm resolution, BPM center error (between.
8 th ESLS RF Meeting 29 th – 30 th Sep Daresbury Lab 500 MHz ELETTRA Input Power Coupler B. Baricevic, A. Fabris, C. Pasotti.
324MHz FETS RFQ RF measurement and components By Aaron Cheng 18 December 2006.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Tesla Meeting Frascati 27/05/03 C. Magne Cold BPM for TTF2 Tesla prototype - low beam impedance - cooling to 2K without strain - Low beam coupling impedance:
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
FAST KICKER STATUS Fabio Marcellini On behalf of LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
Tohoku university Daisuke Okamoto TILC09 1. Motivation 2. Principle 3. Design 4. Expected performance 5. Conclusion contents.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
1.3GHz Input Coupler for ILC
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
A.Blas APC meeting 12/5/ Status of the PS TFB Project triggered by: K. Schindl and R. Cappi Hardware: J. Belleman (PU amplifiers) T. Bohl, W. Hofle,
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
Status of the Cold BPM Developments at CEA Saclay and Fermilab L-Band Cavity BPM: Nathan Eddy, Andrei Lunin, Eric Pirtle, Gennady Romanov, Nikolay Solyak,
ILC Damping Rings Mini-Workshop, KEK, Dec 18-20, 2007 Status and Plans for Impedance Calculations of the ILC Damping Rings Cho Ng Advanced Computations.
Beam Halo Monitor : Q-bars+SiPMMike Albrow, 26 Aug 2010 A Beam Halo Monitor for the LHC based on Quartz Cherenkov Counters Mike Albrow (Fermilab) Features:
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
BPM for FF test (ATF2) Vladimir Vogel KEK 2nd Nano Workshop, KEK, December 12, 2004.
BPM for Spectromety development status A. Lyapin.
Status of Forward Calorimetry R&D: Report from the FCAL Collaboration Bruce A. Schumm Santa Cruz Institute for Particle Physics University of California,
Fermilab BPM R&D Activities Nikolay Solyak, Manfred Wendt Fermilab Nicolas Chritin, Lars Soby CERN Nobuhiro Terunuma, Junji Urakawa KEK March 26-30, 20101LCWS10.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
Cavity BPM Simulations A. Liapine. Analysis of the Existing BPMs BINP KEK.
UPDATE ON KICKERS LNF David Alesini for the LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
1 NBI Rh. Jones (CERN - AB/BDI) CNGS Target Area Beam Position Monitors OUTLINE 1.Recap of Requirements & Layout 2.Monitor Candidates -Secondary.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
Stripline Beam Position Monitors for the High Luminosity LHC D. Draskovic, T Lefevre CERN, BE-BI-QP.
LER workshop 2014 Update on the Extraction Kicker for CLIC DRs: Calibration Tests C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral.
INFN- Legnaro National Lab. Activity on ESS DTL Diagnostics: BPM & BCM
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
CLIC Workshop 18 th -22 nd January 2016, CERN 1 Alfonso Benot Morell Manfred Wendt.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Status of the sub-harmonic bunching system for the CLIC DB injector front end Hamed Shaker School of Particles and Accelerators, Institute for Research.
Dither Luminosity feedback versus Fast IP feedback
Re-entrant BPM R&D for ILC Main Linac
Wakefield & Cavity based Monitors: Fermilab BPM Development Plans
CLIC Main Linac Cavity BPM Snapshot of the work in progress
ALPS SPS BPM Read-out Electronics RF Front-end – revised
12 GHz High Power RF components requirements for CEA activities
F.Marcellini, D.Alesini, A.Ghigo
New Design for Beam Test Structure
SCU Next Phase Meeting July 8, 2014.
ERL BPM System Mike Billing, Mark Palmer
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
I Alexander Nass for the JEDI collaboration
Non-invasive Beam Position Monitor Research in HUST-PTF
Variable distance from beam.
Overview Beam Position Monitoring Wire Scanners / Cherenkov Detectors
Breakout Session SC3 – Undulator
ENE 428 Microwave Engineering
Presentation transcript:

A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop, SLAC 1 Manfred Wendt Fermilab

IR Feedback BPM Pickup (Some) requirements for the IR feedback BPM pickup: –Separate e - and e + beam signals (in case of a single pipe for incoming and outgoing beams) –Sufficient bandwidth (for bunch-by-bunch signal processing) –Minimum real estate demands –Insensitive to background particles from the IP Stripline BPM pickup detector: –Directional coupler principle, supplies e - and e + beam signals at separate output ports. Good RF performance. –Directivity restricted by the physical layout of the coupling line to UHV feedthrough output line transition. –Many mechanical/electrical issues, e.g. rigid construction (no microphonics), precise alignment (50 Ω match) of the electrodes, minimum VSWR through the ports! 9/19/2007ILC IR Engineering Design Workshop, SLAC2

FLASH/TTF Stripline BPM (DESY) Complicated mechanics –Assembly, electrode alignment, feedthroughs, electrical contacts, brazing, VSWR optimization, etc. 9/19/2007ILC IR Engineering Design Workshop, SLAC3

ILC IR Stripline BPM 9/19/2007ILC IR Engineering Design Workshop, SLAC4 UHV tight brazed Al 2 O 3 ceramic substrate, printed with a 6 mm wide stripline electrode on the external “air” side “Air” side Up- and downstream ports (“air” side) Vacuum pipe, 20 mm diameter No UHV RF feedthroughs. Rigid construction. Flexible RF optimization in the transition area, no UHV! Extended electrical length, but needs termination! Coupling slot, 7mm wide

2D Simulation Results 9/19/2007ILC IR Engineering Design Workshop, SLAC5 Stripline electrodes: –6 mm wide on 2.5 x 14 mm Al 2 O 3 substrate (ε r = 9.4) –Metallic cover at 3.5 mm distance –Characteristic impedance Z 0 = 50 Ω –Effective dielectric constant: ε eff = –Beam-to-electrode coupling (centered beam): 5.34 % (7mm wide coupling slot) –Position sensitivity: 1.8 dB/mm Normalized difference equipotentials εrεr air vacuum stripline

Δ/Σ Position Characteristic 9/19/2007ILC IR Engineering Design Workshop, SLAC6

Transfer Impedance k: coupling coefficient (~5 %) Z 0 = 50 Ω l: physical electrode length, e.g. 100 mm v 0 = c 0 /  ε eff ≈ m/s –Center frequencies at: (2n-1) f c ≈ 530 MHz –Bandwidth of the lobes: f BW,3dB ≈ 530 MHz 9/19/2007ILC IR Engineering Design Workshop, SLAC7 k

Preliminary Summary Conceptual design of a compact stripline BPM pickup. No UHV RF feedthroughs required. However, needs an UHV ceramic/metal brazing process! Requires broadband port termination, e.g. using diplexers based on hybrids. Offers flexible optimization of the stripline to output port transition, not in vacuum! Possible next steps(???!!!): –Full 3D electromagnetic modeling and optimization. –Evaluate sensitivity to IP background. (WHO?) –Prototyping and RF characterization on the test bench. –UHV prototype, beam measurements?! 9/19/2007ILC IR Engineering Design Workshop, SLAC8