DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

MOD 326 – Allocation of Unidentified Gas Following the Appointment of the AUGE August 2010.
Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
CSEPs Update Chris Warner. 2 Background  Review Group 0157  Incremental Improvements (eg: UNC Modifications 0167, 0180V, 0200)  Ofgem CSEP Group 
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
FUTURE OFFSHORE Update on the Consultation Nigel Peace Licensing & Consents Unit 27 March 2003.
A layman’s guide to the structure of LDZ gas charges 27 July 2009 Please note – in the interests of clarity and accessibility, simplifications have been.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
LDZ System Charges – Structure Methodology 26 April 2010.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
DNPD04 LDZ Exit Capacity Charges- Discussion Report Denis Aitchison 27 th July 2009.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
St Austell & Surrounding Parishes Town Framework: Statement of Community Consultation Community Network Panel 3 September 2014.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
Structure of Charges Year-end review for DCMF 22 November 2007.
Customer Charge On behalf of all DNs 25 October 2010.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
Mod 0428 Charge Impact October Affected Supply Point Population.
User Pays User Group 8th December Agenda  Customer voting arrangements  UPUC & UPCEG ToRs  Funding change  Contract refinements register  Future.
Industry Dialogue on xoserve Services 14 th September 2007.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
23 February 2011 IGTRP0030 Potential impacts on Parties of changes to NExA Table.
Transmission Pricing Webinar 12 October Agenda for Webinar Introductions Purpose Potential Areas of Change – Overview –Revenue Proposal –Business.
Work Plan and Key Deliverables 2 November WORK PLAN.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Customer Charge On behalf of all DNs 19 November 2010.
New Customer Contributions for the Water Sector: Workshop 4 August 2004.
User Pays User Committee 12th November 2013
Background Current balance of LDZ System and Customer charges
DNPC03 DNPC03, published in July 2007, changed the LDZ System Charges Capacity/Commodity split from 50:50 to 95:5 The 95:5 split was implemented on 1 October.
Code Governance Review UNC Modification Proposals
Mod 0621 Amendments to Gas Transmission Charging Regime
LDZ System Charges – Structure Methodology 26 July 2010
Modification th July 2008.
The Proposals Change the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible supply.
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
CSEPs Reconciliation Proposals
Questions for Consultation
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Joint Office Presentation for Modification 0678
Presentation on behalf of all DNs Lorraine Goodall - SGN
Mod 0621 Amendments to Gas Transmission Charging Regime
AUG Query Responses 21st November 2013.
Proposed Transitional Gas Exit Arrangements
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Topic Register October 2009
Pricing and Margins Manager National Grid Distribution
Presentation transcript:

DNPC08 Review of Standard LDZ System Charges Consultation Responses 25 October 2010

Summary of Responses 11 Responses 10 Non-confidential, covered here 8 shippers 2 IGTs 1 Confidential General Theme of Responses Overall respondents were fairly negative about the proposals and consultation process Strong support for retaining a common charging structure Many other issues and concerns raised beyond direct questions Responses focussed on overall issues rather than particular analysis undertaken

Summary of Responses to Questions Q1 Should we move to a charging structure which reflects individual network costs? Some support, in principle, but mainly negative response Q2 Do you agree that, based on the analysis shown, transportation to CSEPs and to directly-connected loads should use the same charging functions? Of those commenting explicitly on this (6 respondents), majority agreed Q3 Which of the three options set out ((Parameter Update, Best Fit, or Common Option) would you prefer to be implemented and why? Only Parameter Update option received support (6 respondents) Q4 Is there any reason why the proposals should not be implemented from 1st April 2012? Implementation in 2012 received some qualified support (5 respondents)

DN Draft Proposal Post-Consultation Following consideration of responses, DN initial intentions are to: Propose implementation of Parameter Update methodology from April 2012:  Will retain common function types  Will retain current charging structure with current AQ charging bands  But form of structure will reflect individual DN costs:  “Power” charging function parameter for >732 MWh/a supply points will vary by DN  Resulting relative levels of charges for three charging bands will vary by DN Timing of Final Report submission to Ofgem still under consideration Aim to give at least a year’s certainty of charging structure from these proposals

Main Issues Raised in Responses (1) 1. Common Charging Structure Response view Strong preference for common charging structure expressed Proposals inconsistent with DNO moves to common charging methodology and with assurances given at time of DN Sales DN view All options were based on retaining a common methodology Options explored extent of commmonality desired for charging structure Possible to retain common structure and reflect individual network costs 2 of the 3 options presented gave identical charging structures across all DNs

Main Issues Raised in Responses (2) 2. Data quality and type Response view Data used for analysis was only a snapshot Data is not forward looking Need to consider how residual charges are recovered Need to understand data better to give view/need further analysis DN view Large sample of supply point-connection tier data taken. Don’t expect supply points to move so snapshot represents ongoing position Analysis uses average historical costs. Relatively few new supply points so emphasis is on equitable, stable cost-reflective charges rather than on marginal cost-based signals Use of average historical costs avoids issue of residual charge Consultation is about methodology – key issues raised were not about the analysis undertaken

Main Issues Raised in Responses (3) 3. Impact on IGTs Response view Results for West Midlands and London DNs for medium sized CSEP loads appear inconsistent with other DN results Negative impact for some IGTs for larger supply points within some CSEPs DN view Will double-check WM and London DN results prior to final proposals. As it is, results are similar for these 2 GDNs as for other GDNs Consider results for CSEPs reflect costs. Note that changes will have varying impacts across different types and sizes of supply point – main impacts highlighted in consultation paper

Main Issues Raised in Responses (4) 4. Other methodology issues Response view Why are costs of LTS Maintenance only allocated to LTS? Reflecting varying costs by connection point pre-supposes that customers can change their connection point DN view LTS-related costs impact on charges for all supply points since analysis was based on tiers used not just tiers connected to. Purpose of methodology is to reflect the average costs typically incurred for supply point types. Acknowledged that customers cannot change their connection once established.

Main Issues Raised in Responses (5) 5. Consultation process and timing Response view Should have involved shippers more; better options could be developed Consultation should be delayed until new governance process is in place Not the right time for these changes since fundamental market reforms coming DN view DNs presented outline of issues being considered at DCMF prior to formal consultation and received little feedback and no alternative proposals Collection of data and analysis has been ongoing for 2 years so appropriate to conclude now DN transportation charging is a significant element of gas supply cost and DNs have duty to review. Important to reflect major industry change – DN Sales