Integrity  Service  Excellence Contracting for Development Efforts Presenters: AFMC/PKQ Cecelia Benford and Mike Grove 20-21 Apr 10 1 DoD Acquisition.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Parallel Flow Visualization/Mitigation Proposal
Fiscal Law Proposal Mary Margaret Evans Director DRAFT.
Effective Contract Management Planning
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
POLICY AND OVERSIGHT DIVISION (POD) February 2014 Documentation of Evaluation for Award 1.
Program Management Office (PMO) Design
Policies and Procedures for Proper Use of Non-DoD Contracts Revised April 19, 2005 Deidre A. Lee Director, Defense Procurement and Acquisition Policy Office.
Closeout (Preparing for the End)
0 Cost, Price, and Finance DFARS Cases of Interest Date: 24 October 2006 Bill Sain Senior Procurement Analyst Defense Procurement and Acquisition Policy,
Chapter 3 Project Initiation
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Project Procurement Management
W5HH Principle As applied to Software Projects
2 Patricia Olsen Vice President, Contracts, Pricing & Estimating The Boeing Company – Integrated Defense Systems August 4, :00 PM Incentive Fee.
Performance-Based Funding in Higher Education Presentation by Arthur M. Hauptman Financing Reforms for Tertiary Education in the Knowledge Economy Seoul,
Software Development Contracts and Legal Issues Cost plus Fixed price Combined.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Purpose of the Standards
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
XII- COST CONTROL, MONITORING & ACCOUNTING
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
1 PMIG PUBLIC SECTOR PROCUREMENT BEST PRACTICES & LESSONS LEARNED Kevin James Barrie Kroukamp.
Incentive Contracts FAR Subpart 16.4 Level II PIP Presentation Ashley McQueen December 6, 2010.
INCENTIVE CONTRACTS David Dudley (ESC Pricing Chief) Paul Hovsepian (Raytheon VP, Contracts)
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
Unclassified. Program Management Empowerment and Accountability Mr. David Ahern Director, Portfolio Systems Acquisition AT&L(A&T) 14 April 2009 The Acquisition.
Army Directorate of Public Works Support Contractor of the Year Carlos Garcia Owner/CEO KIRA Maximizing Return on Investment in Business Development.
Software Project Management Lecture # 8. Outline Chapter 25 – Risk Management  What is Risk Management  Risk Management Strategies  Software Risks.
N By: Md Rezaul Huda Reza n
4.2 Develop Project Management Plan
Donald R. Rainey, Sr., CPPB/VCO Director, Office of General Services Virginia Department of Social Services.
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT Alan Chvotkin Senior Vice President and Counsel Professional Services Council DEFENSE ACQUISITION.
Risk Assignment in The Delivery of a Project  RISK! –Construction projects have lot of it –Contractors manage it –Owners pay for it.
PROJECT MANAGEMENT. A project is one – having a specific objective to be completed within certain specifications – having defined start and end dates.
Managing Fixed Price Development Programs Presented by John Pritchard Professor of Contract Management Defense systems Management College.
1 PRICING COMMUNITY OF PRACTICE AND OTHER PRICING TIDBITS NCMA HOT TOPICS Ms. Cecelia M. Benford.
Phoenix Convention Center Phoenix, Arizona ANDREA L. KINCAID DLA Energy Track 5 Project FinanceSession 6 Renewables Through Private Financing.
Stuart A. Hazlett Deputy Director, OUSD(AT&L) Defense Pricing Defense Procurement and Acquisition Policy A Presentation to NCMA Pentagon 8 September 2011.
2 William P. McNally Assistant Administrator for Procurement NASA Procurement Tenets August 4, 2008 NCMA Conference.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Project Procurement Management
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
DAU MDAP Assist Capabilities Status Jess Stewart 16 November 2009.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
Parts Management Re-engineering and Warfighter Support International Society of Logistics May 17, 2005 Gregory E. Saunders Director, Defense Standardization.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Appendix B of RMG 1-5 Project Tasks for Mid Term Exam Provide items listed below in briefing chart format. 1. Project introduction/background/orientation.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
Evaluation. What is important??? Cost Quality Delivery Supplier Expertise Financial Stability Coverage Product Offerings Do you intend to negotiate?
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
Contracting Officer Podcast Slides
Evaluating Small Business Participation
SERVICES ACQUISITION REFORM ACT OF 2003 A STATUS REPORT
Commercial Item Acquisitions: A Brief Update
Life Cycle of Federal Acquisition
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Small Business and Subcontracting.
Managing Fixed Price Development Programs
Advances in Aligning Performance Data and Budget Information:
PROJECT DELIVERY METHODS
Helene Skikos DG Education and Culture
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Integrity  Service  Excellence Contracting for Development Efforts Presenters: AFMC/PKQ Cecelia Benford and Mike Grove Apr 10 1 DoD Acquisition Insight Days

Overview Overview Background Is It Policy? What We Learned from Past Acquisition Programs Industry Inputs Risk Analysis Considerations Fixed Price Risk Analysis Contract Types Incentives and Award Fees Other Considerations Current Programs What Can You Do? Take-Aways 2

BackgroundBackground Age old problem; significant cost overruns on development contracts Not unique to DoD –Transportation –Energy –Construction –Technology projects 3

Background, cont’d GAO report SP, 30 Mar 09, “Assessment of Selected Weapon Systems” –Reviewed 96 DoD major defense programs –R&D costs 42% higher than original estimate –Causes include: Poor program foundations and inadequate knowledge for developing realistic cost estimates Moving forward with artificially low cost estimates, optimistic schedules and assumptions, immature technologies/designs, and fluid requirements Changing or excessive requirements Imbalance between wants and needs 4

Background, cont’d Moving away from the cost type contracts toward a more fixed price environment –What’s changed? Senator McCain was the forerunner for pushing for expanded use of fixed-price contracts based on realistic cost estimates The outcome would be to enforce discipline in the procurement process; ensure clearly defined requirements; realistic schedules; and that costs won’t exceed promised price 5

Is It Policy? Section 818 of FY 2007 NDAA repealed Section 807 of the FY 1989 NDAA regarding the determination of contract type for development programs –Act required urgent language resulting in Interim DFARS Case 2006-D053 –As of 22 Jan 10, Office of Information and Regulatory Affairs cleared final DFARS rule; DAR staff preparing for publication DODI , Enclosure 2, Procedures, EMD Phase –Contract type shall be consistent with level of program risk; may be fixed price or cost Mr. Van Buren, SAF/AQ, Air Force Acquisition Business Rules of Engagement memo, dated 4 Feb 10, addresses Program Managers and discusses contract types for development programs –Weapons Systems acquisitions should normally begin with fixed price incentive fee or cost plus incentive contracts and move to fixed price incentive fee or firm fixed price for production 6

Is It Policy? cont’d DFARS implementation language states Milestone Decision Authority (MDA) shall select, with the advice of the contracting officer, the contract type for a development program at the time of Milestone B approval –Include level of program risk and reason for proceeding with Milestone B approval despite the risk –The MDA must approve cost-type contract, based on a program being so complex and technically challenging that use of a fixed- price type contract would not be practicable 7

Is It Policy? cont’d Currently accomplished on a case by case basis as programs go forward on developing acquisition strategies Goal is to realize the benefits of a fixed price contract where the technology is mature and has already been operationally tested Air Force has committed to Acquisition Improvement Plan –As part of this acquisition improvement plan, the Air Force will emphasize realistic budgeting based on realistic program cost estimates –This is within keeping with the overall DoD goal 8

What We Learned from Past Acquisition Programs What We Learned from Past Acquisition Programs The use of fixed price development contracts was discouraged after programs start overrunning costs A400M – “an example of the problem posed by fixed-price contracts.” Jacques Gansler –EADS officials state seven governments should share the burden of the cost overruns because of changes in contract terms and designs forced on it by these parties –A-12 Avenger II, Advanced Tactical Airplane development started in mid-1980’s when defense spending less scrutinized. The program was in litigation until June 2009 when US Court of Appeals made its ruling stating Navy justified in canceling program 9

Industry Inputs Industry Inputs Contractors say the contractual and financial burdens are placed on the contractor They are concerned about a final price for a contract that could last almost two decades Boeing Chief Financial Officer James Bell stated “Fixed price development is a tough contract. It is very, very difficult.” 10

Risk Analysis Considerations Four elements must be aligned for successful implementation of this strategy –Requirements must be stable, detailed and technically sophisticated –Contractors must have clear understanding of the requirements –Expert contract negotiations of a fixed price incentive arrangement –Willingness to adjust requirements in order to meet the fixed price, if needed 11

Fixed Price Risk Analysis What are the similar development efforts by the known prospective offerors? Are specifications precisely defined and how have they been proven? How realistic and reliable are the Government’s cost estimates? Is there an equitable allocation of the risk between the Government and the contractor? What are the indications that threat-related programs, and funding priority are sufficiently stable for a low probability of Government-initiated major changes during contract performance? What are the “off ramps”? –Bottom Line – Conduct a risk assessment 12

Contract Types Types of contracting methods considered for outcome of controlling costs –Firm Fixed Price arrangement – Government pays a set price, no matter the contractor’s costs –Fixed Price Incentive – Government sets a maximum price, with a negotiated target cost and target profit –Cost Plus Incentive Fee Fixed Price Award Fee contracts 13

Contract Types, cont’d An award fee contract may be appropriate when contractor performance cannot be measured objectively –Provides for an award fee pool –Using a “metrics-based award fee criteria” should relate directly to the objectives to be accomplished and accurately measure the intended performance objectives –Not currently encouraged Incentives are the preferred approach 14

Other Considerations Development and production period of performance will impact schedule and cost constraints –May require supporting current technology longer which increases overall program costs –Avoid developing and maturing dependent technologies in parallel with system development Billing prices must be established for interim payment for fixed price incentive contracts –Contractors have valid complaint that cash flow will be impacted. If requirements change, expect requests for equitable adjustment from the contractor 15

Current Programs Small Diameter Bomb II (SDB II) a program out of Air Armament Center, is an acquisition pathfinder that is expected to lead the way for acquisition reform –Goal to maintain the airframe characteristic, flight dynamics and weight of the original Boeing 250 lb weapon –Contract type is fixed-price incentive KC-X Tanker is a Boeing 767-based offering –Contract type is expected to be fixed-price development The Total Integrated Engine Revitalization Program (TIGER) is an Army fixed price incentive contract –The program has a transition year with three program year determinations –The contractor’s performance is measured by four metrics: engine availability, durability, cost, and weights assigned to four incentive metrics based on events of the particular program year. 16

What Can You Do? Develop acquisition strategy early Work with the Acquisition Team and Industry early Must enforce strict adherence to agreed upon terms Ensure experienced government personnel are assigned to the acquisition with appropriate fact- finding, negotiations, program management and technical skills 17

Take-Aways?Take-Aways? Buy the right thing, the right way Bold ideas and sweeping changes cause a fear factor when in fact we should focus more on outcomes Is more policy needed or do we work with the tools we already have? 18