PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
PRR 692 APPEAL PRESENTED BY: Constellation NewEnergy DATE: November 2, 2006.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
Wind Cost Allocation Task Force Update to WMS February 17, 2009.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee September 7, 2006.
RTWG Report to TAC August 5, 2010 Howard Daniels.
1 Review of Aging Projects Additional Materials July 16, 2015.
PRR 568 – Settlement Timeline PRR 638 – Invoice Timeline PRR 599 – Mismatch Notification COPS January 2006 Updates.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
June 17, Strategic Framework Business Definition and Strategic Issues Board of Director’s Meeting June 17, 2003 ERCOT Strategic Planning Task Force.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
Frequency Control Task Force Report to WMS March 22, 2006.
CRR Shortfall – Revenue Equalization Part 3 (Continuation from 3/5/08 TPTF discussion) Bill Barnes/Sharon Wang TPTF 3/21/2008.
1 TDTWG Update to RMS September 1, Discussion Items ERCOT presented Q2 Performance Measures Reviewed SCR 786 with action item to TXSET regarding.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
1 TAC Report to the ERCOT Board June 21, TAC Summary 8 PRRS 8 PRRS Withdrawal of PRR 552 Withdrawal of PRR 552 Potomac Recommendations Potomac.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
Unit-Specific Bid Limits based on Modified Generic Cost.
1 TAC Report to the ERCOT Board February 21, 2006.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
1 TAC Report to the ERCOT Board February 16, 2005.
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Commercial Operations Sub-Committee Update to TAC April 4, 2008.
Feb 18, TAC Report to the ERCOT Board February 18, 2003.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2004.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee November 2, 2006.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
EILS Discussion February WMS. Charge to WMS from PRS The benefit. The cost based on the EILS PRRs. Changes in Market since April 17, 2006.
PRR 568 – Day 17 to Day 10 Analysis Implementation Recommendation TAC December 2005.
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
1 Frequency Control Task Force Report to WMS July 19 th, 2006.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
QSE Managers Working Group Meeting Notes November 10, 2009 Report to WMS November 18, 2009 Jennifer Troutman – Vice Chair.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
QSE Managers Working Group Meeting Notes 9 October, 2008 Report to WMS 22 October, 2008 David Detelich - Chairperson.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
1 Commercial Operations Working Group Update to TAC April 7, 2005.
PRR619 Procedural History DSWG discussed the need to reduce market exposure to default should negative bids be selected and result in negative $/MW MCPC.
TAC Report to the ERCOT Board
Principles of Participation in Real-Time Co-optimization
Presentation transcript:

PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006

RPRS Capacity Procurement Scheduled On-line Capacity Day Ahead Forecast Load Regulation & Responsive

RPRS Procurement (Takeaway from Joel Mickey’s Presentation) When procuring RPRS, ERCOT system utilizes the recent Load forecast produced by the mid-term Load forecast tools (includes the added standard deviation). The available High Sustained Limit (HSL) as indicated in the Resource Plan is considered in the RPRS procurement process; those Off-line and available Resources are subject to RPRS procurement. Before procuring capacity in Step 2, the step 1 Local Congestion procurement will be considered as On-line and available capacity. Schedule mismatches are not considered in the RPRS procurement process. RPRS does not consider schedules with ERCOT as a Resource during procurement; if there is enough online capacity from other QSes to cover the forecast load then there is no impact. If however, many QSEs schedule with ERCOT as resource, it could result in RPRS procurement.

Desired Market Behavior Accurate load forecast QSE’s scheduled load should approximate that QSE’s corresponding Resource Plan prior to RPRS procurement unless the QSE is willing to pay for RPRS procurement. ERCOT should minimize day-ahead load forecast error within some “reliability” tolerance; this tolerance can be applied to other a/s in order to minimize RPRS procurement. Resource Plan should reflect the sum of all QSE day-ahead load schedules finalized prior to the time of RPRS procurement.

Desired Market Outcomes Through market-based mechanisms, the market procures enough capacity that minimizes the need for ERCOT-based capacity procurement. The difference between revenues collected for capacity service approximates the payments made for this service.

How do PRRs 674, 676, and 678 measure against Desired Market Behaviors and Outcomes ?

Action Items for August 2 nd PRS Meeting Finish discussion on PRRs 674, 676, and 678 Vote on one or two PRR alternatives to take to TAC Recommendation that a task force continue the assessment of the ERCOT standard deviation (SD) or “reliability tolerance” procurement in addressing: –The application of the SD into the same day a/s market –The proper amount of additional load forest “reliability” tolerance. Closure on the Resource Plan vs. actual load RPRS procurement for June 20, 2006.