Super KEKB project WIN03 Oct 9 th, 2003 Nobu Katayama KEK.

Slides:



Advertisements
Similar presentations
The Belle Silicon Vertex Detector T. Tsuboyama (KEK) 6 Dec Workshop New Hadrons with Various Flavors 6-7 Dec Nagoya Univ.
Advertisements

1 Luminosity of cm -2 s -1 at KEKB Preliminary plan Machine parameters RF system Vacuum system Injector Y. Ohnishi KEK Snowmass2001.
M. Sullivan Mini-workshop on the MEIC design Nov 2, 2012.
Super B factory plan at KEK Masa Yamauchi KEK Super B Factory Workshop April 20-22, 2005 Honolulu Why, how, what, who, when and how much?
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
October 1999The First Events from BELLE First Events from BELLE HEP Seminar Brookhaven National Lab Daniel Marlow Princeton University October 21, 1999.
SLAC Accelerator Department Super-B-Factory John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department Caltech Meeting.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Search for LFV  decays involving     ’ at Belle Y. Enari, Belle collaboration Nagoya University.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
June-10 th, 2005 WIN05 Super B factories Shoji Uno ( KEK) Super B factories Shoji Uno ( KEK) June-10 th, 2005 WIN05 Delphi, Greece Contents 1. Physics.
Accelerator Summary 1/22/2004 K. Oide (KEK). Accelerator Session: PEP-II IR Upgrade M. Sullivan (SLAC) Super KEKB Optics & IR Y. Ohnishi(KEK) Super-PEP-II.
16 April 2005 APS 2005 Search for exclusive two body decays of B→D s * h at Belle Luminda Kulasiri University of Cincinnati Outline Motivation Results.
10 36 ??? 20 Apr K. Oide Super B Workshop.
Belle Upgrade Plan - An Overview - M.Yamauchi KEK January 2004 Super B Factory Workshop University of Hawaii, Honolulu.
Beam-beam studies for Super KEKB K. Ohmi & M Tawada (KEK) Super B factories workshop in Hawaii Apr
Issues for Optimization of a Super-B Factory John T. Seeman SBF Workshop SLAC June 14, 2006.
Status of Belle Super KEKB plan SLAC seminar March 21 st, 2003 Nobu Katayama KEK.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
June 2000Status of BELLE1 Beyond e + e - Workshop The Homestead Glen Arbor, MI Daniel Marlow BELLE Princeton University June 17, 2000.
July 2000Results from BELLE1 IV th Rencontres du Vietnam Hanoi, Vietnam Daniel Marlow BELLE Princeton University July 22, 2000.
March 2000The First Data from BELLE1 First Data from BELLE HEP Seminar University of Chicago Daniel Marlow Princeton University March 13, 2000.
1 Optics and IR design for SuperKEKB Y.Ohnishi 1/19-22, 2004 Super B Factory Workshop in Hawaii.
January 2000The First Data from BELLE1 First Data from BELLE HEP Seminar TRIUMF Daniel Marlow Princeton University January 10, 2000.
Future Very High Luminosity Options for PEP-II John T. Seeman For the PEP-II Team e+e- Factories Workshop October 13-16, 2003.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
SLAC Accelerator Department PEP-II Super-B-Factory Collider John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department.
Super B KEK - Super KEKB -
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Status and Physics Prospects of the SuperKEKB Project Y. Horii Tohoku Univ. (Japan) 1 5th March 2011, La Thuile 2011.
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
The Belle Experiment at KEK Christoph Schwanda Institute of High Energy Physics (HEPHY) Austrian Academy of Sciences Symposium Wissenschaftliche Kooperation.
Rare B Decays at Belle Hsuan-Cheng Huang ( 黃宣誠 ) National Taiwan University 2 nd BCP NTU, Taipei June 7 - 9, 2002.
Welcome to the 1 st Open Meeting of the Super KEKB Collaboration. (T. Browder, University of Hawaii) [All talks and discussions about the detector, physics.
M. Adinolfi - University of Bristol1/19 Valencia, 15 December 2008 High precision probes for new physics through CP-violating measurements at LHCb M. Adinolfi.
SuperKEKB B factory April 12, 2006 Nobu Katayama (KEK)
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
July 7, 2008SLAC Annual Program ReviewPage 1 PEP-II in Run 7 and Transition Planning John T. Seeman Assistant Director PPA/LCLS.
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
New Ideas for Super B Factories for Flavour Physics Steve Playfer University of Edinburgh, Future Directions, BEACH 2006 Lancaster, July 2006.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
1 Koji Hara (KEK) For the Belle Collaboration Time Dependent CP Violation in B 0 →  +  - Decays [hep-ex/ ]
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
A High Statistics Study of the Decay M. Fujikawa for the Belle Collaboration Outline 1.Introduction 2.Experiment Belle detector 3.Analysis Event selection.
Super B Factories December 15, 2006 CKM Masa Yamauchi KEK.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
Pavel Pakhlov ITEP, Moscow For the Belle/Belle-2 Collaborations Belle-2 experiment at SuperKEKB New Physics P h y s i c i s t Unlike the cat we can build.
Belle II Science and Overall Project Tom Browder University of Hawaii.
Belle II status and plans
Belle II at SuperKEKB Kurtis Nishimura University of Hawaii
Status of BESIII and upgrade of BESIII
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Super-KEKB Collaboration
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Overview of SRF system of Ring and Linac (1)
Francesco Forti SuperB Workshop LNF, March, 2006
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
Hadron Fragmentation New Results from Belle
SuperKEKB Proto-collaboration
SuperB IRC Meeting Frascati, Nov. 13th 2007
How can we study the magnetic distortion effect?
MEIC New Baseline: Part 7
MEIC New Baseline: Performance and Accelerator R&D
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Super KEKB project WIN03 Oct 9 th, 2003 Nobu Katayama KEK

Octl 9th, 2003Nobu Katayama2 Outline § Belle/KEKB status § Super KEKB plan –Physics –Detector study –Accelerator study

Octl 9th, 2003Nobu Katayama3 KEKB status 1999/10  2003/7/1 > 50 fb  1 in years 2002, 2003 LER~1.55A HER~1.1A With SRF  cm -2 s fb -1

Octl 9th, 2003Nobu Katayama4 Best day (May 12 th, 2003) pb -1 /day recorded

Octl 9th, 2003Nobu Katayama5 SVD 1  SVD = 54 ladders = 32 ladders SVD1SVD2 R BP 1.5 cm R BP 2.0cm R L1 3.0cm R L1 2.0cm R out 6.0cm R out 8.8cm

Octl 9th, 2003Nobu Katayama6 SVD 1.6SVD2.0 R BP / R L1 / R out 20/30/60 mm15/20/90 mm Acceptance 23º<  <139º17º<  <150º # of layer/# of ladders3 / 324 / 54 Max. length (mm) Orthogonal readoutBuilt in double metal layer Flexible printed circuit Isolation of detector bias Integrated capacitor on DSSD Optical isolator in a buffer circuit Fast triggerNoYes Shaping time ~1  s~0.5  s  z (90deg.,p=2GeV/c) ~35  m~25  m Measured Signal to Noise ratio ~2025(lyr4)~36(lyr1) Radiation tolerance~2Mrad~20Mrad How much improved?

We have just started! More and more Bs  Super KEKB

Octl 9th, 2003Nobu Katayama8 Mission 1: 300 fb  1 Precision test of KM unitarity Search for new physics in B and  decays Identify SUSY breaking mechanism Bread’nd butter for B factories See quantum effect in penguin and box loop Very important if New physics = SUSY Mission 2: 3,000 fb  1 Mission 3: 30,000 fb  1 Mission of Super B Factory(ies)

Octl 9th, 2003Nobu Katayama9 In which processes can we find New Physics? § Rare decays –B  X s ,  –B  K*  § CP violations –B   K S and  ’K S –B  X s ,  § b  c emitting charged Higgs § Forbidden decays by SM § Forbidden/rare decays of 

Octl 9th, 2003Nobu Katayama10 CPV in penguin decays Belle (August 2003) A CP (  K S )=  0.96±0.50 A CP (  ’K S )=  0.43±0.27 A CP (J/  K S )=  0.731±0.057 Prove A CP (  K S,  ’K S )≠A CP (J/  K S ) In SM, New phase in penguin loop may change this relation KEKB PEP-II Next B factory 5  discovery KSK+K-KS’KSKSK+K-KS’KS  A CP

Octl 9th, 2003Nobu Katayama11 Atmospheric Neutrinos Can Make Beauty Strange? § Leptogenesis models inspired by the naïve SO(10) unification exist where the near-maximal mixture of  and  results in large mixing of RH super-b and super-s, giving O(1) effects on b  s transitions such as –Asymmetry in B   K s (effect is in first order) –B s mixing –b  s  (effect is of the order of |C g (NP)| 2 ) § Ref. R. Harnik, D. Larson, H. Murayama and A. Pierce (hep-ph/ ), D. Chang, A. Masiero and H. Murayama (hep-ph/ ) § Many other GUT inspired models are coming up!

Octl 9th, 2003Nobu Katayama12 Dominant Right-Right Mixing case

Octl 9th, 2003Nobu Katayama13 SUSY effect in B  K*  § § These measurements are excellent probe to search for SUSY § § Inclusive decay, b  sll, is much less model dependent. An e + e  B factory provides a unique opportunity to measure this by pseudo reconstruction technique A.Ali m(  ) 2 distribution F/B asymmetry SM SUSY models with various parameters set

Octl 9th, 2003Nobu Katayama14 Rare decays of 

Octl 9th, 2003Nobu Katayama15 Charged Higgs in tree decay B  D (*)  vs  D    - Large branching fraction: ~1% - Uncertainty in form factor cancels in the ratio  (B g D  )/  (B g D  ). -  polarization is more sensitive to H ±. M.Tanaka

Octl 9th, 2003Nobu Katayama16 Comparison with an LHC experiment  (B  D  )/  (B  D  ) at B factory with 5,000 fb -1 B factories don’t really do tree diagrams of new particles with the exception of charged Higgs… But together with LHC measurements, we can determine tan  !

Octl 9th, 2003Nobu Katayama17 What can we do? Compilation at the 5 th High Luminosity WS

Octl 9th, 2003Nobu Katayama18 KEKB upgrade strategy Present KEKB L= L=10 35 L~10 36  dt =500fb  1 One year shutdown to: replace vacuum chambers double RF power upgrade inj. linac g C-band larger beam current smaller  y * long bunch option crab crossing I LER =1.5A  2.6A I LER =9.4A I LER =20A Constraint: 8GeV x 3.5GeV wall plug pwr.<100MW crossing angle<30mrad  dt =3000fb  1 before LHC!!

Octl 9th, 2003Nobu Katayama19 Detector upgrade § Higher luminosity collider will lead to: –Higher background § radiation damage and occupancy in the vtx. detector § fake hits in the EM calorimeter § radiation problem in the tracker and KL  detector –Higher event rate § higher rate trigger, DAQ and computing § Require special features to the detector –low p  identification for s  reconstruction eff. –hermeticity for “reconstruction”

Octl 9th, 2003Nobu Katayama20  / K L detection 14/15 lyr. RPC+Fe Tracking + dE/dx small cell + He/C 2 H 5 CsI(Tl) 16X 0 Aerogel Cherenkov counter + TOF counter Si vtx. det. 3 lyr. DSSD SC solenoid1.5T 8GeV e  3.5GeV e  Detector upgrade: an example  2 pixel lyrs. + 3 lyr. DSSD  tile scintillator  pure CsI (endcap)  remove inner lyrs.  “TOP” + RICH New readout and computing systems

Octl 9th, 2003Nobu Katayama21 SVD occupancy and CDC hit rate § Current most inner layer of SVD’s occupancy is 3~5% § Current most inner layer of CDC’s occupancy is 2~3% § With luminosity, two layers of pixel + silicon (~15cm R) + CDC survives § With luminosity, Pixel + Silicon a la super BaBar design? Radius = 15cm Cathode Inner Main

Octl 9th, 2003Nobu Katayama22 Does CDC work with L>10 35 ? § § Smaller cell § § Faster gas § § Larger starting diameter Yes !!

Octl 9th, 2003Nobu Katayama23 Small Cell Chamber (with SVD2) ~20cm

Octl 9th, 2003Nobu Katayama24 XT curve for small cell measured Small cell Normal cell

Octl 9th, 2003Nobu Katayama25 New PID detector Present Belle: Aerogel Cherenkov counter both for barrel and endcap. TOP counter for barrel & Aerogel RICH for endcap Requirements: - Thin detector with high rate immunity - >3  /K separation up to 4GeV/c - low p  /  separation

Octl 9th, 2003Nobu Katayama26 Time of propagation (TOP) counter 20mm time & X sensitive PMTs Fused silica(n=1.47) Reflection mirror 200mm A few meters photon hits

Octl 9th, 2003Nobu Katayama27 Aerogel RICH for endcap § Single event display § Hit distribution

Super KEKB Accelerator upgrades

Octl 9th, 2003Nobu Katayama29 What’s impressive about KEKB § KEKB and PEP-II have achieved the highest luminosities in history of particle accelerator/collider § KEK and PEP-II have recorded more than 140 fb  1 of data and continue to accumulate Thanks to tremendous efforts by and ingenuity of the commissioning and operation groups

Octl 9th, 2003Nobu Katayama30 Features of KEKB § Super conducting RF cavities and ARES cavities –Holds more than 1A of beam current with SRF § IR region –3  m  100  m: the smallest beam size among the storage rings –Finite crossing angle § Solenoids for positron ring –Suppress photo-electron clouds § Flexible Optics –Real time monitor and correction system

Octl 9th, 2003Nobu Katayama31 Challenges with Super KEKB § High beam currents (LER 9.4A+HER4.1A) –Heating, breakdown will occur –Ultra high vacuum, beam lifetimes –Power consumption (80~100MW) –Stability of the beam/photo electron clouds –Injection –Noise/Background to detector § Beam-beam effect (tune shift of 0.05 assumed for ) –Beam-beam tune shift; unknown –For a double ring machine, more than 50 parameters must be optimized simultaneously –Hard to maintain the optimum beam conditions due to disturbances § Optics with very small focusing depth (3mm) –KEKB vertical beta is <6mm (world record) –Shorter bunch length:=more peak current gives more power dissipation, shorter lifetime

Octl 9th, 2003Nobu Katayama32 Towards Super KEKB § LER 9.4A + HER 4.1A (4~6 times as now) –Rewind solenoids –Double RF systems –Replace vacuum chambers of the both rungs –Cooling system § More focusing and shorter bunch (half as now) –New IR § Charge switch and better/faster injection –8GeV positron injection with a C-band linac –Damping ring –New positron production target § Crab crossing

Octl 9th, 2003Nobu Katayama33 Accelerator Upgrades for Super KEKB K. Izu 2003 § Crab cavities § More RF sources § More cavities § Super Belle § New IR § New beam pipe & bellows § Damping ring § Positron source § Charge switch by C-band

Octl 9th, 2003Nobu Katayama34 Machine parameters  x = 20 cm  x = 15 cm

Octl 9th, 2003Nobu Katayama35 Crab cavity developments crossing angle 22 mrad Head-on(crab) ◊ ◊ ◊ ◊ ◊ yy (Strong-weak simulation) (Strong-strong simulation) l Crab crossing may boost the beam-beam parameter up to 0.2! l Superconducting crab cavities are under development, will be installed in KEKB in K. Ohmi K. Hosoyama, et al

Octl 9th, 2003Nobu Katayama36 (Each building for 4 〜 6 RF units.) D8D7 D4 D10 D11 new D1D2 D5 LER-RF (ARES) HER-RF (ARES) HER-RF (SCC) 5 buildings should be added. 50% more RF cavities Double # of Klystrons #RF/#SRF 30/8  44/12 #Kly/ACPW(MW) 23/45  56/73

Octl 9th, 2003Nobu Katayama37 Energy exchange (HER : e + /LER : e  ) § Advantages : –Effect of photoelectron cloud can be reduced. ■ Positron energy increases. –Injection time can be reduced. ■ Intensity of injector : e - > e + ■ Beam current : e - > e + § Unknowns : –Multipactering occurs in e + at HER or not ? ■ Height of vacuum chamber is smaller than LER. –Is fast ion instability safe for e - in LER ? ■ Electron energy decreases. § Major upgrade of injector linac is needed. –Energy upgrade : C-band scheme

Octl 9th, 2003Nobu Katayama38 Linac upgrades for 8 GeV e + 2-Bunches for Simultaneous Injection 1-st bunch -> e- Injection 2-nd bunch -> e+ production S-band accl. units are replaced with C-band units. Accl. Field 21 -> 41 MV/m e+ Damping Ring for lower emittance Achieved  40 MW (0.5ms, 50pps),  > 40 MV/m (1m structure) Goal: 40 MW 40 MV/m

Octl 9th, 2003Nobu Katayama39 Summary § Belle and KEKB have achieved 1.06×10 34 cm  2 s  1 and 158 fb  1 § We have installed SVD2, two more RF cavities and come back online in 2 wks § We are hoping to upgrade KEKB and Belle to reach luminosity and to accumulate 3000fb  1 before 2010 when LHC starts producing results –Simulation tells us that we may reach 5  with head-on collision with crossing angles using the crab cavities