NEDM Collaboration Meeting, November 1-3, 2007 Valve Progress Steve Williamson, UIUC.

Slides:



Advertisements
Similar presentations
Liquid Hydrogen Absorber
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Set-Block Design Issues August 12 th, Frederickson Skin and Spar MBU Background  Set blocks are used to verify the distance between the bed of.
Magnetic fields R&D update B. PlasternEDM November 2007 Collaboration Meeting Results from prototype studies of a 1/6-scale B 0 coil with Results from.
©2008 Armstrong International, Inc. Basic Steam Trap Operation.
EDM Collaboration Meeting, October 5-7, 2006 Valve R&D Steve Williamson UIUC.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Russ Rucinski, PPD/MD/DZero Ops DZero Solenoid status November 29, 2004.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Compressed Air Piping Systems by Asahi/America
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
METAL CASTING PROCESSES 1.Permanent Mold Casting Processes ©2007 John Wiley & Sons, Inc. M P Groover, Fundamentals of Modern Manufacturing 3/e.
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
What is the most Important system on your vehicle?
DHB, nEDM Collab. Mtg, 15/16 Apr 04 UIUC Test System (Beck, Chandler, Hertzog, Kammel, Newman, Peng, Sharp, Williamson, Yoder; Blackburn, Kenyon, Thorsland)
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
NEDM Collaboration Meeting, May 25-26, He Relaxation Steve Williamson UIUC.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
Forging new generations of engineers. Basic Pneumatics.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
1 NEDM 4 He Purifier and Other Cryogenic Issues David G. Haase North Carolina State University Update on Cryovessel Engineering Evaporative Purification.
1 IL 3 He Relaxation Jacob Yoder UIUC Feb
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
EDM Collaboration Meeting, February 14-15, 2007 Valve Bucket-Dewar Tests Steve Williamson UIUC.
Key luminosity issues of the positron source Wei Gai.
CM1 Thermal Cycle CM1 Warmup –1/4/12 (Wed.) to 1/6/12 (Fri.) (~50 hours) –Verified turbo interlock system works CM1 Cooldown –Began 1/9/12 (Monday) –At.
HV-SQUID Compatibility Test Study the SQUID performance in a HV environment. Study the HV breakdown –in superfluid under pressure. –using different materials.
EDMEDM EDM Fast Start, May 23, 2006He3S, Steven Williamson EDM Fast Start Helium-3 Services (He3S) Steven Williamson May 23, 2006.
1.3GHz Input Coupler for ILC
He3 dilution refrigerator
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Summary of Valve Design Status for nEDM L. Bartoszek BARTOSZEK ENGINEERING 6/20/05.
NEDM Collaboration Meeting ASU 2/2008 Preliminary Engineering Report nEDM Central Detector John C. Ramsey Los Alamos National Laboratory.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
Valve Update  Study several stem/seat geometries (Feb)  Demonstrate He II leak tight for 3/8, 1 in. diameter with modest (~ few psi) pressure difference.
NEDM Collaboration Meeting, May 19, 2008 Valve Progress Steve Williamson.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Transport of 3 He by heat flush measurement of 3 He concentration tests of heat flush George Seidel Brown University.
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
Status of Engineering Preparations for CD2/3A nEDM Collaboration Meeting – MIT Bates Jan Boissevain November 2, 2007.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
Attempting to Cost Estimate the nEDM Upper Cryostat Larry Bartoszek, PE Bartoszek Engineering 12/2/04.
NEDM Cost and Schedule Review, February 11, 2005 Upper Cryostat and Valves Cost and Schedule for WBS 3.2, 3.3, 3.4, and 8.2 L. M. Bartoszek D. H. Beck.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Pistons and piston rings
Final Design Cryogenic and mechanical configurations
Teleconf ACS – FREIA 28th March 2017
Design of the Injection Can
at STFC Daresbury laboratory
Update on He3 Services design since the ORNL meeting
Automotive Engines Theory and Servicing
Status of design and production of LEP connection cryostat
Challenges of vacuum chambers with adjustable gap for SC undulators
LARP Vertical Test Facility
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
BASIC PNEUMATICS.
Teleconference ACS – FREIA 19th June 2017
Magnetic shielding and thermal shielding
Automotive Engines Theory and Servicing
Presentation transcript:

nEDM Collaboration Meeting, November 1-3, 2007 Valve Progress Steve Williamson, UIUC

nEDM Collaboration Meeting, November 1-3, 2007 Bucket Dewar Tests  Testing of the Vespel “cork-in-bottle” seat was successfully completed.  1” diameter, 80 lbs closing force  continuous cycles  Leak rate < 3  std. cc/sec (background rate) with super-fluid He at 1.7 K  … But not without some difficulty

nEDM Collaboration Meeting, November 1-3, 2007 Testing Problems  Accidental warm-up caused leak at “press-fit” inlet connection shortly after the Annual Review.  May also have caused cold leak in Vespel (or could have been caused by new flange connection)  Re-fabricated seat and plug had bad surface due to chipped diamond tool.  Re-re-fabricated plug was slightly off-axis.  Actuator motion was impaired by lack of lubrication.  Actuator controller died due to leaky capacitor – paused final cycle test for about a day About a month of frustration Stick-slip from non- concentric plug Sticking in actuator

nEDM Collaboration Meeting, November 1-3, 2007 Postmortem after 10,000 cycles  Visual inspection: no obvious signs of wear except a light ring at seal line.

nEDM Collaboration Meeting, November 1-3, 2007 Diamond machined surface Region where surface has been scraped during closure Vespel builds up in a ridge above the seal line SEM Scans* of “Piston” SEM scan of seal line after a few hundred cycles SEM scan of seal line after >10000 cycles Note: This is NOT the same “piston” Diamond machined surface seems smoother Ridge (Vespel build- up) at seal line is narrower. * Thanks to Steve Clayton!

nEDM Collaboration Meeting, November 1-3, 2007 Another SEM Picture of Seal Line after 10,000 cycles  Ridge seems pretty sharp.  Dust particles (below line) – easy targets for focusing.

nEDM Collaboration Meeting, November 1-3, 2007 Another SEM Picture of Seat after 10,000 cycles  Below seal line, edge is rough – accumulated dirt?  Focusing is not easy. Beveled seat edge Seal edge

nEDM Collaboration Meeting, November 1-3, 2007 Plans for Bucket Dewar Testing  Try to eliminate “popping” of the cork (may or may not be an improvement).  Does not happens if tan(  ) >    is the static coefficient of friction.  For 300K Vespel,   0.35, so  must be > 19°.  At lower temperature,  may be smaller.  Our valve had  =10°.  “Cork Popping” Position Load

nEDM Collaboration Meeting, November 1-3, 2007  Try to reduce closing force.  Engineers: How Much?  Scaling the valve to 3.5 cm diameter implies closing force of 110 lbs.  Everything is easier for lower closing force  Mechanical support of valve can be less massive (lower heat load)  System for transmitting force can be less massive (lower heat load)  Valve wear should be reduced  Try materials softer than Vespel  Kel-F  Acrylic Plans for Bucket Dewar Testing Rockwell Method

nEDM Collaboration Meeting, November 1-3, 2007 K. D. May, “Advanced Valve Technology”, NASA SP-5019, 1965 Soft close-fitting tip could act as “wiper” rather than “scraper”. Plans for Bucket Dewar Testing  Try adjusting seat geometry  May contribute to lowering seating force  May improve immunity to dirt  Some Ideas:  NASA “Scrubber” design  Soft (Kel-F?) wiper on plug

nEDM Collaboration Meeting, November 1-3, 2007 Highest Priority: Full Valve Test  Goals:  Fabricate a full-sized valve  Use reasonable (though not necessarily final) materials  Test it under realistic conditions  LHe II inside at ~1.7 K  Vacuum outside  Hardware required:  Large (12” ID) dewar  Dewar insert with 1 K pot, motion feed-thru, and gas/vacuum/instrumentation lines  A valve

nEDM Collaboration Meeting, November 1-3, 2007 The Dewar  Ordered from Precision Cryogenic Systems  $8.1K  Delivery: 3-4 mo. (~Jan ’08)  Features  Super-insulated (no LN 2 shield)  ~50 l “belly”  Matched in dimensions to insert

nEDM Collaboration Meeting, November 1-3, 2007 The Insert  Ordered from Janis  $27.3k  Delivery: 3-4 mo. (~Jan ’08)  Features:  100 mW cooling power at 2K  LHe throttle valve on 1K pot  6 ½” lines (1 removable)  Two motion feed-thru lines  Large internal vacuum volume

nEDM Collaboration Meeting, November 1-3, 2007 The Valve  Design by Bartoszek Eng. based on Jan’s earlier concept  Double seal (open and closed) using our best design. Open seal hides bellows from 3 He.  Be-Cu bellows assembly (from Mini-flex)  All Be-Cu welding to be performed by vendor  Design of assembly has iterated with vendor  Acrylic body  Current plan is to cast, then final machine.  A glued prototype is being fabricated. Open Seat Closed Seat Plug Bellows Assembly Acrylic Body Inlet Outlet

nEDM Collaboration Meeting, November 1-3, 2007 Valve Issues  Bellows assembly may have long lead time (no estimate yet)  Cast acrylic body may have long lead time.  Fall-back: glue the assembly.  Actuator must be modified: controlled force required when closing and opening.  Delay in dewar and insert  We will do plenty of room temp tests (dewar and insert may not actually be on critical path).  Fall-back: do bucket dewar tests in 3 He refrig. cryostat.  This conflicts with polarized 3 He lifetime studies.