Jet/MET Trigger On-Call Report Ricardo Gonçalo – LIP Jet Trigger Meeting – 31/3/2015.

Slides:



Advertisements
Similar presentations
L2 chains for single-beam menu Muon full reconstruction T2Calo starting from MBTS Ricardo Gonçalo, Denis Damazio.
Advertisements

Jet Slice Status Report Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 9 July 2014.
L2 Online Reinhard Schwienhorst DAQ shifters meeting, 03/12/02.
R. Zitoun, Stony Brook and LAPP CTF Meeting10 February Much Noise About Nothing? Robert Zitoun Stony Brook and LAPP CTF Meeting February 10, 2003.
Jet Trigger Planning R.Goncalo (LIP), D.Miller (Chicago) Jet Trigger Meeting, 22 Sep.2014.
Effect of b-tagging Scale Factors on M bb invariant mass distribution Ricardo Gonçalo.
1 The ATLAS Missing E T trigger Pierre-Hugues Beauchemin University of Oxford On behalf of the ATLAS Collaboration Pierre-Hugues Beauchemin University.
Top Physics Validation: Reconstruction, Simulation and Bytestream Paul S Miyagawa The University of Manchester.
Eric TorrenceJanuary Oregon Tau Activities Tau Trigger Efficiency Z→ττ Dijet Fakes Tau Spin Analysis Tau Trigger Activities Validation HLT Monitoring.
Trigger validation Ricardo Goncalo, RHUL Physics Validation - 14 September 2007.
Single Top Trigger Studies Top Trigger Meeting, 6 June Patrick Ryan, MSU Single Top Trigger Studies Top Trigger Meeting 4 June 2007 Patrick Ryan.
Real Time 2010Monika Wielers (RAL)1 ATLAS e/  /  /jet/E T miss High Level Trigger Algorithms Performance with first LHC collisions Monika Wielers (RAL)
O FFLINE T RIGGER M ONITORING TDAQ Training 30 July 2010 On behalf of the Trigger Offline Monitoring Experts team.
News from the Beatenberg Trigger Workshop Ricardo Gonçalo - 18 February 2009 Higgs WG Meeting during ATLAS Week.
Trigger Offline Monitoring Report Valeria Bartsch (Sussex), Ricardo Gonçalo (RHUL) Trigger General Meeting – 26 th May 2010.
Trigger validation for Event size TrigDecision Jets Electrons Ricardo Gonçalo, RHUL Physics Validation Meeting – 9 October 2007.
Plans for Trigger Software Validation During Running Trigger Data Quality Assurance Workshop May 6, 2008 Ricardo Gonçalo, David Strom.
Friday Oct 30Monday Nov Data09_cos Data09_calophys Data09_cos Data09_calophys Data09_calophys Some of the last.
Progress on H/Abb -> 4b’s channel for the FTK physics case ~ 4jets Trigger w/ and w/o FTK ~ Kohei Yorita Young-Kee Kim University of the FTK.
73X Validation, Feb. 23 rd, 2015 Robert Schöfbeck, Mariarosaria D’Alfonso, Matthias Weber report on 73X rereco Feb. 23 th, 2015 Robert Schoefbeck, Mariarosaria.
Trigger Offline DQ Monitoring DQ Meeting – 27 Oct 2009 Ricardo Goncalo for Trigger Offline Monitoring.
Preparation for the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs sub-group conveners meeting – 9 Jan.09.
Jet Trigger On-Call Shift Summary Ricardo Gonçalo - LIP.
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
RPC DQA but also Monitoring for the DCS group: status and prospective for Marcello Bindi RPC L1MU Barrel DQM - 08/05/2013.
Cern -April 24, 2007Atlas Data Quality Workshop M. Primavera1 Muon EF Data Quality Muon EF Data Quality M. Primavera - I.N.F.N. Lecce on behalf of Muon.
Trigger Offline Expert Report Simon George (RHUL), Ricardo Gonçalo (RHUL) Trigger General Meeting – 25 th November 2009.
News from Jet/Etmiss Monica. Jet/Etmiss meeting yesterday (25/5) at P&P week – Mostly review of conf notes for ICHEP10 – Good review to check where we.
Organisation of the Beatenberg Trigger Workshop Ricardo Gonçalo Higgs WG Meeting - 22 Jan.09.
Jet trigger news R.Gonçalo (LIP) D.Miller (Chicago) Jet trigger meeting 11 August 2014.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
Questions to Signature & Performance Groups Possibilities for tightening/adding selection cuts: comparison of online and offline selection cuts: – cuts.
Trigger Software Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) TAPM Open Meeting – April 12, 2007 Outline: Reminder of plans Status of infrastructure.
Correcting the energy sharing problem Jan Stark, LPSC Grenoble CAT Force meeting, May 27 th, 2003 Many thanks to Dean Schamberger, Robert Zitoun and Gregorio.
Latest News & Other Issues Ricardo Goncalo (LIP), David Miller (Chicago) Jet Trigger Signature Group Meeting 9/2/2015.
Trigger validation for Many thanks to Long Zhao, Chihiro Omachi, Julie Kirk, Giovanni Siragusa, Patricia Conde Muiño, Andreas Reinsch, Olya Igonkina,
PESAsim – the e/  analysis framework Validation of the framework First look at a trigger menu combining several signatures Short-term plans Mark Sutton.
Status of Monitoring in HLT ALgorithms Ricardo Gonçalo, RHUL – BNL Analysis Jamboree – Aug. 6, 2007.
Trigger Validation Olga Igonkina (U.Oregon), Ricardo Gonçalo (RHUL) on behalf of trigger community Physics Validation Meeting – Feb. 13, 2007.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Missing Et Before and After Shutdown Yuri Gershtein.
Current Analysis Activity/Results (Only brief overview) Sunil Bansal (Panjab University, Chandigarh) Approved results marked.
Trigger Offline Monitoring Report Experts: Jiri Masik, Ricardo Gonçalo Shifters: Iwona Grabowska-Bold, Holger von Radziewski, Gustavo Otero y Garzon, Michael.
Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1.
22 January 2009 David1 Look at dead material and fake MET in Jx samples mc08 10 TeV simulations, release J0 to J6 are tag s479_r586, ‘ideal geometry’
E/gamma report Ricardo Gonçalo for the e/γ slice.
Jet Slice – use of TopoClusters Ricardo Gonçalo (LIP) and David Miller (Chicago) For the Jet Trigger Group Trigger General Meeting – 20 August 2014.
L1Calo EM Efficiencies Hardeep Bansil University of Birmingham L1Calo Joint Meeting, Stockholm 29/06/2011.
Parton-level study of Z  l + l - for luminosity measurement Motivation PDF uncertainties Parton-level study & rate estimation Relaxed cuts & Conclusions.
10 January 2008Neil Collins - University of Birmingham 1 Tau Trigger Performance Neil Collins ATLAS UK Physics Meeting Thursday 10 th January 2008.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 Outline First look at the 2007 data with the offline reconstruction (~1000evts) : –Clusters. –Reconstructed Space points. FastOffline plots: –2 differents.
L1Calo EM Efficiency Maps Hardeep Bansil University of Birmingham L1Calo Weekly Meeting 07/03/2011.
CALORIMETER CELL MONITORING TOOL Viacheslav Shary.
MET Slice Monitoring Xiaowen Lei, Venkat Kaushik Ken Johns.
ATLAS B trigger Overview of B trigger Di-muon algorithms Performance (efficiency/rates) Menu for data taking experience 7/1/20101ATLAS UK Meeting,
1 QCD fits via TFractionFitter ● I took another look at the QCD fit problem: ● A fraction of the fits hangs in an infinite loop ● A (smaller) fraction.
Latest News & Other Issues
Monitoring of L1Calo EM Efficiencies
Some introduction Cosmics events can produce energetic jets and missing energy. They need to be discriminated from collision events with true MET and jets.
Jet Studies 1. Changes in seed finding for cone jets reconstruction
Online SW, DB & Calibration
Remaining Online SW Tasks
First look at data/MC comparison for period 8 reference runs
HLT Jet and MET DQA Summary
Yuxi Pan University of California, Los Angeles
Dilepton Mass. Progress report.
Run and Luminosity dependence of p17 NN b-tag
Presentation transcript:

Jet/MET Trigger On-Call Report Ricardo Gonçalo – LIP Jet Trigger Meeting – 31/3/2015

Reprocessings EnhancedBias from 2012 run Keys: – SM Key 38: MC_pp_v5_ATR10486 – L1 PS Key 11: MC_pp_v5_default_prescale – HLT PS Key 22: MC_pp_v5_ATR10486 – Release Key 9: Release: AtlasP1HLT, Menu: MC_pp_v5 Tags: r6470_p1831_p1831 Reco release: AtlasProduction, Different statistics in reference and reprocessed histos expected Looked at several chains and all seems fine 25/03/15R.Goncalo - Jet/MET on-call report2

25/03/15R.Goncalo - Jet/MET on-call report3

Run by Run RunDurationEndedEventsOnline Hist. Offline Hist. Obs mMon 09: OK Update web display mMon 18: No HLT chains mMon 18:521303Empty Stats too low mMon 22: OK spike eta=2 & phi= mTue 08: OK Update web display mTue 13: Empty No jet/MET active chain mTue 20: OKEmptyStats very low mTue 21: OK Low stats mWed 02: OK spike eta=2 & phi= mWed 09: OK spike eta=2 & phi= mWed 14: Empty Stats too low mWed 20: Empty No L1Calo mThu 08: OK spike eta=2 & phi= /03/15R.Goncalo - Jet/MET on-call report4

RunDurationEndedEventsOnline Hist. Offline Hist. Obs mFri 09: xe0 rejects events Jets ok MET empty All xe0 chains reject events… owse/ATR mSat 10: xe0 rejecting Jets ok Histos need update Updated xe online mon. Problem with HLT Lar (LArADC2MeVTool) mSat 11: Empty Only muon chains mSat 16: Empty Only muon chains mSun 08: Jet xe0 rejecting Jets ok Jet ok MET empty Only jet-based xe0 chain now misbehaves mSun 10: empty Only mu chains mSun 14: empty Only mu chains mSun 18: empty Only mu chains mMon 08: Jet xe0 & j0 reject MET empty 25/03/15R.Goncalo - Jet/MET on-call report5

DQ run sign off Procedures for on-call shifters: – Sign off here – List of runs to sign off from – both TRIG_HLT_MET and TRIG_HLT_JET – Instructions to be updated soon in the Jet/MET Expert Shift Instructions page: – Sign off on runs with no problems – Also sign off on runs which (justifiably!) have little stats – Create DEFECTS for runs with clear problems – Follow up on problems before either signing off or creating defects Runs signed off: – – comment: spike eta=2 & phi=-2.9 – – no HLT – – low stats – – no jet/met chains – – spike eta=2 & phi=-2.9 – Etc… Current list of missing runs to sign off: – /03/15R.Goncalo - Jet/MET on-call report6

Run Online histos: Spike in eta=2 phi=-2.9 Seen e.g. in HLT_j0_a10_nojcalib and several other FS chains (right) NOT in j0 PS chain! (bottom left) – Same for run etc 25/03/15R.Goncalo - Jet/MET on-call report7

Offline Monitoring Offline histos from DQ web display – Jet: one histo empty (eta vs phi) Configuration will be updated when goes to Tier0 – MET: Ony L1 generally filled (and seem ok) 25/03/15R.Goncalo - Jet/MET on-call report8

Run HT chain – low-HT spike visible in jet ET 25/03/15R.Goncalo - Jet/MET on-call report9

Normal behaviour of MET chains: – HLT xe35 (right) rejects some events – see comparison with xe0 (left) 25/03/15R.Goncalo - Jet/MET on-call report10

PS chain with 0 cut rejects events I.e. some events have 0 jets in PS but not in FS Above: EFJetHypo_j0_0eta320_ a4_tc_em_jes_FS Below: EFJetHypo_j0_0eta320_ a4_tc_em_jes_PS 25/03/15R.Goncalo - Jet/MET on-call report11

MET chains rejecting many events elisa log says this run had no L1Calo – (histo comes from HLT_xe0_tc_lcw_L1All chain?) Almost all events rejected in EFMetHypo_Jets_xe0_tclcw (up) Many more than usual rejected in EFMetHypo_TCPS_xe0_tclcw Zero events in xe35 histos 25/03/15R.Goncalo - Jet/MET on-call report12

Old calorimeter hot cell moved to phi=-1.2, eta=0.8 (top and middle right) for Distorted HLT XE plots for jet->xe chains – xe0 (bottom left) reject a higher fraction than xe35 (bottom centre) – A lot more monitoring xe plots than before! Spike at 40GeV in HT less visible or gone LAr ERROR: LArADC2MeVTool: Cannot load LArADC2DAC object with key… – See: 25/03/15R.Goncalo - Jet/MET on-call report13

MET monitoring /EXPERT/EFMissingET_Fex_2sidednoiseSupp/EF_MET_lin /EXPERT/EFMissingET_Fex_2sidednoiseSupp/EF_MET_log /EXPERT/EFMissingET_Fex_2sidednoiseSupp/EF_MET_phi /EXPERT/EFMissingET_Fex_2sidednoiseSupp/EF_MET_status /EXPERT/EFMissingET_Fex_2sidednoiseSupp/EF_MEx_log /EXPERT/EFMissingET_Fex_2sidednoiseSupp/EF_MEy_log /EXPERT/EFMissingET_Fex_2sidednoiseSupp/EF_MEz_log /EXPERT/EFMissingET_Fex_2sidednoiseSupp/EF_SumEt_lin /EXPERT/EFMissingET_Fex_2sidednoiseSupp/EF_SumEt_log /EXPERT/EFMissingET_Fex_2sidednoiseSupp/TotalEMTime /EXPERT/EFMissingET_Fex_2sidednoiseSupp/TotalHECTime /EXPERT/EFMissingET_Fex_2sidednoiseSupp/TotalLoadColTime /EXPERT/EFMissingET_Fex_2sidednoiseSupp/TotalLoopTime /EXPERT/EFMissingET_Fex_2sidednoiseSupp/TotalRegSelTime /EXPERT/EFMissingET_Fex_2sidednoiseSupp/TotalTileTime /EXPERT/EFMissingET_Fex_2sidednoiseSupp/compN_vs_compEt /EXPERT/EFMissingET_Fex_2sidednoiseSupp/compN_vs_compEt_lin /EXPERT/EFMissingET_Fex_2sidednoiseSupp/compN_vs_compEx /EXPERT/EFMissingET_Fex_2sidednoiseSupp/compN_vs_compEy /EXPERT/EFMissingET_Fex_2sidednoiseSupp/compN_vs_compEz /EXPERT/EFMissingET_Fex_2sidednoiseSupp/compN_vs_compSumE /EXPERT/EFMissingET_Fex_2sidednoiseSupp/compN_vs_compSumEt /EXPERT/EFMissingET_Fex_2sidednoiseSupp/compN_vs_compSumEt_lin /EXPERT/EFMissingET_Fex_2sidednoiseSupp/compStatus Many new MET FEX online monitoring plots Expert plots May need documentation But in principle very useful to debug issues 25/03/15R.Goncalo - Jet/MET on-call report14

Top: j0_0eta320_a10_tc_em_nojcalib_FS Bottom: j0_0eta320_a4_tc_em_jes_FS 25/03/15R.Goncalo - Jet/MET on-call report15

Summary Going to AtlasP1HLT today in principle (if it works) One reprocessing – all fine New MET monitoring plots Run : difference in behaviour of PS and FS (not unexpected) Mysteries for Aparajita: – From run : possible problem in MET: xe0 chains (seeded by L1All) rejecting events Jira: – Run : j0 chain rejecting more events than usual 25/03/15R.Goncalo - Jet/MET on-call report16