1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
Let’s Begin! Click the picture that answers the question correctly.
1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew.
TK Hemmick for the EIC Tracking R&D Group Letter of Intent for Detector R&D Towards an EIC Detector.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Further Progress T.K. Hemmick for the Tent Crew.
Tests of the LH2 target at GSI 2 nd -4 th april 2014 T. Hennino, C. Commeaux (IPN Orsay) T. Heinz, E. Schwab (GSI) The LH2 target.
1 Stony Brook Update Getting Serious about HBD East T.K. Hemmick for the Tent Crew.
Nov. 7 report (2 nd Nov. 7 of today) Hawaii/Marc.
Tent Update 5 Feb 2008 Matt Durham for tent crew.
Physical Cleaning Disconnect Power Open the Case.
1 Some Water Extreme Calculations TK Hemmick for the Tent Crew.
CsI Photocathode Production and Testing
1 Stony Brook Update: T.K. Hemmick for the Tent Crew.
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
The human circulatory system This system is one of the most important in the body. It is made up of 3 main parts: The heart The Lungs The blood vessels.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
1 Stony Brook Update Stretching your LEGS T.K. Hemmick for the tent crew.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Glove Box 31Aug05.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
1 Update on SB The Stony Brook Crew. 2 QE Reproducible in Addn’l Test Excellent QE again (basically identical). Excellent QE again (basically identical).
1 Stony Brook Update: Keep It Clean T.K. Hemmick for the Tent Crew.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
1 Thomas K Hemmick May 17 th, The Gas Electron Multiplier: GEM Thomas K. Hemmick Stony Brook University.
Prep for Gain Tests: Some Progress, Some Setbacks TKH for the Stony Brook Crew.
CHANGES IN STATES OF MATTER HEAT ENERGY ADDED.
1 Progress on Cathodes Thomas K Hemmick, Richard Hutter, Alberica Toia, Bill Anderson, Jason Kamin.
The Adventures of Sparky LeCroy TK Hemmick for the Stony Brook Crew and Maxim.
HBD Update (brief!) TK Hemmick. Spring Test: VERY few tracks  Avoiding the shadow of the local beam dump and other obstacles moved HBD out to about 40.
1 Stony Brook Update T.K. Hemmick for the Tent Crew.
Status Update Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.
1 Stony Brook Update: Ready to Start… T.K. Hemmick for the Tent Crew.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
1 Stony Brook Update Jason Kamin… the Cleaning Machine! T.K. Hemmick.
1 Stony Brook Update Bill and Ted’s Excellent Adventure T.K. Hemmick for the Wyld Stallions Excellent!!!
1 HBD Update Back to the Future T.K. Hemmick for the HBD crew.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Facilities 31Aug05.
Gold GEM Recovery Efforts/HBD Updates HBD Meeting 24 June 08.
1 Recent Updates Stony Brook Crew. 2 Maintenance Week Cryo Gate Valve –Dirt-like black substance on Valve—cleaned –Repair Successful; no more leaks. Rebuilt.
1 Stony Brook Update: What a long STRANGE TRIP its been T.K. Hemmick for the Tent Crew.
1 Stony Brook Update Leaks in LEGS and HBD West T.K. Hemmick for the Tent Crew.
Semester Exam Demo Project
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
1 Stony Brook Update Back to the Future T.K. Hemmick.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
1 Stony Brook Update: HBD Modifications… T.K. Hemmick for the Tent Crew.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
Update on HBD Activities at BNL Craig Woody BNL HBD Working Group Meeting November 16, 2004.
1 Stony Brook Update: Power Surprise… T.K. Hemmick for the Tent Crew.
1 Update from the Tent Thomas K Hemmick for the Tent People.
1 Stony Brook Update Cross Roads T.K. Hemmick for himself.
Get Electrical Services for Home & Business in Thornleigh
Get Electrical Services for Home & Business in Gordon
Find the Reliable Electrical Services in Macquarie Park
Refrigeration.
Light Bulb Changing Procedure
Overview control systems examples of control systems diagrams
Energy- and mass flows in cooling and in heat pumps
T.K. Hemmick for the Stony Brook Crew
T.K. Hemmick for the Stony Brook Crew
Stony Brook Update: Ready to Start…
T.K. Hemmick for the Stony Brook Crew
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
T.K. Hemmick for the Stony Brook Crew
The human circulatory system
Presentation transcript:

1 Stony Brook Update T.K. Hemmick for the Stony Brook Crew

2 Production Underway Again… Three cycles of 4 GEMs will complete HBD. –If no slipups… Plan to use extra pizza boxes to shave one day per cycle. 9 days possible…

3 Lots of Small Jobs Completed Inspect HBD #2 for materials –Remove foam sticky pads –Replace with bent solid wire Clean up the tent. Replenish supplies of consumables Replaced cryo compressor (now repaired) Cleansing pump. –Empty evaporator. –All boats heated way above CsI temp. Sorted GEMs into associated pizza boxes. Restart Glovebox and regenerate scrubbers. Replace gloves (hypalon on order…not sticky)

4 New GEMs look different Some of the GEMs have areas that are either discolored or have “scratchy” patches. Cleaning made no difference to this appearance. Discoloration

5 New GEMs Look Different Some are super shiny (but coarser texture) Shiny & RoughMatte & Smooth