Salton Sea Species Conservation Habitat Stakeholders Meeting June 10, 2010.

Slides:



Advertisements
Similar presentations
Summary of Aquatic Programs Administered by the WV Division of Natural Resources Dan Cincotta WVDNR P. O. Box 67 Elkins, WV
Advertisements

US Army Corps of Engineers BUILDING STRONG ® Restoration and Regulation Discussion Joseph P. DaVia US Army Corps of Engineers-Baltimore Chief, Maryland.
Gold Ray Dam Interagency Technical Team Meeting. NEPA Update Deconstruction Plans Hydraulic Modeling Next Steps Agenda.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
Division of State Lands’ Wetlands Program. Issues That Spawned State Wetlands Program (SB 3) Lack of detailed wetlands inventory information or guidance.
First Steps and Community Dialogue Liz Moran Ph.D. Linda Wagenet Ph.D. Nate Weeks P.E. August 18, 2011.
Yuba-Sutter Regional Conservation Plan EIS/EIR SCOPING MEETING January 6, 2015.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Clean Water Act Section 404 Basics Clean Water Act Section 404  Regulates discharges of dredged or fill material into waters of the U.S., including.
Trends in Stormwater Permitting Joyce Brenner, P.E. Chief of Stormwater Policy, Planning, and Permitting Division of Environmental Analysis Caltrans Headquarters.
Environmental Management Services
SCOPING MEETING FOR ENVIRONMENTAL IMPACT REPORT REQUIRED BY PUBLIC RESOURCES CODE SECTION 3161 (b)(3) AND (4) (SENATE BILL 4) (PAVLEY) C ALIFORNIA D EPARTMENT.
West Virginia University Natural Stream Restoration Program An Interdisciplinary Program Focusing on Research, Education, and Professional Services in.
1 Analytical Tools, Data & Scenarios Workshop July 29, 2004 California Water Plan Update 2004.
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
In-Delta Storage Process OverviewProcess Overview Program BenefitsProgram Benefits Project CostsProject Costs IssuesIssues Proposed Work Plan for FY 2003Proposed.
1 Beyond California Water Plan Update 2005 California Water and Environmental Modeling Forum Annual Meeting, March 3 rd, 2005.
California Natural Resources Agency U.S. Army Corps of Engineers.
1 Delta Levees Investment Strategy Delta Stewardship Council Central Valley Flood Protection Board Levees Workshop July 10, 2015.
Ballona Wetlands Restoration Sean Bergquist - Restoration Program Manager photo provided courtesy Jonathan Coffin.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Watershed-based Plan To Restore the Hackensack Meadowlands: The Meadowlands Comprehensive Restoration Implementation Plan Terry Doss and Karen Appell The.
Salton Sea Species Conservation Habitat Workshop June 10, 2010.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Water Supply Planning Initiative State Water Commission November 22, 2004.
1 South San Francisco Bay Salt Ponds Long-Term Restoration Planning.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
Planning and Permitting Part II: Permitting Overview S.P. Cramer & Associates, Inc. 636 Hedburg Way, Suite 22 Oakdale, CA
LOS OSOS WASTEWATER PROJECT UPDATE March 4, 2008.
FISCAL YEAR Discussion on Mid-Year Budget Adjustment: SAN JOAQUIN COUNTY DELTA ACTIVITIES 1 Tom Gau, Interim Director San Joaquin County Department.
PROSPECT ISLAND RESTORATION& THE FISH RESTORATION THE FISH RESTORATION PROGRAM AGREEMENT Dan Riordan Department of Water Resources.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
POCHE BEACH OCEAN OUTLET MAINTENANCE PERMIT STATUS San Clemente City Council Meeting July 19, 2011.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
11 Cap-and-Trade Auction Proceeds Funding Guidelines for Agencies that Administer California Climate Investments September
Draft South Coast MPA Monitoring Plan California Fish and Game Commission Stockton, 29 June 2011.
1 Poseidon Resources (Channelside), LLC Carlsbad Desalination Project Marine Life Mitigation Plan (MLMP) Marine Life Mitigation Site Selection and Preliminary.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
Proposition 1 Workshop: the Grant Application Process July 2015.
Multiple Species Habitat Conservation Plan Overview and Progress Marci Henson, Program Manager August 22, 2013.
Los Angeles District CERB June 4, 2009 Regional Sediment Management Plan Development throughout California Heather Schlosser Los Angeles District.
US Army Corps of Engineers Comprehensive Everglades Restoration Plan Master Recreation Plan.
Renewable Energy in California: Implementing the Governors Renewable Energy Executive Order California Energy Commission Department of Fish and Game Fish.
RECOVER Role/Science Guidance during Design, Construction and Implementation Phases RECOVER Science Meeting March 1, 2016.
West Sacramento Area Flood Control Agency November 10, 2011 Update on Current Levee Construction Projects and on the Southport Sacramento River Levee Early.
Agenda Item #10 Revised Process for State Expenditure Plan and Approval of Next Steps Doug Robison, PWS Gulf Consortium Meeting April 21, 2016 Hillsborough.
Yolo Bypass Salmonid Habitat Restoration & Fish Passage Environmental Impact Statement Environmental Impact Report Information Presentation to YBFEPT July.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
Office of the State Fire Marshal Pipeline Safety Division
Scoping Meeting April 20th 6:00 pm
Watershed-based Plan To Restore the Hackensack Meadowlands:
Task Force Activities We are working together on a new approach that identifies sources of PCBs and dioxins, directly applies a plan for reduction and.
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Department of Environmental Quality
Overview What is the CEQA environmental review process?
Fifth Standard Solar Project Complex
LID Guidance and Training for Southern California
Level 1B: Advanced Fundamentals Effective August 2018
Watershed-based Plan To Restore the Hackensack Meadowlands:
Presentation transcript:

Salton Sea Species Conservation Habitat Stakeholders Meeting June 10, 2010

2 Provide updates on Salton Sea activities Provide opportunity to hear informally from Stakeholders Provide information on Species conservation Habitat (SCH) Project to interested Stakeholders Meeting Purpose

3 Agenda Introductions Follow-up to last Stakeholders meeting Salton Sea Funding Assistance Program SCH Project update

4 Introduction of Presentation Team Rick Davis – Davis Group Kim Nicol – California Department of Fish and Game Rob Thomson – ENTRIX, Inc. Ramona Swenson – ENTRIX, Inc.

March Stakeholders Meeting Follow-up Response to Action Items

6 Request for More Stakeholder Participation Topic-specific workshops Review of materials as they are available and appropriate under NEPA/CEQA Need to balance Stakeholder participation with schedule management

7 Period 1 Activity Status Natural Resources Agency working with Department of Finance for clarification on whether SCH is a Period 1 activity Potential legislation to clarify spending authority under Section 2930 et seq.

8 Restoration Fund Update Salton Sea Restoration FundProp 84 FY 07/08FY 08/09FY 09/10FY 07/08FY 08/09FY 0910Total Appropriation2,741, ,829, ,739, ,300, ,750, ,296, ,657, Expenditures1,488, ,130, , , , ,982, Encumbrances7, , ,995, , ,079, Appropriation balance1,245, ,652, ,665, , ,836, ,296, ,594,763.45

Salton Sea Funding Assistance Program

10 Funding Assistance Program Two types of applications Habitat restoration Study, monitoring, or pilot projects Patterned after CalFED and Fisheries Grant Programs Currently is not a grant program Applications must be a nonprofit or public agency Applications must be consistent with the Salton Sea Restoration Act

11 Funding Assistance Program Selection process Administrative review External science review Technical review Selection panel To assure objective evaluation of proposals, reviewers or their organization must not have advocated in the past for any project Applicants must have completed their environmental compliance, including all permits, to receive funds Since they are State funds, CEQA must be completed

Salton Sea SCH Project Review and Update

13 Overview of Major Activities SCH alternatives development and refinement Goals and objectives/purpose and need Critical screening criteria Conceptual engineering Public outreach (NOI/NOP, scoping) Impact assessment planning Significance thresholds Key issues Process and schedule Special studies

14 Alternatives Development and Refinement Goals and objectives/purpose and need Critical screening criteria Conceptual engineering Species habitat requirements Range of potential components

15 Notice of Intent/Notice of Preparation Anticipated scoping period — June/July Anticipated scoping meetings July 7 UCR Palm Desert (1:00 p.m.) Torres Martinez Administrative Building (6:30 p.m.) July 8 Calipatria Inn and Suites (1:00 p.m.) Brawley Elks Club (6:30 p.m.) Public Outreach

16 Significance thresholds based on Initial Study checklist Salton Sea Programmatic EIR Review of potential project impacts Key environmental issues Biological resources Effects on common and special status fish and wildlife, habitat loss/degradation, potential for disease Hydrology/water quality Construction-related impacts, changes in pond water quality, potential reduced freshwater inflow into the Sea, reduced downstream river flows Complete list in NOI and NOP Process and schedule Impact Assessment Planning

17 NEPA/CEQA scoping – June/July 2010 Draft NEPA/CEQA document – late 2010, early 2011 Draft permit applications – early 2011 Final NEPA/CEQA document – mid 2011 Final design – mid to late 2011 Permits complete – mid to late 2011 Begin construction – late 2011, early 2012 Anticipated Schedule

18 UC Riverside Hydrology, temperature, and water quality Selenium ecorisk Soil and water contaminants Fish tolerance UC Berkeley Assessing selenium issues/pilot study Special Studies

19 Scripps Bathymetric surveys EIS/EIR Team Focused surveys for southwestern willow flycatcher and least Bell’s vireo to fill data gaps If needed, other surveys will fill critical data gaps Geotechnical studies Special Studies

SCH Project Workshop Updates

21 SCH Project goals and objectives Critical screening criteria Construction challenges Morning Workshop Highlights

22 Problem Selenium in the water and sediments poses a potential ecological risk for fish and wildlife at the SCH Project Purpose of expert workshops To obtain expert input on treatment technologies and management strategies to reduce potential effects of selenium on fish and wildlife Selenium Expert Workshops

23 Workshop 1: Selenium Treatment Technologies Purpose Review potential selenium treatment technologies Identify promising treatment techniques to test in pilot studies Participants Working group of scientists with selenium expertise Familiar with Salton Sea issues Provided technical input on Salton Sea PEIR

24 Workshop 1: Approach Reviewed effectiveness, feasibility, cost and applicability of several treatment technologies Physical – reverse osmosis, nanofiltration, ion filter Chemical – zero valent iron Biological – constructed wetlands, algal, bacterial Identified information gaps and research questions for the most promising technologies

25 Workshop 1: Recommendations Biological treatment of water most promising technique Constructed wetlands Algal treatment (Controlled Eutrophication Process) Anaerobic bacterial reduction Physical treatments extremely costly Chemical treatment complex, intensive, and costly Recommendations to be summarized in technical memorandum

26 Purpose Develop comprehensive plan to reduce SCH selenium ecorisk Identify remediation measures to reduce selenium ecorisk Approach Working group of scientists with selenium expertise Late August/September workshop Review applicable treatment techniques/best management practices Recommendations summarized in a technical memorandum Workshop 2: Selenium Management Plan

27 SCH Information Dissemination Website ( Stakeholders meetings/workshops Periodic newsletters Public meetings

28 Contact Information DFG Contact: Kim Nicol, Environmental Program Manager California Department of Fish and Game Country Club Drive, Suite 109 Bermuda Dunes, CA (760) USACE Contact: Lanika Cervantes, Project Manager San Diego Section, Regulatory Division U.S. Army Corps of Engineers - Los Angeles District 6010 Hidden Valley Road, Suite 105 Carlsbad, CA (760)